Information
-
Conducted on
-
Job Name / Job Number
-
Superintendent
GENERAL SAFETY
-
1. OSHA Posters
-
Corrective action taken.
-
Date corrected
-
2. Emergency Procedures In Place
-
Corrective action taken.
-
Date corrected
-
3. Emergency Postings
-
Corrective action taken.
-
Date corrected
-
4. SDS Available
-
Corrective action taken.
-
Date corrected
-
5. Sub Safety Program On Hand
-
Corrective action taken.
-
Date corrected
-
6. Head Protection
-
Corrective action taken.
-
Date corrected
-
7. Eye Protection
-
Corrective action taken.
-
Date corrected
-
8. Hearing Protection
-
Corrective action taken.
-
Date corrected
-
9. Proper Footwear
-
Corrective action taken.
-
Date corrected
-
10. Housekeeping
-
Corrective action taken.
-
Date corrected
-
11. Fall Protection
-
Corrective action taken.
-
Date corrected
-
12. Guardrails
-
Corrective action taken.
-
Date corrected
-
13. Floor Openings Protected
-
Corrective action taken.
-
Date corrected
-
14. G.F.C.I. / Extension Cords
-
Corrective action taken.
-
Date corrected
-
15. Electrical Equipment
-
Corrective action taken.
-
Date corrected
-
16. Power Lines & Utilities
-
Corrective action taken.
-
Date corrected
-
17. Excavations / Competent Person
-
Corrective action taken.
-
Date corrected
-
18. Soil Type Determined
-
Manual Test Performed
-
Visual Test Performed
-
19. Protective System Adequate
-
Corrective action taken.
-
Date corrected
-
Add media
-
20. Spoil Piles Properly Placed
-
Corrective action taken.
-
Date corrected
-
21. Access to Excavation
-
Corrective action taken.
-
Date corrected
-
22. Scaffold / Guardrail
-
Corrective action taken.
-
Date corrected
-
23. Scaffold / Access
-
Corrective action taken.
-
Date corrected
-
24. Flammable Liquids
-
Corrective action taken.
-
Date corrected
-
25. Compressed Gas Cylinders
-
Corrective action taken.
-
Date corrected
-
26. Fire Extinguishers
-
Corrective action taken.
-
Date corrected
-
27. Crane / Hoist Operations
-
Corrective action taken.
-
Date corrected
-
28. Crane Operators Certified
-
Corrective action taken.
-
Date corrected
-
29. Rigging Inspections
-
Corrective action taken.
-
Date corrected
-
30. Equipment Operations
-
Corrective action taken.
-
Date corrected
-
31. Equipment Warning Devices
-
Corrective action taken.
-
Date corrected
-
32. Roll Over Protection
-
Corrective action taken.
-
Date corrected
-
33. High Visibility Clothing
-
Corrective action taken.
-
Date corrected
-
34. Traffic Control / Signage
-
Corrective action taken.
-
Date corrected
-
35. Forklift Operators Certified
-
Corrective action taken.
-
Date corrected
-
36. Chemicals / Labeling
-
Corrective action taken.
-
Date corrected
-
37. Hand Tools
-
Corrective action taken.
-
Date corrected
-
38. Ladders / Stairways
-
Corrective action taken.
-
Date corrected
-
39. Rebar Protection
-
Corrective action taken.
-
Date corrected
General Observations (list any item not covered in audit or positive comments below)
Inspector Signature
-
Add signature
Project Superintendent Signature
-
Add signature