PRE-CAMP MOVE TOOLBOX
PRE-CAMP MOVE TOOLBOX
-
Camp Number:
-
Todays Date:
-
PRESENT AT TOOLBOX: Truck Drivers etc. must be present for toolbox. Trailer positions to be followed closely and governed by appropriate drawings supplied in this document. ote: Any personnel involved in the activity must read, understand, and sign the toolbox.
Sign Off (all involved)
-
Name/Signature
-
HSE Discussion Points, Risks & Hazards - i.e. Manual Handling, Fatigue, UV Exposure, Hard Hat to be worn when trucks involved, High Risak tasks SWPs to be reviewed
-
Inspections to be Conducted (including Weed & Seed Certificates)
-
FOOD SAFETY & Hygiene Discussed
Fridge/Freezer Temp
-
Freezer Time
-
Freezer Temperature
-
Fridge Time
-
Fridge Temperature
-
Personnel in Training
-
Other Discussion Points
-
Camp Manager Sign-Off
RIG - DOWN
NMC CAMP RIG – DOWN CHECKLIST
-
Confirm with client 48 hours and 24 hours prior to Camp move that Camp move plans have not changed (D,T,L)
-
Check all tyres to ensure they are inflated
-
Camp Site Supervisor to contact NMC and Transport Company immediately of any changes
-
Arrange Sewage tanks or STP to be emptied prior to move and rubbish bin transported to new site
-
Arrange Weed and Seed Certificates prior to Camp move (if required)
-
Arrange to have Grey Water Tank emptied and moved to new location (if on location)
-
Conduct vehicle Pre-Start check as per companies' checklist - ensure communication equipment is operational
-
Remind staff of responsibilities and buddy system / conduct pre toolbox meeting / full PPE for staff
SLEEPER UNITS
-
Raise landing legs if they are the Razor motor type prior to disconnecting power
-
Pack up walkways and place in holder and secure with Two ratchet straps per holder (Trailer)
-
Pack away manifold system and potable water hoses / ensure all open Camlocks fittings are covered
-
Check each bedroom and bathroom ensure windows are closed, all loose items secure, cupboards and doors
-
locked and secure, chairs secured, TV locked in place and straps on A/C unit and TV units close all internal doors
-
Shut or tape up all under bed vents, wall vents and bathroom vents
-
Shut down power to Sleeper units by switching of mains switch in switch board. Use test buttons on RCDs.
-
Switch off power to sleeper unit by turning off the switch at the 32 Amp power point remove and roll up
-
Zip tie each external door closed to indicate the rooms have been secured & lock lower travel lock with master key
-
Pack away grey and black water hoses and sprinkler systems - ensure not to cross contaminate with potable water hoses
-
Wind up both front and rear legs ensuring that the handle is secured with a zip tie and is stationed in the low ratio geared position
-
Engage chain between landing leg trailer outer housing if able
-
Ensure outside cabinets are closed and secure
-
Remove timber blocks and store in accessible place for Rig Up, store some blocks in Ute (secure) for transfer
-
Pack up stairs and handrails and ensure they are secure
-
Pack away flood lights and secure flood light arm
-
Undo and pack away TV cables / remove any aerials on roof tops
-
Ensure Fire Extinguishers are seated in their cradle
-
Ensure window shutters are closed and latch is fully engaged
-
Undo and roll up earth cables after disconnection of Power Leads
-
Ensure grey and black water box tank lids are clipped down and secured
-
Ensure rear barn doors are zip tied shut
KITCHEN UNIT
-
Ensure walk in fridge, freezer items are secure, and doors closed and locked with pins
-
Items in Glass door fridges and doors are secure
-
Oil in deep fryer has been drained
-
Water in Bain Marie has been drained
-
Water in dish washer has been drained
-
Drip tray under grill plate has been emptied and cleaned
-
All cupboards and drawers are secure / All items on shelves are secure
-
Pack up / lower TV satellite dish and cables and secure in dining room, Lay down phone aerials
-
Close windows / empty and remove bug zapper tray
-
Shut down Generators and disconnect power lead from Generator and roll up on front of kitchen - 2 Person Job
-
Roll up earth lead and secure
-
Isolate grey and potable water pumps by turning off switch in electrical switch board
-
Turn off main switch in electrical switch board
-
Disconnect and roll up grey water hoses, ensure grey water box lid is clipped down and secured
-
Close and secure outside fridge and freezer compressor doors
-
Pack away chemicals and secure doors, Secure outside sink. Ensure chemicals are in correct bunding.
-
Conduct temperature check on fridges and freezers and log on toolbox sheets
-
Secure ladder inside of kitchen unit, ensure power board doors are secure
-
Ensure potable water got hose is removed and stored correctly
-
Wind up both front and rear legs ensuring that the handle is secured with a zip tie and is stationed in the low ratio geared position
-
Engage chain between landing leg trailer outer housing
-
Pack up kitchen unit platform, stairs and handrails - 3 Person Job and ensure their secured, Extra zip ties needed
-
If winch operated step, follow instructions on the supplied SWI
-
Ensure outside window shutters are closed and ensure latch is engaged fully
GENERATOR/ LAUNDRY UNIT
-
Secure all items and roll down flaps in dry store room
-
Secure and pack bedroom items as per sleepers
-
Lock down and secure washing machine and dryers
-
Ensure all items and cupboard doors are secure in laundry
-
Pack away generators and secure internal doors Do Not store any equipment in or on the floor of Generator cube
-
WHERE FITTED - ensure diesel level site tubes taps are closed and fuel cell breather is closed
-
Pack away loose items - bins, tables, signs etc. DO NOT store in Generator Cube
-
Secure outside doors with zip ties once secure inside rooms
-
Close outside storage doors and ensure they are secure
-
Ensure generator pod and radiator doors are closed and handles are locked once shut down. Use push/pull
-
Ensure generator doors are key locked for added safety
-
Remove and pack away earth stakes and leads are secured
-
Wind up both front and rear legs ensuring that the handle is secured with a zip tie and is stationed in the low ratio geared position
-
Engage chain between landing leg trailer outer housing
-
Pack away generator stairs and handrails and secure - 2 Person
-
Close all shutters and ensure latches are engaged fully
-
Pack and store grey water hoses - Ensure grey water box lid is clipped down and secured
-
Ensure cover is clipped shut on power outlet
-
Aerials are removed from roof top / TV cable packed away, ensure safety wide load flags are in place
GENERATOR UNIT
-
Once power to the camp is no longer required, shut down the generators
-
Depress all E-Stops in Generator Trailer and turn off all battery isolators
-
Close stand pipe ball valve
-
Secure all loose items inside
-
Earth rod disconnected and stored
-
Close and lock door
-
Remove handrails and store in location provided
-
Remove steps and store in location provided
-
Do not raise stabiliser legs until prime mover is under the trailer
STP UNIT (If applicable)
-
Using pull through pump empty all layflat hoses
-
Silo bin stored and bar screen pipe stored
-
Decommission SK25A following manufacturer procedure
-
Turn unit off behind orange electrical box door
-
Roll up electrical cable and store
-
Aeration tanks emptied 50% for transit / camp move (different process for complete decommission of unit)
-
If required empty 15,000L holding tank
-
Tie up decanter for transport
-
Screw on all tank covers
-
Store and strap ladders on platform
-
Store STP handrails and ladder and platform
-
All blackwater and irrigation hoses disconnected, rolled up and stored
-
Close and zip tie skel trailer cages
-
Raise stabiliser legs and landing legs before transport
-
Organise suck truck to pump out balance tank, the other tanks to 50% levels prior to moving (check Quick Guide)
GYM UNIT
-
Secure all gym equipment inside trailer
-
Turn off all electrical equipment
-
Turn off trailer from main power source
-
Roll up and store main electrical lead
-
Roll up and store earth lead
-
Close all windows
-
Close and lock door
-
Store handrails and steps
OUTSIDE AREAS AND PRIOR LEAVING SITE
-
TWO separate inspections of all units to ensure all items are secure - use Push / Pull Test
-
First Inspection Conducted - Name
-
Second Inspection Conducted - Name
-
Once trucks have connected with trailers pack away blocks and chocks
-
Liaise with drivers and truck push to ensure all trailers are ready for transportation
-
Once trailers leave site conduct inspection of site and remove any rubbish and debris, etc.
