Title Page
-
Document No.
-
Conducted on
-
Area
-
Prepared by
Drywall
-
Rated walls are properly labeled
-
All penetrations are sealed
-
Fire caulking installed
Fire Sprinkler
-
Piping is properly supported
-
Sprinkler piping not supported any wires, conduits, cabling, etc.
-
Drains installed where required
Plumbing / HVAC Piping
-
Piping is properly labeled
-
Valve tags are installed
-
Pipe insulation correct and complete
-
Insulation shields installed
-
Graded piping properly sloped
-
Piping properly supported
-
Seal pipes through floors and walls
-
Valves are operable and accessible
-
Med gas piping isolated from other materials
-
Framing for access doors
-
Roof drain bodies are properly insulated
-
High point vents and low point drains installed
-
Drain pans installed and piped where required
-
All piping tested and inspected
HVAC
-
Service clearance for equipment
-
Fire and fire / smoke damper access doors installed and labeled
-
Wall angles installed around dampers
-
Insulation properly terminated at fire and fire / smoke dampers
-
Breakaway connection at damper correct
-
Duct insulation correct and complete
-
Duct is properly supported
-
Damper quadrants installed and marked
-
Equipment identification installed
-
All systems tested and inspected
Electrical
-
Equipment and boxes properly labeled
-
Box knockout seals installed
-
Covers installed on boxes
-
Conduit bushings installed
-
Conduit, boxes, and fixtures installed and supported
-
Ground wire installed in boxes
-
Boxes are accessible
Low Voltage
-
Wiring is properly supported
-
Wiring is not touching sprinkler piping
-
Wiring has been properly terminated
-
Photos
-
Add media
Signoff
-
NRMC Engineering Department
-
Painter
-
Life Safety for Sprinkler Piping
-
HVAC for Piping
-
Electrician
-
Phone/Data
Failed Items / Action Plan
-
Painter
-
Life Safety
-
HVAC
-
Electrician
-
Phone/Data