Information
-
Service order number
-
Customer Address
-
Prepared by
-
Pole Inspection Date
-
Date of installation (For dispatch purposes)
Pole visual inspection for UFB services
-
Pole ID
-
Pole address
-
Pole GPS Co-ordinates
-
Accessibility
-
Pole type
Assessment for UFB purposes
-
Pole Tagged?
-
Special Purpose Pole? (Is it Stab pole, brace pole, pole with jockey arms)
- Yes > Unsuitable pole
- No
-
Does the pole support electrical conductors crossing elevated motorways, overpasses or navigable waterways?
-
Does the pole support electrical conductors crossing limited access motorways, overpasses, waterways or railways?
-
Is the pole located inside boundary on a ROW, shared driveway, long driveway or any private land?
-
Is the pole, a double or H-frame pole, supporting transformers, switches (air break switch) or supporting spans longer than 100m?
-
Is there/will there be Chorus UFB/NGA from the top to bottom of the pole?
-
Vierendeel pole?
-
Does the pole have multiple aerial cables attached ? (only 3rd Party distribution cables like VF)
-
Number of services
-
Does the pole have an 11kV or higher electricity underground cable riser attached to the pole or does it have electricity earthing conductors installed?
Testing
-
Testing beyond hammer, probe and visual inspection required?
-
If yes please explain briefly why testing is required
Photos
-
Photo of pole showing pole ID
-
Photo of full aerial fibre route annotating the ownership of each pole