Information

  • Division

  • Community

  • Address or Homesite

  • Street Photo of Homesite

  • Installation Contractor

  • Conducted on

  • Prepared By

PV Solar Array

  • PV Array assembled true, square and centered within the well in a craftsman like manner?

  • All roof mounted equipment is ready for Final Solar Inspection?

  • Rate Roof Mounted Installation

  • Installation Notes:

  • Add media

PV Trim and Labeling Installation

  • Cat 5 and receptacle trim complete at garage

  • Envoy mounted approximately 6' from the floor?

  • A/C Disconnect and Meter Socket (where applicable) installed at proper location and hight?

  • Proper connectors installed at A/C Disconnect and Meter Socket (where applicable) per all governing codes in a craftsman like manner?

  • A/C Disconnect and Meter Socket (where applicable) bonded properly per all governing codes in a craftsman like manner?

  • All labeling to satisfy plans, utilities, and any governing codes installed with appropriate bonding material, with none showing outside labels, in a craftsman like manner?

  • Proper circuit breakers installed at main and sub-panel (where applicable) per the plans?

  • A/C Disconnect left in the off position and locked out?

  • All debris removed from homesite and disposed of in proper receptacle?

  • Homesite Ready for Final Solar Inspection?

  • Rate PV Trim and Label Installation

  • Installation Notes:

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.