Title Page
Before starting any new document ensure to refer to previous visit / interactions to identify any areas of focus. Any progress should be recognised and praised.
-
Coach Name.
-
Engineer details.(Name and Tech No.)
-
Conducted on.
-
Telephone conversation with Engineer?
-
A brief description of conversation and the resolution.
-
Site Visit?
On site
-
Confirm Engineer has correctly identified hazards.
-
Confirm Engineer has correctly completed On Site Risk Assessment.
-
Do you have the Engineer's risk Assessment for the job?
-
Is the Risk Assessment an accurate representation of work carried out?
- Yes
- No
-
Was the Conversation with the Customer observed?
-
Any observations / Comments about Customer Conversation? What was mentioned? Was customer made aware of what Engineer was there to do? Customer aware of Eyebolt?
-
Confirm use of PPE.
-
Confirm correct Manual Handling procedure.
-
Confirm Engineer understands Ladder Hierarchy.
-
Which Ladders were used?
- Combi Ladder / A frame
- Single Section
- Double Section
- Triple Section
- CAT Ladders
-
Add photos of Ladder set up. Show evidence of H&S
Dish work and Cabling
-
Engineer displays proficiency in Dish working.
-
Which part of Dish working needs attention
- Dish location choice
- LOS assessment
- Dish alignment
-
Any observations or suggestions around Dish work?
-
Data Logger completed?
-
Is existing cabling being used?
-
Is the new Cabling neat?
-
Any observations or comments on Cabling.
-
Was the Cable Entry hole sealed?
Installation of Sky boxes
-
Confirm Data logger completed for SAT feeds.
-
Correct F connectors?
-
Correct power lead used?
-
Correct HDMI lead used?
-
Is the Remote Control paired to the TV?
-
Is the TV picture resolution optimised?
-
Is Q box on the correct software? Use iKnow2 Model Look Up Tool)
-
Add photo to show Software Version
-
Confirm use of Chrome app.
-
Add photo of Chrome app mesh
-
Showcase observed?
-
Has the Engineer left the property tidy?
Sign off
-
Coach on site general comments / feedback / areas of focus needed.
-
Engineer comments. What will you take away from this visit?
-
Follow up. ( if required)
-
Comments / observations about Showcase
-
Coach Name
-
Engineer Name