Information

  • Mold Number

  • Tryout Date

  • Program

  • Part Description

  • NYX Personnel

  • Tryout (T#, Homeline, etc.)

Tooling

  • Mold ID Plaque - Operator Side of Mold?

  • Sequence of Operation Plaque - Operator Side of Mold?

  • Warning Plaque(s) - Operator Side of Mold?

  • Hot Runner Plaques are Present - Operator Side of Mold?

  • Water Line Diagrams Stationary & Moving Half - Operator Side of Mold?

  • Hydraulic Connections conform to NYX Standards?

  • Hydraulic actions are hydraulically interlocked? - SUN Products Part# CKCBXCN-ECJ

  • Hydraulic Ejection - Check Valve Installed for 720 Ton and Higher?

  • Top of Mold Identified, Single Point Lift Ring Present?

  • Are Clamp Slots on the Operator and Non-Operator side of the mold?

  • Is the Clamp Plate Thickness Correct for Planned Machine Size?

  • Quick Mold Change Slots are Present on the Cavity Half Clamp Plate?

  • Oversized Guard Plates for Water and Hydraulic Fittings are Adequate?

  • Eyebolt holes on the back of the cavity and core clamp plates for handling are present?

  • If over 150 tons, is there 2 Eyebolt holes on each rail?

  • Is the Shot Counter / CVe Monitor installed on the Operator Side parting line?,

  • Are the Safety Straps on both the Operator and Non-Operator side of the mold?

  • Knockout Pucks are Flush to the Backplate?

  • Do the threads for ejection comply with the NYX Mold build Standard?

  • Is the ejector box covered on the top / sides of the mold?

  • Does mechanical ejection have return springs or gas struts?

  • Are the water channels labeled? (IN 1, OUT 1, etc.)

  • Are there red hoses on the outlet lines and blue hoses on the inlet lines?

  • Water Manifolds Color Matched to Inlet and Outlet?

  • Water Manifold is Installed in Correct Location?

  • Insulator Plate for Hot Runner & Engineering Resins?

  • Limit Switches Installed with correct plugs and functional?

  • Die / Lifter Sensors for Technical/Geometric Grains are installed?

  • Power & TC Plugs correct, Manifold Functions Correctly?

  • Valve Gates Function Correctly?

  • Locating Ring is Correct Diameter?

  • Is the sprue bushing recess less than 3.0" in depth?

  • Is the Sprue Bushing Nozzle Seat 3/4" radius?

  • Runner Shut Offs are present on Multi-Cavity Molds?

  • Is the runner identified with material code and cavity ID?

  • Required Shark Fin(s) are installed?

  • Does the runner system and gating comply with the NYX Mold Build Standard?

  • Are Parting Line Vents cut in every 1.50" on center around the periphery of the cavity(s)?

  • Is there a clearance hole where required?

  • Is there provisions to remove Pocerax Inserts for ease of cleaning?

  • Are features deeper than 0.25" inserted and vented?

  • Do A Surface ribs have vents?

  • Is the parting line relieved 0.030" - 0.050"?

Process & Mold Performance

  • T1 Moldflow Validation Completed?

  • T1 Protocol for Molding Process Complete?

  • TIS 3.1 Complete?

  • Cavity Balance is Acceptable?

  • Parting Line is Closed & Free of Flash and/or Mismatch?

  • Runners and Gate Inserts are Free of Flash and /or Mismatch?

  • Slide Seal Off Areas are Free of Flash and/or Mismatch

  • Lifter Seal Off's and Shut Off's are Free of Flash and/or Mismatch?

  • Parting Line Match on Class 'A' Surface Free of Flash and/or Mismatch?

  • Class 'A' Surface free of Sink Marks?

  • Class 'A' Surface free of high gloss areas or gloss variation?

  • Class 'A' Surface free of Read through of B Side Features?

  • Class 'A' Surface free of Stress Marks?

  • Class 'A' Surface free of Splay?

  • Wall thickness verified to data?

  • Knitline locations been approved or as per Moldflow?

  • A' Surface acceptable? ( No Hard Lines, Blended Radii, etc. )

  • All B Surface Features are Present, Filled & Release from Mold?

  • Is Cavity Number, Mold Number, Part Number Engraved correctly in Mold Cavities?

  • Are the ejector pins free of plastic? ( flash )

  • Are the ejector pins flush with the core surface?

  • Are the vents open?

  • Does the ejector system move freely? ( no binding, galling, etc. )

  • Is there sufficient ejector stroke for the part to clear the core side?

  • Are there a sufficient number of ejector pins to demold the part?

  • Do the slides move freely? ( no binding, galling, etc. )

  • Is the slide travel sufficient to clear the part?

  • Do the lifters move freely? ( no binding, galling, etc. )

  • Is the mold free of any hydraulic or water leaks?

  • Is the lifter travel sufficient to clear the part?

  • Parts, Runners & Gates can be Demolded with EOAT?

  • Do the gates trim cleanly without vestige?

Approval

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.