Title Page
-
Date
-
Location / Project Name
-
NMC / Contractor
-
Conducted by
-
This checklist is designed to be used to provide an indication of the Team/Contractor’s implementation and adherence to hazard controls associated with the project or job
-
This checklist is not intended to be exhaustive therefore the Site Supervisor (or their delegate) should make relevant comments about any issues identified that are not covered within
-
Any non-conformity should be discussed with the team leader and rectified immediately if possible
Site Control/Supervision
-
Have inductions been completed - Site specific for a project and Contractor online inductions
-
-
Is there a nominated person in charge of the site?
-
Comment
-
Is there evidence of a daily Prestart / Toolbox Talk being conducted?
-
Comment
-
Is adequate supervision provided? (Employees, Contractors, Trainees, Labour Hire, Visitors)
-
Comment
-
Do all persons on site have a Construction White Card?
-
Comment
Site set-up
-
Is worksite clearly delineated and signposted to identify work-site?
-
Are barriers adequate for site hazards?
-
Are pedestrians directed safely around or through site?
-
Are items adequately secured in event of wind or vandalism?
Traffic Management
-
Is work within the road reserve?
-
Is a Traffic Management Plan being followed?
-
Are Traffic Controllers qualified (sight evidence)
Pre-Works Preparation
-
Any underground or overhead services within the work area?
-
Has Dial-Before-You-Dig been performed?
-
Comment
-
Have services been located and marked? i.e. Have low overhead powerlines been marked at ground level with bollards, tape or signs?
-
Comment
-
Is a hot work permit in use if required?
-
Comment
-
Is a confined space permit in use if required?
-
Comment
Hazard Identification & Controls
-
Is a SWMS in use?
-
Comment
-
Have all team members/contractors present reviewed and signed SWMS?
-
Comment
-
Has the JSEA or SWMS identified all of the hazards?
-
Comment
-
Are the safety controls detailed in the SWMS in use?
-
Comment
-
Are all fall hazards adequately controlled?
-
Comment
-
Is a Safety Management Plan in use if required? (Works over 250K)
-
Comment
-
Asbestos register reviewed for presence of asbestos in buildings?
-
Comment
Electrical Hazards
-
Have electrical hazards been identified and controlled?
-
Comment
-
Are all electrical tools tested and tagged?
-
Comment
-
Is there RCD protection on the generator?
-
Comment
-
Are instruments/tools calibrated or in test date if required?
-
Comment
Personal Protective Equipment
-
Is appropriate PPE being used?
-
Comment
-
Is PPE maintained and stored correctly?
-
Comment
Plant & Equipment
-
Is any plant or equipment in use that requires the user to have a current licence or competency?
-
Do all plant operators hold appropriate licences or competency?
-
Comment
-
Have Pre-Start Checks been conducted on plant?
-
Comment
-
Have all faults discovered been rectified or reported?
-
Comment
-
Has hired equipment been checked and is serviceable?
-
Comment
-
Are seat belts worn where required (If ROPS fitted)
-
Comment
-
Is plant being used in correct manner for the purpose intended?
-
Comment
-
Is lifting equipment appropriate tested?), safe and being used correctly?
-
Comment
-
Are manual handling mechanical aids used where possible?
-
Comment
Excavations
-
Are excavations benched, battered or shored if deeper than 1.5M
-
Comment
-
Are excavations appropriately barricaded to protect pedestrians and traffic?
-
Comment
General Housekeeping
-
Is area free of rubbish and trip hazards?
-
Comment
-
Are items secured in case of wind?
-
Comment
Hazardous Substances
-
Are SDS available for the Hazardous Substances used on site?
-
Comment
-
Are substances being used safely as per SDS?
-
Comment
Emergency
-
Is a team member first-aid trained?
-
Comment
-
Is there a suitable first aid kit on site?
-
Comment
-
Is there a fire extinguisher available?
-
Comment
-
Is there a suitable means of communication?
-
Comment
-
Is there transport to medical help available?
-
Comment
-
Is there an Emergency Plan for the site?
-
Comment
Facilities
-
Are there suitable toilet and Hand washing facilities?
-
Comment
-
Are there suitable sheltered eating/rest areas?
-
Comment
-
Is there adequate clean drinking water available?
-
Comment
Sun Safety
-
Are all persons adhering to NMC Sun-safe Policy?
-
Comment
Smoking
-
Is smoking controlled to minimise impact on other workers or public?
-
Comment
Environment
-
Are sediment/erosion control measures in place?
-
Comment
-
Are controls in place to prevent physical damage to surrounding environment?
-
Comment
-
Are dust/airborne debris controls in place if applicable?
-
Comment
-
Is contaminated run-off prevented from entering drains?
-
Comment
-
Are there spill controls available? (dust, socks, absorbent pads)
-
Comment
Job Completion
-
Is site tidy with no trip hazards remaining?
-
Comment
-
Are all spills cleaned up?
-
Comment
Acknowledgment
-
The observations recorded in this audit have been discussed with me
-
Comment
-
Contractor or NMC Site Representative:
-
Position/Role:
-
Contact Number: