Title Page
- Site conducted
-
Conducted on
-
Prepared by
Project Information
-
Work Order Number / Purchase Order Number
-
Project Start Date
-
Project Completion Date
Contractor Declaration
-
I certify that all works have been completed to the specified standard
-
Name of Contractor Representative
Client Declaration
-
I certify that all works have been completed to my satisfaction and I have accepted handover of the property. The Defects Liability Period will end 12 Months from this Date.
-
Name of Client Representative:
-
Role of Client Representative:
Referrals
-
Are there any issues which need to be referred to the Housing Management Team?
-
Are there any issues which need to be referred to the Regional Asset Team?
Scaffold
-
Has the Scaffold Been Struck?
-
If the Scaffold is still in-situ please list the works to be completed following the Scaffold strike:
Completed Works (Tick As Appropriate)
-
Choose the Completed Works from the List
- Main Roofing Works
- Rear Roofing Works
- Windows Replacement
- Window Repairs
- Preparation and Render Repairs
- External Redecoration
- Brickwork - Main Building and Boundary Walls
- Internal Communal Decorations
- Internal Communal Flooring
- Internal FRA Works - Door closers, Meter Cupboards, Signage
- Clip back cables
- Waste Pipes Replaced / Fixed
- Main Entrance Step
- External Paving
- Fencing and Railings
- General Cleaning of Area upon Removal of Scaffold
-
List Any Workmanship and Quality Issues
-
Snags Identified - Please Illustrate
-
Number of Snags at Handover
Omitted Works
-
List any works omitted from the Original Scope
Stock Condition Data Collection
-
Window Type 1 - Tick As Required
- PVCu Double Glazed
- PVCu Single Glazed
- PVCu Triple Glazed
- Metal Double Glazed
- Metal Single Glazed
- Metal Triple Glazed
- Timber Double Glazed
- Timber Single Glazed
- Timber Triple Glazed
- Metal and Timber Double Glazed
- Metal and Timber Triple Glazed
- No Window Type 2
-
Confirm Quantity of Window Type
-
Window Type 2 - Tick As Required
- PVCu Double Glazed
- PVCu Single Glazed
- PVCu Triple Glazed
- Metal Double Glazed
- Metal Single Glazed
- Metal Triple Glazed
- Timber Double Glazed
- Timber Single Glazed
- Timber Triple Glazed
- Metal and Timber Double Glazed
- Metal and Timber Triple Glazed
- No Window Type 2
-
Confirm Quantity of Window Type
-
Main Roof Structure
- Flat
- Mansard
- Monopitch
- Pitched
-
Main Roof Finish
- Artificial Slate (M2)
- Asphalt (M2)
- Blue Roof (M2)
- Brown Roof (M2)
- Clay Tiles (M2)
- Concrete Tiles (M2)
- Felt (M2)
- Green Roof (M2)
- GRP (M2)
- Lead (M2)
- Liquid Plastic (M2)
- Natural Slate (M2)
- Profiled Sheet (M2)
- Zinc (M2)
-
Loft Insulation Upgrade
-
Secondary Roof Structure
- Flat
- Mansard
- Monopitch
- Pitched
-
Secondary Roof Finish
- Artificial Slate (M2)
- Asphalt (M2)
- Blue Roof (M2)
- Brown Roof (M2)
- Clay Tiles (M2)
- Concrete Tiles (M2)
- Felt (M2)
- Green Roof (M2)
- GRP (M2)
- Lead (M2)
- Liquid Plastic (M2)
- Natural Slate (M2)
- Profiled Sheet (M2)
- Zinc (M2)
-
Main Entrance Door or Front Entrance Door (Single Dwelling)
- Composite
- Metal
- Patio Metal
- Patio Other
- Patio PVCu
- Patio Timber
- PVCu
- Timber
- Not Applicable
-
Secondary Entrance Door or Rear Entrance Door (Single Dwelling)
- Composite
- Metal
- Patio Metal
- Patio Other
- Patio PVCu
- Patio Timber
- PVCu
- Timber
- Not Applicable
Any Other Information
-
List Any Other Useful Information