Information
-
Read Preamble/Audit Methodolgy
http://goo.gl/0memcJ -
Step 1 - On Site Inspections
Fill out for randomly selected worksite
Step 2 - Contractors Records
Select last 2 compiled documents given by contractor and complete audit
Step 3 - Electric Line Clearance Audit
Randomly select 6 roads and complete audit
Audits need to be completed 3 times a year -
Document No.
-
Prepared by
Step 1
Audit Information
-
Location
-
Date of Audit
-
Auditor
-
Name of Contractor
Audit
-
All staff hold appropriate tickets to undertake works
-
EPV has current weight test certificates
-
EPV has current electrical testing certificate
-
All necessary signage is in place
-
Restricted entry into worksite
-
Traffic Management Plan on site if necessary
-
All workers with necessary PPE
-
Correct use of safety harness
-
JSA available on site
-
Debris cleaned everyday
-
Pruning to Australian Standards standard
-
Tree stump removed by stump grinding machine if applicable
-
Risk Assessment on site and all works undertaken according to that
Completed
-
Comments
-
Signature
Audit 2
Audit Information
-
Location
-
Date of Audit
-
Auditor
-
Name of Contractor
Audit
-
Road Name
-
Date of actual work done
-
Records checked by
-
Number of trees pruned was recorded
-
Evidence of pre-work inspection by Parks & Gardens supervisor
-
Record of all staff on site each day
-
Recorded details of plants pruned every day (tree genus)
-
Inspection of record by Parks & Gardens Team Leader
-
Record of equipment on site for each day
-
Inspection (pruning) lists on site and filled in accurately
-
Are there any environmental/culturally significant trees on the pruning list?
-
Are there any habitat (breeding) trees on the pruning list?
-
Does any fauna need to be relocated?
-
Is there any cutting/removals deemed urgent on the pruning list?
-
Have all affected persons been notified of urgent works (if any)?
-
Are any trees on the pruning list deemed hazardous?
-
Is an Arborist required to audit any hazardous trees on the pruning list?
Completed
-
Comments
-
Signature
Explaination
-
The next sections will be the 6 individually audited locations. Pay attention to the heading at the top of the section to check the location is correct (eg, Stawell 1 should be in Stawell). The arrows in the blue bar at the top of the page (< >) will allow you to move between the sections.
Stawell 1
Stawell 1
Audit Information
-
Road Name
-
Date of Audit
-
Auditor
-
Name of Contractor
Audit
-
Bushfire Risk
-
Are lines transmitting less than 22KV present?
Up to 22KV
-
Minimum clearance space at section of spans near the pole > 1000mm
-
Minimum clearance space at span up to and including 45m > 1000mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting between 22-66KV present?
Between 22KV - 66KV
-
Minimum clearance space at section of spans near the pole > 1500mm
-
Minimum clearance space at span up to and including 45m > 1500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting more than 66KV present?
Over 66KV
-
Minimum clearance space at section of spans near the pole > 2250mm
-
Minimum clearance space at span up to and including 45m > 2500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 3000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 3500mm
-
Minimum clearance space at span exceeding 100m > 3500mm
Stawell 2
Stawell 2
Audit Information
-
Road Name
-
Auditor
-
Date of Audit
-
Name of Contractor
Audit
-
Bushfire Risk
-
Are lines transmitting less than 22KV present?
Up to 22KV
-
Minimum clearance space at section of spans near the pole > 1000mm
-
Minimum clearance space at span up to and including 45m > 1000mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting between 22-66KV present?
Between 22KV - 66KV
-
Minimum clearance space at section of spans near the pole > 1500mm
-
Minimum clearance space at span up to and including 45m > 1500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting more than 66KV present?
Over 66KV
-
Minimum clearance space at section of spans near the pole > 2250mm
-
Minimum clearance space at span up to and including 45m > 2500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 3000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 3500mm
-
Minimum clearance space at span exceeding 100m > 3500mm
Stawell 3
Stawell 3
Audit Information
-
Road Name
-
Auditor
-
Date of Audit
-
Name of Contractor
Audit
-
Bushfire Risk
-
Are lines transmitting less than 22KV present?
Up to 22KV
-
Minimum clearance space at section of spans near the pole > 1000mm
-
Minimum clearance space at span up to and including 45m > 1000mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting between 22-66KV present?
Between 22KV - 66KV
-
Minimum clearance space at section of spans near the pole > 1500mm
-
Minimum clearance space at span up to and including 45m > 1500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting more than 66KV present?
Over 66KV
-
Minimum clearance space at section of spans near the pole > 2250mm
-
Minimum clearance space at span up to and including 45m > 2500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 3000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 3500mm
-
Minimum clearance space at span exceeding 100m > 3500mm
St Arnaud 1
St Arnaud 1
Audit Information
-
Road Name
-
Date of Audit
-
Auditor
-
Name of Contractor
Audit
-
Bushfire Risk
-
Are lines transmitting less than 22KV present?
Up to 22KV
-
Minimum clearance space at section of spans near the pole > 1000mm
-
Minimum clearance space at span up to and including 45m > 1000mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting between 22-66KV present?
Between 22KV - 66KV
-
Minimum clearance space at section of spans near the pole > 1500mm
-
Minimum clearance space at span up to and including 45m > 1500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting more than 66KV present?
Over 66KV
-
Minimum clearance space at section of spans near the pole > 2250mm
-
Minimum clearance space at span up to and including 45m > 2500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 3000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 3500mm
-
Minimum clearance space at span exceeding 100m > 3500mm
St Arnaud 2
St Arnaud 2
Audit Information
-
Road Name
-
Date of Audit
-
Auditor
-
Name of Contractor
Audit
-
Bushfire Risk
-
Are lines transmitting less than 22KV present?
Up to 22KV
-
Minimum clearance space at section of spans near the pole > 1000mm
-
Minimum clearance space at span up to and including 45m > 1000mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting between 22-66KV present?
Between 22KV - 66KV
-
Minimum clearance space at section of spans near the pole > 1500mm
-
Minimum clearance space at span up to and including 45m > 1500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting more than 66KV present?
Over 66KV
-
Minimum clearance space at section of spans near the pole > 2250mm
-
Minimum clearance space at span up to and including 45m > 2500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 3000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 3500mm
-
Minimum clearance space at span exceeding 100m > 3500mm
St Arnaud 3
St Arnaud 3
Audit Information
-
Road Name
-
Date of Audit
-
Auditor
-
Name of Contractor
Audit
-
Bushfire Risk
-
Are lines transmitting less than 22KV present?
Up to 22KV
-
Minimum clearance space at section of spans near the pole > 1000mm
-
Minimum clearance space at span up to and including 45m > 1000mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting between 22-66KV present?
Between 22KV - 66KV
-
Minimum clearance space at section of spans near the pole > 1500mm
-
Minimum clearance space at span up to and including 45m > 1500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 2000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 2500mm
-
Minimum clearance space at span exceeding 100m > 2500mm
-
Are lines transmitting more than 66KV present?
Over 66KV
-
Minimum clearance space at section of spans near the pole > 2250mm
-
Minimum clearance space at span up to and including 45m > 2500mm
-
Minimum clearance space at span exceeding 45m, up to and including 70m > 3000mm
-
Minimum clearance space at span exceeding 70m, up to and including 100m > 3500mm
-
Minimum clearance space at span exceeding 100m > 3500mm
Completed Individual Audits
-
Once all 6 locations have been audited, complete this section
Completed
-
Comments
-
Signature