Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Date and time of audit

AUDIT CONDITIONS

  • Select any that apply

  • Sunny

  • Cloud

  • Showers

  • Rain

  • Wind

STATION SPECIFIC CLEANING TASKS

Item 1.0 Platform and Shelter

  • Frequency = as required

  • 1.1 Platform shall be swept/cleared on each visit and kept free of all dirt, debris, litter etc., with the collected material being removed from site and disposed of by the Contractor at an authorised Territorial Authority refuse centre.

  • 1.2 Wads of gum, fluid spills and all other sticky substances shall be removed from the area.

  • 1.3 Handrails, joinery, warning signs, guards and other metal surfaces shall be cleaned and polished.

  • 1.4 Wall surfaces up to a height of 2.0m shall be free of finger marks, smudges, dirt spots and grime of any kind.

  • 1.5 Seating shall be wiped down and left in a dry state.

  • 1.6 Grates, gullies and channels shall be maintained free of debris and litter

  • 1.7 Graffiti and stickers must be removed.

  • 1.8 Vegetation growing through platform cracks etc must be removed.

  • 1.9 Loose rubbish is to be collected, and disposed of by the contractor at an authorised territorial authority refuse centre. Items such as cans, glass and plastics are to be sorted and recycled

Item 2.0 Subway

  • Frequency = As required

  • 2.1 There shall be no streaks, fluid splashes or spots remaining on wall tiles, surfaces or signs.

  • 2.2 There shall be no smudges or spots remaining at points where cleaning of the lower and upper halves of the walls overlap.

  • 2.3 Graffiti, gum, fluid spills and all stickers must be removed. (painted over if necessary)

  • 2.4 Handrails, joinery, warning signs, guards and other metal surfaces shall be cleaned and polished.

  • 2.5 Floor and ramps to be swept with the collected material being removed from site and disposed of by the contractor at an authorised territorial authority refuse centre. Items such as cans, glass and plastics are to be sorted and recycled

  • 2.6 Wads of gum, fluid spills and all other sticky substances shall be removed from the area.

  • 2.7 Water channels, sumps and gratings shall be maintained free of dirt/debris and litter or loose materials.

  • 2.8 Sump rooms to be kept clean and tidy. All sump rooms to be checked monthly against the pre agreed check list.

Item 3.0 Building Exterior Wall Cleaning

  • Frequency = as required

  • 3.1 There shall be no streaks, fluid splashes or spots remaining on walls or signs.

  • 3.2 There shall be no smudges, or spots at points where cleaning of the lower and upper Halves of the walls overlap.

  • 3.3 Wall shall be uniformly clean all over.

  • 3.4 Woodwork on doors, windows and mouldings shall be clean.

  • 3.5 Glass surfaces shall be clean and free of any smudges, finger marks and dirt.

Item 4.0 Subway Sump Pump

  • Frequency = 2 Monthly

  • 4.1 To be force tested by a suitably qualified person and deemed as satisfactorily performing.

  • 4.2 Where the sump pump is not performing satisfactorily GWRL is to be notified and provided with a recommendation to remedy this. - As Required

Item 5.0 Signage (including posters, timetables etc.)

  • Frequency = as required

  • 5.1 Signs and poster boards shall be wiped down so that there are no finger marks, smudges and other dirt spots of any kind.

  • 5.2 Stickers and wads of gum, fluid spills and all other sticky substances shall be removed.

Item 6.0 Graffiti removal not exceeding 0.130m2 (A3 page size) and reporting

  • Frequency = Each visit

  • 6.1 All areas within the highlighted areas on the Station-specific Specification plans must monitored for graffiti.<br>Any graffiti not exceeding 0.130m2 (A3 page size) which is identified must be removed immediately.<br>Statistics on how much graffiti of this size, which was located over the month for each station must be supplied to KiwiRail’s security manager monthly. This information must also be provided to GWRL as part of the monthly report and on a GWRL accessible system allowing instant retrieval to ensure payment.

OTHER TASKS

Item 1.0 lighting

  • Frequency = as required

  • 1.1 Lighting faults to be repaired/replaced are to be reported as soon as possible to GWRL with an accompanying quote for the work. Lighting repairs/replacements (other than urgent health and safety work) must be authorised by GWRL before any work is undertaken. Lighting requiring urgent Health and safety action are to be dealt within the following time scales.<br><br>Platform Light – 24 hours from time of fault ID<br>Security Light – 24 hours from time of fault ID<br>Internal Light – 48 hours from time of fault ID<br>- As Required

Item 2.0 Rail corridor cleaning

  • Frequency = Monthly

  • 2.1 Rail corridor to have a walkover litter collection done for the length of the platform only, with the collected material being removed from site and disposed of by the Contractor at an authorised Territorial Authority refuse centre, items such as cans, glass and plastics are to be sorted and recycled.

Item 3.0 Minor maintenance and damage reporting.

  • Frequency = Each visit

  • 3.1 Check for and report all signs of degradation or damage to GWRL. Where damage constituting works less than $500 is identified it shall be reported to GWRL immediately with a quote for repair. The repair must work must only be undertaken after written confirmation from GWRL.<br>Damage above this value must be reported to GWRL with a quote for repair. GWRL may either refer this work back to the Contractor subject to agreement on price or award the work to a party outside of this contract.<br>Where damage which presents a risk to public or personal safety is identified, the Contractor is to temporarily make safe the area and notify GWRL immediately.<br>All damage shall be photographed prior to repair.<br>Photographs of all completed works and monthly report must be provided to GWRL with the invoice to ensure payment.

Item 4.0 Graffiti removal exceeding 0.130m2 (A3 page size) and reporting.

  • Frequency = Each visit

  • 4.1 All areas within the highlighted areas on the Station-specific Specification plans must be monitored for graffiti.<br>Any graffiti exceeding 0.130m2 (A3 page size) but not exceeding 2.0m2 must be photographed with clear and readable measure in the photo before being removed.<br>Any graffiti exceeding 2.0m2 shall be photographed with clear and readable measure in the photo. The photo is to be emailed to GWRL within 24 hours with a quote for its removal (this quote must be inclusive of labour and materials). GWRL may either refer the removal work back to the Contractor subject to agreement on price or award the work to a party outside of this contract.<br>The photos and the statistics on how much graffiti that was located over the month for each station is to be supplied to KiwiRail’s security manager on a monthly basis. This information must also be provided to GWRL as part of the monthly report and on a GWRL accessible system allowing instant retrieval to ensure payment. The information should be separated into the size brackets indicated on the schedule of prices.<br>

Item 5.0 Low frequency tasks

  • Frequencies as indicated on each item

  • 5.1 Wash down steel framework on underside of roof using light detergent, water and a soft broom. 2 Monthly

  • 5.2 Clean out and dispose of debris from the internal roof guttering on the shelter - 3 Monthly

  • 5.3 Fully wash down shelters inside and out including ceilings, internal surfaces, walls and ledges/slots using light detergent, water and a soft broom. - 2 monthly

  • 5.4 CCTV cameras/domes and lenses to be cleaned where possible. - As Required

  • 5.5 Provisional items - As instructed

PERFORMANCE INCENTIVES

  • Non Conformance Items Present during the audit?

  • Great work - no contract deductions applicable.

  • Contract deduction of $400 - deduction to take effect on invoice and report for month following this audit

  • Contract deduction of $600 - deduction to take effect on invoice and report for month following this audit

  • Contract deduction of $1,200 - deduction to take effect on invoice and report for month following this audit

  • Contract deduction of $2,200 - deduction to take effect on invoice and report for month following this audit

  • General Comments

  • SRL representative Signature

  • Auditors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.