NICEIC QS Inspection

  • Project Name:

  • Project Number:

  • Inspection Date:

  • Inspected by:

  • Stage of install audit is carried out:

Safe Systems of Work

  • RAMS Covering all electrical works

  • Safe Isolation procedure documented

  • Appointed Person in place

  • Lock Off Kits available if required

  • Calibration Certificates for any test equipment

Source of supply

  • DNO Service Head & Meter Install

  • Correct cable size from DNO to Consumer side.

  • Separate Main Isolator installed (if required)

  • Generator installed correctly (if required)

  • Generator cable sized correctly?

Earthing

  • Main Earth Bar Installed

  • Main Earth Connected

  • Main Earth sized correctly?

  • Main Protective Bonds Connected

  • Main Protective Bonds sized correctly?

  • Earth Mat installed (if required)

  • Has a copy of the Earth Mat Certificate been issued?

  • Who has cert been issued to?

  • Lightning Protection Tapes and rods installed

  • Has a copy of the Lightning Protection Certificate been issued?

  • Who has Cert been issued to?

  • Bonding Clamps tight

  • Safety Electrical Connection labels fitted

  • Earth Tags fitted to metal back boxes

  • Cross bonding of containment

First Fix Containment

  • Has first fix containment commenced?

  • All cut metal Galvanised Sprayed

  • All unistruts have end caps

  • All bracketry fixed with a fire rated fixing

  • Brackets either side of a Fire Wall must be 150mm away maximum

  • Appropriate distance between brackets for all containment, maximum as per table D1, D3 & D4 of BS7671

  • All containment to have a minimum 20% spare capacity

  • Secure fixing of all containment

  • All bracketry square with containment & level

  • Trunking to have no open holes

  • All external metal containment & strut Hot Dipped Galvanised

  • Conduits have no more than 180deg total bends between inspection boxes or accessories

  • Trunking lids are complete

  • Trunking lids have sufficient number of camlocks

  • All back boxes installed at correct heights

  • All back boxes within fire walls to have Putty Pad installed and signed off on register

First Fix Wiring

  • Has first fix wiring commenced?

  • Cables run within correct zones in walls

  • Cables sized correctly for use

  • Cable ties used throughout on ladder, basket and tray

  • Metal cable ties used every 1m on ladder, basket and tray on vertical drops and escape routes. (Cat6 to be around the external side of containment, not directly on cables)

  • Cables are not burned or snaged/cut insulation

  • LV & ELV circuits segregated

  • Cables are not under strain round bends

  • Cables are supported sufficiently in their entirety

  • Cat6 Data cable Velcro tie wrapped only

Second Fix Accessories

  • Has second fix commenced?

  • All terminations tight and correct

  • All accessories free from damage

  • Correct IP ratings used for outdoors & special locations

  • Correct identification of cables used, including sleeving

  • Mechanical isolators can be locked in the OFF position

  • All accessories installed level and tight

Distribution Boards/Panels

  • Has switchgear installation commenced?

  • All freestanding LV panels to have a built in plinth

  • All SWA's to have Critchley marker with circuit details on them both ends

  • All wall mounted DB's mounted at a suitable height & uniform throughout if more than 1

  • All DB's metal, & correct IP rating for outdoor use

  • All DB's wrapped in suitable sized Trunking with a minimum 20% spare capacity

  • All DB cable entries slotted not bushed

  • All DB's have Paxolin between trunking and DB

  • Only circuits fed from DB are in the DB, no other circuits passing through

  • Correct ACB, MCCB, MCB & RCBO ratings used

  • All cables leaving terminations within DB to have circuit reference

  • All barriers present

  • No cable ties holding cables in place within DB

  • All shrouds within DB fitted

  • DB lids have no screws missing

  • DB lids lockable

  • DB/Panel blanks fitted

  • Voltage Warning stickers fitted to DB's and JB's

  • SPD Installed sticker fitted

  • Date of Next Inspection' sticker fitted

  • RCD 6 monthly test noticed fitted

  • Electric Shock notice fitted next to DB/Panel

  • DB schedule fixed next to or on the lid of DB/Panel

  • Rubber floor matting fitted by all LV Panles and DB's (where required)

Testing & Inspection

  • Has testing and inspection commenced?

  • Ze is within Maximum for Earthing Type

  • PFC is within Main Breaker breaking capacity

  • Zs of final circuits are within their maximum allowed

  • RCD times are less than 40ms @ 5x

Declaration

  • Have all Major issues been rectified from previous audit?

  • Have all Minor issues been rectified from previous audit?

  • Does site team have any queries with issues raised?

  • Site team comments (if required):

NOTE: Any defects marked MAJOR must be rectified within 24hrs and evidence given. Any defects marked MINOR must be rectified before next inspection

Position

  • NICEIC QS Sign

  • Supervisor Sign

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.