-
Ensure all associated camp signs on road are collected and stored securely
-
Ensure any items placed in light vehicles for camp moves are adequately covered, secured, and tied down
CAMP SIGNS TO BE PACKED
-
Car Park Signs (2)
-
Smoking Area Sign (1)
-
Emergency Assembly Area "A" Sign (1)
-
Emergency Assembly Area "B" Sign (1)
-
Camp Directional Signs (2)
-
Grey Water/Effluent Irrigation Signs (2)
-
Camp Sign (1)
-
Camp Manager Name
-
Camp Lead Signature
Handover Inspection Checklist - Units
-
Trailer Registration No:
-
Dolly Registration No:
-
Company Name:
-
Driver:
-
Window Shutters closed / pins secure
-
Legs / chains / handles locked in gear/ Zip tied
-
Ropes and pulley system/ Oversize Flags
-
Entry Doors locked / secured
-
Sewage tank Caps / Lids - Taped
-
Potable water Caps / Lids - Taped
-
Grey Water outlets taped
-
Grey Box lids secured with Clips
-
Side toolbox locked / Cages
-
Stairs secured / pins / Clips
-
Handrails / Z bar / pins / black zip tied
-
Electrical leads secured / black zip tied
-
Fire Extinguishers / Hose reel
-
Hoses secured / black zip tied
-
Spotlight Brackets locked
-
Earth Leads secured
-
Walkway Matting / ratchet strap
-
Hot Water System / Pipes
-
Outside Sink locked away - Paper Towel
-
Water Got / Hot Water / Garden hoses
-
Aerials / Cables / Antenna / Awning
-
Fridge / Freezer Compressor doors
-
Rear Electrical Box doors closed
-
Platform / Ext Support Bars / handrail pins
-
Fuel tank door - Container emptied
-
Earth stakes secured / Zip tied
-
Generator doors latched and keyed locked and Radiator Doors closed
-
Total amount of fuel - Litres
-
Has driver got relevant training/inductions
Handover Inspection Sign-Off
-
NHVAS Pre-Start Completion (seperate sheet)
-
Camp Manager:
-
Truck Push:
-
Camp Lead:
RIG - UP
CONSIDERATIONS FOR PLACEMENT OF CAMP
-
Check Pad for any Hazards - identified and remove or flag off any area
-
Position of STP if required to be at lower side of pad (if applicable)
-
Allocation of grey water areas - at least two sides of pad to prevent pooling - downhill from trailers if ground has slope
-
5 metre minimum space around Camp for service trucks to drive around if required
-
Ensure grey water hoses are not extend too long as pumps may not be able to pump distance
-
Sloping of ground - dollies may need to be removed
-
Positioning of Generator trailer - so service vehicles (fuel and water trucks) can pull downside of Camp and not drive around sleeper units
-
Car park location - vehicle movement waking up crews
-
Rubbish bins placement - trucks emptying bins waking up crews
-
Grey water tank placement - downhill and away from sleeper so truck can empty
-
Pad near Main road - traffic will keep people awake
-
Lighting from spotlights for rubbish bins, car park, and delivery areas
-
Parking for dolly if removed from trailers
-
Sunrise and sunset - trailers should face east-west if possible, to avoid sun on sides of trailers
-
Potential fire direction
NMC CAMP RIG – UP CHECKLIST
-
Place out directional Camp signs on turns to new site
-
Walk over site to identify any Hazards and mark if identified. Communicate to others if necessary.
