Information
-
Mold Number
-
Tryout Date
-
Program
-
Part Description
-
NYX Personnel
-
Tryout (T#, Homeline, etc.)
- T0
- T1
- T1 - Homeline
- T2
- T3
- Texture Validation
- Correction Validation
- DOE
Tooling
-
Mold ID Plaque - Operator Side of Mold?
-
Sequence of Operation Plaque - Operator Side of Mold?
-
Warning Plaque(s) - Operator Side of Mold?
-
Hot Runner Plaques are Present - Operator Side of Mold?
-
Water Line Diagrams Stationary & Moving Half - Operator Side of Mold?
-
Hydraulic Connections conform to NYX Standards?
-
Hydraulic actions are hydraulically interlocked? - SUN Products Part# CKCBXCN-ECJ
-
Hydraulic Ejection - Check Valve Installed for 720 Ton and Higher?
-
Top of Mold Identified, Single Point Lift Ring Present?
-
Are Clamp Slots on the Operator and Non-Operator side of the mold?
-
Is the Clamp Plate Thickness Correct for Planned Machine Size?
-
Quick Mold Change Slots are Present on the Cavity Half Clamp Plate?
-
Oversized Guard Plates for Water and Hydraulic Fittings are Adequate?
-
Eyebolt holes on the back of the cavity and core clamp plates for handling are present?
-
If over 150 tons, is there 2 Eyebolt holes on each rail?
-
Is the Shot Counter / CVe Monitor installed on the Operator Side parting line?,
-
Are the Safety Straps on both the Operator and Non-Operator side of the mold?
-
Knockout Pucks are Flush to the Backplate?
-
Do the threads for ejection comply with the NYX Mold build Standard?
-
Is the ejector box covered on the top / sides of the mold?
-
Does mechanical ejection have return springs or gas struts?
-
Are the water channels labeled? (IN 1, OUT 1, etc.)
-
Are there red hoses on the outlet lines and blue hoses on the inlet lines?
-
Water Manifolds Color Matched to Inlet and Outlet?
-
Water Manifold is Installed in Correct Location?
-
Insulator Plate for Hot Runner & Engineering Resins?
-
Limit Switches Installed with correct plugs and functional?
-
Die / Lifter Sensors for Technical/Geometric Grains are installed?
-
Power & TC Plugs correct, Manifold Functions Correctly?
-
Valve Gates Function Correctly?
-
Locating Ring is Correct Diameter?
-
Is the sprue bushing recess less than 3.0" in depth?
-
Is the Sprue Bushing Nozzle Seat 3/4" radius?
-
Runner Shut Offs are present on Multi-Cavity Molds?
-
Is the runner identified with material code and cavity ID?
-
Required Shark Fin(s) are installed?
-
Does the runner system and gating comply with the NYX Mold Build Standard?
-
Are Parting Line Vents cut in every 1.50" on center around the periphery of the cavity(s)?
-
Is there a clearance hole where required?
-
Is there provisions to remove Pocerax Inserts for ease of cleaning?
-
Are features deeper than 0.25" inserted and vented?
-
Do A Surface ribs have vents?
-
Is the parting line relieved 0.030" - 0.050"?
Process & Mold Performance
-
T1 Moldflow Validation Completed?
-
T1 Protocol for Molding Process Complete?
-
TIS 3.1 Complete?
-
Cavity Balance is Acceptable?
-
Parting Line is Closed & Free of Flash and/or Mismatch?
-
Runners and Gate Inserts are Free of Flash and /or Mismatch?
-
Slide Seal Off Areas are Free of Flash and/or Mismatch
-
Lifter Seal Off's and Shut Off's are Free of Flash and/or Mismatch?
-
Parting Line Match on Class 'A' Surface Free of Flash and/or Mismatch?
-
Class 'A' Surface free of Sink Marks?
-
Class 'A' Surface free of high gloss areas or gloss variation?
-
Class 'A' Surface free of Read through of B Side Features?
-
Class 'A' Surface free of Stress Marks?
-
Class 'A' Surface free of Splay?
-
Wall thickness verified to data?
-
Knitline locations been approved or as per Moldflow?
-
A' Surface acceptable? ( No Hard Lines, Blended Radii, etc. )
-
All B Surface Features are Present, Filled & Release from Mold?
-
Is Cavity Number, Mold Number, Part Number Engraved correctly in Mold Cavities?
-
Are the ejector pins free of plastic? ( flash )
-
Are the ejector pins flush with the core surface?
-
Are the vents open?
-
Does the ejector system move freely? ( no binding, galling, etc. )
-
Is there sufficient ejector stroke for the part to clear the core side?
-
Are there a sufficient number of ejector pins to demold the part?
-
Do the slides move freely? ( no binding, galling, etc. )
-
Is the slide travel sufficient to clear the part?
-
Do the lifters move freely? ( no binding, galling, etc. )
-
Is the mold free of any hydraulic or water leaks?
-
Is the lifter travel sufficient to clear the part?
-
Parts, Runners & Gates can be Demolded with EOAT?
-
Do the gates trim cleanly without vestige?
-
Approval
-
undefined
- Approved to Ship: All known issues affecting Mold Quality, Construction, Function as well as Part Quality are Closed.
- Approved to Ship: Issues have been identified affecting Mold Quality, Construction, Function and/or Part Quality remain Open
- Not Approved: Known Issues must be Resolved prior to Mold Shipment
- Issues have been reviewed with Mold Source