Information
-
Inspection Type
- 12 Months Defects inspection
- Re-inspection 12 Months Defects
- Health & Safety Inspection
- Interim Inspection During Construction
- Post Inspection of Work
- Re-inspection
- Site Visit
-
Inspection Reference
-
Campus
- City
- Clifton
- Brackenhurst
-
Building
- NTU Ceremonial Hall
- 50 Shakespeare Street
- Barnes Wallis
- Belgrave Centre
- Bonington
- Boots Library
- Chaucer
- City Gate East
- Colwick Building Constellations
- Antenna
- Former REC
- Confetti HE Centre
- Confetti FE Centre
- 9-11 Beck Street
- Pub @ Confetti site
- The Washroom
- Flats above the Washroom
- The Washroom Cellar
- Dakeyne Street
- DICE
- Dryden Centre
- Game City
- Gauntley Court
- Goldsmith Music Centre
- Health Centre
- Hillcrest
- Hollymount House
- Maudslay
- Newton Arkwright
- Newton Building
- Arkwright Building
- Newton Link Building
- Occupational Health Centre
- Byron Students Union
- Taylor Building
- Terrace Royal
- Trent House
- Waverley
- Ada Byron King
- Anthony Nolan
- Benenson
- Catalysis
- CELS
- Clifton Bookshop
- Clifton Central Plantroom
- Clifton Cricket Pavilion
- Clifton External Node Room
- Clifton Library
- Clifton Teaching Building
- Crime Scene House
- DHL
- Erasmus Darwin
- Biomedical Centre
- iSMART House 9
- John Clare Lecture Theatre
- JVGCRC
- Lee Westwood Sports Centre
- Lionel Robbins
- Clifton Maintenance
- Mary Ann Evans
- New Hall Block
- Pavilion
- Refectory
- Rosalind Franklin
- Clifton Student Services Centre
- The Clubhouse
- The Gatehouse
- Trent Astronomical Observatory
- College Drive House 1
- College Drive House 2
- ISTEC
- MTIF
- College Drive House 3
- College Drive House 4
- College Drive House 5
- College Drive House 6
- College Drive House 7
- College Drive House 8
- Brackenhurst Cricket Pavilion
- Brackenhurst Library
- Brackenhurst Main Hall
- Brackenhurst Old Library
- Bramley
- Medlar
- Pippin Cottage
- Sewage Pump House
- Southhill Garage
- The Floristry
- Victorian Walled Garden
- Brackenhurst Biomass Boiler
- Brackenhurst External Node Room by Vet Centre
- Brackenhurst External Node Room by the Biomass Boiler
- Park Hill Stables
- Landscape Glasshouse
- Horticultural Polytunnels
- Horticultural Glasshouse
- Home Farm Workshops & Hortic Store
- Home Farm Dairy
- Home Farm Cow Shed 1
- Home Farm Dairy Cow Shed 2
- Home Farm Dairy Roundhouse
- Home Farm Dairy Calf House
- Animal Unit Classroom
- Animal Unit Donkey Handling
- Animal Unit
- Animal Unit Kennels and Loose Boxes
- Veterinary Nursing Centre
- Bird Hide
- Brackenhurst farm House
- Equestrian Centre Combi Barn 1
- Equestrian Centre Combi Barn 2
- Equestrian Centre Farrier Workshop
- Equestrian Centre Locker Room
- Equestrian Centre Loddon Yard
- Equestrian Centre Mary Ann King Arena
- Equestrian Centre Office and Classroom
- Equestrian Centre Tack Room
- Equestrian Centre Varley Yard
- Equestrian Centre Varley Haybarn
- Durdham Farm Brick Stables
- Durdham Farm Dutch Barn
- Durdham Farm House
- Ash Accommodation
- Beech Accommodation
- Cherry Accommodation
- Elm Accommodation
- Fir Accommodation
- Maple Accommodation
- Oak Accommodation
- Limes and Sycamore Accommodation
- Willows Accommodation
- Home Farm Cottage 1
- Home Farm Cottage 2
- Home Farm Cottage 3
- Home Farm Cottage 4
- Home Farm House
- Park Cottage
- Southill House
- The Lodge
- External Area City
- External Area Clifton
- External Area Brackenhurst
- Clifton Tennis Courts
- Clifton Hockey Pitch
- Clifton Multi Use Pitch
-
Principal Contractor
- Allan Dyson
- Constellation
- Dean and Sons
- Dorma
- GFT
- Heronridge
- Kier
- Mellor Bromley
- Morris Vermaport
- NTU Development
- NTU Maintenance
- Rilmac
- Premier
- PFS
- Thomas and Sons
- Specialist Contractor
- High Manor
-
Project/Contract Manager
-
Prepared by
- Steven Buil, NTU QMT, 07880 173753, steven.buil@ntu.ac.uk
-
Select date
Inspection Detail
-