-
Determine position of Camp considering the undulating ground, service deliveries and car park
-
Measure layout and brief truck push and staff on positions for units to be parked
-
Measure between trailers during each trailer laydown (no less than 4.7m, no more than 4.8m) depending on walkway width
-
Ensure 2 timber blocks are placed under heavy ends of trailers and chocks are positioned during trailer laydown
-
Ensure all legs have wooden blocks positioned underneath
-
Ensure that all legs are not over extended, use additional wooden blocks. Use low gear to raise or lower when touching blocks
-
Do not over inflate air bags if fitted as per Quick Guide
-
Do not release truck until position of trailers is level and in correct position
-
Once truck/ trailer has been removed from dolly ensure dolly draw bar leg is vertical and hoses are secured
-
Run out electrical leads and connect - ensure 2nd person check connections are secure
-
Unpack stairs and handrails, Ensure Stairs are seated in position and pins are installed
-
Unpack kitchen platform, stairs and handrails - 3 Person Job
-
Unroll, layout and connect earth leads
-
Unroll, layout and connect Grey Water hoses and sprinklers or flat hoses to STP or Gray Water Tank
-
Connect kitchen grey Water hose to Grey Water Tank and check for any kinks in hose, or flat hoses to STP or Gray Water Tank
-
Where applicable at “nil to ground” sites where more than one grey water tank is deployed, ensure an equal balance of hoses are connected to each tank.
-
Install Generator earth stakes in front of Generator
-
Connect kitchen power to front of Generator
-
Unpack Generator trailer
-
Unlock latch on washing machines
-
WHERE FITTED - ensure diesel fuel cell breather is open
-
Check Generator and open radiator doors prior start up as per Generator Start up guide
-
Switch on kitchen pumps in electrical switchboard
-
Ensure that pump in grey water box on kitchen unit is functional by running water and ensuring float is working
-
Check each room to ensure all electrical items are operating
-
Check bathrooms and toilets are operational
-
Ensure all fire extinguishers are accessible and can be removed freely from cradles
-
Setup and brief crews on muster point positions
-
Setup TV dish and cables
-
Setup spotlights
-
Setup walkways - ensure yellow walkways are at base of stairs - Green stair feet sit on top of yellow walkway, zip tie joins
-
Conduct function test of emergency equipment as per post camp move toolbox
-
Setup Carpark with bollards and signs
-
Setup smoking area
-
Ensure safety cones and bollards are positioned
-
Setup tables, signs, bins, chemical storage area, sinks and boot cleaner.
-
Unroll, sanitise and connect link balance hoses and manifold system
-
Replace air hose covers or tape
-
Inspect Camp for Hazards and report - fix any hazards if possible
-
Inspect Camp for any maintenance issues and report
-
Continue to setup Camp and adjust stairs etc.
-
Setup STP and discharge area (if applicable
RIG – UP SIGN OFF
-
Camp Name/Number:
-
Camp Manager Signature:
-
Camp Lead Signature:
POST-CAMP MOVE TOOLBOX
POST-CAMP MOVE TOOLBOX
-
Camp Number:
-
Todays Date:
-
PRESENT AT TOOLBOX: Truck Drivers etc. must be present for toolbox. Trailer positions to be followed closely and governed by appropriate drawings supplied in this document. ote: Any personnel involved in the activity must read, understand, and sign the toolbox.
Sign Off (all involved)
-
Name/Signature
-
HSE Discussion Points
-
Inspections to be Conducted (including Weed & Seed Certificates)
-
FOOD SAFETY & Hygiene Discussed
Fridge/Freezer Temp
-
Freezer Time
-
Freezer Temperature
-
Fridge Time
-
Fridge Temperature
Emergency Systems Function Test & Equipment Check
-
Smoke Alarms – each trailer
-
Fire Alarms
-
Emergency Cut Out Buttons
-
Fire Extinguishers
-
Generator ESD
-
Hand Siren
-
Personnel in Training
-
Other Discussion Points
-
Camp Manager Sign-Off