Information
-
NRG Operating Services Automatic Fire Sprinkler Systems (Wet Pipe Systems) Monthly Service
-
NRG Work Order Number
-
Header Number
-
Conducted on
-
Prepared by
Mark Whitmore (Xport Plumbing) Licence # 14460
Jeff Clifton - NRG Technician -
Location NRG Operating Site
Previous Inspection
-
Has the last inspection been reviewed?
-
All previous defects and non conformances attended to and recorded?
Action Required By Table 2.4.2.1
-
1.1 - Check control valve assembly is unobstructed
-
-
If 1.1 is a FAIL - Response Required
-
1.2 - Check Spare Sprinkler and spanner are available
-
Spare sprinkler and spanner located on site at fire systems workshop.
-
1.3 - Check signage for damage, legibility and location
-
If 1.3 is a FAIL - Response Required
-
1.4 - Check fire brigade booster connection is operational.
-
If 1.4 is a FAIL - Response Required
-
1.5 - Check main stop valves and alarm cocks are open, secured and labelled.
-
If 1.5 is a FAIL - Response Required
-
Number of valves Checked
-
1.6 - Check pump starting devices are open and secured.
-
Number of valves Checked
-
If 1.6 is a FAIL - Response Required
-
1.7 - Check pressure switches.
-
If 1.7 is a FAIL - Response Required
-
1.8 - Check alarm signalling equipment (ASE).
-
1.9 - Check sprinkler system interface status.
-
1.10a - Verify water supply stop valves are open and secured.
-
Number of valves Checked
-
If 1.10a is a FAIL - Response Required
-
1.10b - Verify water supply stop valve position indicators.
-
Number of valves Checked
-
If 1.10b is a FAIL - Response Required
-
1.10c - Verify each valve monitor indicators at CIE
-
Number of valves Checked
-
If 1.10c is a FAIL - Response Required
-
1.11 - Record and verify system pressure gauge readings before alarm function test.
-
Installation pressure before test (KPA)
-
Below Stop valve (KPA)
-
If 1.11 is a FAIL - Response Required
-
1.12 - Conduct alarm function test and verify time of operation of gongs.
-
1.12 - Time to operation of alarm gong ( seconds)
-
If 1.12 is a FAIL - Response Required
-
1.13 - Verify Alarm signal operation.
-
Number Checked
-
If 1.13 is a FAIL - Response Required
-
1.14 - Check operation of strobe indicators.
-
1.15 - Record and verify system pressure gauge readings after alarm function test.
-
Installation pressure before test (KPA)
-
Below Stop valve (KPA)
-
If 1.15 is a FAIL - Response Required
-
1.16 & 1.17 - Test automatic and manual pump starting devices in accordance with item 1.13 & 1.17 of table 3.4.1. Record results in pump set log book.
-
Refer to Monthly Service Schedule Fire Pump Sets Records and Test Results.
-
1.18 - Perform routine service on water supply tanks in accordance with 5.4.1
-
Refer to Monthly Service Schedule Water Storage Tanks Records and Test Results.
-
1.19 - Check foam concentrate levels.
-
If 1.19 is a FAIL - Response Required
Signatures
-
Technician - Jeff Clifton
-
Licensee - Mark Whitmore
-
NRG Representative