Inspection Detail
Item number/reference
-
Floor Level
- External
- Sub Basement
- Basement
- Ground
- First
- Second
- Third
- Fourth
- Fifth
- Sixth
- Seventh
- Eighth
- Ninth
- Tenth
- Lower Ground Floor
- Upper Ground Floor
- Mezzanine
- -02
- -01
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Roof
- External
- Front Elevation
- Rear Elevation
- LHS Elevation (Facing Front)
- RHS Elevation (Facing Rear)
- Car Park
- External Area
-
Room number/area
-
Trade
- Architect
- Automated Door Contractor
- Bespoke Workmanship
- Blind Installer
- BMS Contractor
- Bricklayer
- Catering Contractor
- Cleaning
- Decorator
- Designer
- Electrician
- Flooring Contractor
- Fire Stopping Contractor
- Fire Systems Contractor
- Fume Cupboard Contractor
- Furniture Supplier
- Glazing Contractor
- Ground worker
- Health and Safety
- Joinery
- IPS Contractor
- IS/AV
- Kitchen Installer
- Labourer
- Landscaping
- Lift Contractor
- Mechanical
- Plastering
- Plumber
- Principal Contractor
- Roofing Contractor
- Tiler
- Security Contractor
- Signage Contractor
- Specialist Lab Contractor
- Specialist Contractor
- Structural Engineer
-
Component
- Access Panel
- Acoustic Ceiling
- Acoustic Panel
- Air Conditioning
- Air Handling Unit
- Architrave
- Attenuation Tank
- Backfill
- Blockwork
- Brickwork
- Brick Slip
- Boxing
- Cable/s
- Ceiling
- Ceiling Grid
- Ceiling Plaster
- Ceiling Tile
- Ceiling Void
- Cleaners Sink
- Concrete
- Conduit
- Control Panel
- Countertop
- Distribution Board
- Door
- Doorframe
- Door Furniture
- Door Handle
- Door Hinges
- Door Lock
- Door Stop
- Drainage
- Ductwork
- Fascia
- Finishes
- Fire Compartment
- Fire Fighting Equipment
- Fire Stopping
- Fittings
- Floor
- Floor Covering
- Fume Cupboard
- Furniture
- Glazing
- Grab rail
- Ground
- Guttering
- Handrail
- Hard Landscaping
- Health and Safety
- Heat Emitter
- Infill
- IPS Panel
- Isolation Valve/Control
- Insulation
- Interstitial Glazing System
- Item
- Kicking Plate
- Lift
- Lift Car
- Lift Shaft
- Luminaire
- Made Ground
- Manifestation
- Mastic
- Metsec
- MF Ceiling
- Pipework
- Pipe Insulation
- Planting
- Plaster Finish
- Plaster Reveal
- Pointing
- Radiant Panel
- Radiator
- Rain Screen Cladding
- Rain Water Goods
- Ramp
- Reception Desk
- Refuge Point
- Riser
- Roof Covering
- Render
- Service Duct
- Silicone Sealant
- Signage
- Sink
- SIPS
- Skirting Board
- Soffit
- Soft Landscaping
- Stairwell
- Stair Nosing
- Steelwork
- Street Furniture
- Switch/Control
- Switch Plate
- Tarmac
- Tarmacadam Overbanding
- Tiling
- Toilet
- Trench
- Trench Heating
- Under Counter Water Heater
- Urinal
- Ventilation Grille
- Verge
- Wall
- Wall Cavity
- Wall Plaster
- Wash Hand Basin
- Waste Pipework
- WC Pan
- Window
- Window Blind
- Window Film
- Window Furniture
- Work Surface
-
Detail
- Broken
- Ceiling tile damaged/finger marked
- Cracked
- Damaged
- Dangerous
- Does not comply with building regulations
- Feels rough to the touch, indicating a lack of preparation prior to the final coat being applied
- Final clean required
- Fingermarked
- Further attention to detail required
- Has not been applied correctly
- Health and safety concern
- Incomplete decoration
- Incorrectly fitted
- Incorrect
- Insulation incomplete/damaged/missing
- Installation does not comply with manufacturers installation requirements
- Leaking
- Making good required
- Make good around pipework
- Make good to all penetrations
- Mandatory signage required
- Misaligned
- Missing
- Neat bead of silicone sealant/mastic required
- Not level
- Not sitting plumb
- Paintwork is grinning
- Remove excess decoration
- Remove excess materials
- Requires commissioning
- Requires labelling
- Runs
- Signage required
- Scratched
- Stained
- Uneven finish
- Water damaged
- Works in progress
- Work incomplete
- Work is not of a satisfactory standard
-
Further Comments
-
Photograph