Information

  • Client / Site

  • Document No.

  • Project Number and Name:

  • Score:

  • Principal Contractor:

  • Conducted on:

  • Prepared by:

  • Project Manager:

  • Site Manager:

  • Location:

Site Security

  • Is this site and the working area secure from unauthorised personnel?

  • Are arrangements in place for operatives to sign in and out?

Documentation

  • OAG Ltd site managers must ensure that site documentation and registers are up to date and relevant for the works being undertaken..

  • Are blank OAG site inductions and 10 point test sheets available and sufficient for all personnel when on site?

  • Have method statements been prepared, relevant to the works being undertaken and available on site?

  • Are all relevant risk assessments completed and available?

  • Are blank Daily Activity Briefing (DAB) forms available?

  • Are blank plant register & plant inspection forms available to be completed?

  • Have the correct permits to work been applied for and available?

  • Does the site file contain sufficient blank forms?

  • Does the project/site manager have access to the on-line incident reporting system?

Quality

  • This should include any project specific requirements for Quality Plans, ITP's etc.

  • Are drawings available, complete and approved with all relevant information to allow works to start?

  • Has the quality plan been completed?

  • If required has a Inspection and test Plan been prepared?

Working at Height

  • Has the most appropriate access equipment been identified for the tasks being undertaken?

  • Ladders and steps should only be used for short duration (less than 30mins), low risk activities or areas where it is not possible to use a working platform. Ensure podiums, ladders and steps comply with BSEN 131 and are not domestic grade.

Materials and Storage

  • Are arrangements in place for safe loading and unloading of vehicles?

  • Has a designated storage area and cutting area been agreed?

Welfare & First Aid

  • Are the welfare facilities known and identified?

  • Is there a supply of drinking water and hot (or warm) and cold water available on site?

  • This must include a supply of warm water in in or near the toilets for hand washing and a means of boiling water.

  • Is there an available place for operatives to rest, eat and drink?

  • Are there facilities available for drying clothing and getting changed if applicable?

  • Are there sufficient, suitable first aid facilities available?

  • Are the nominated first aiders identified/identifiable?

Housekeeping and Traffic Routes?

  • Is the appropriate signage on access and evacuations routes known?

  • Is there a clear route for both operatives and materials?

Plant and Equipment

  • Have hand tools been identified and requirements for storage and use identified?

  • Have power tools been identified and requirements for storage, maintenance and used been identified?

  • Is there an appropriate lifting plan available for all lifting activities?

  • Major lifts should be under contract lift only. Where an installation requires the use of specialist lifting equipment or cranage it must be subject to a lifting plan and method statement which must be prepared and check by an appointed person. Lifts should only be carried out by appropriately trained AP's, lift supervisors and slinger signallers.

PPE

  • Has appropriate PPE been issued and referred to in the risk assessments and method statements?

Fire

  • Is fire fighting equipment available and sufficient?

  • Are hot works to be carried out? If yes is it included in the method statements and permits accounted for?

  • Are emergency procedures known and signage available?

  • Are no smoking procedures established and known?

  • Are emergency exit routes safe, un-obstructed and known?

  • Walk route prior to commencing works to verify routes

Environmental

  • Is suitable and sufficient lighting available?

  • Have suitable sustainable arrangements been agreed for the disposal of waste on site?

Hazardous Substances

  • Are appropriate CoSHH assessment available for all substances being brought to site?

  • Is their adequate asbestos information available and has it been removed from the OAG scope of works prior to starting?

Signage and Notices

  • Is there sufficient directional signage which is clearly signed to enable a safe exit from site?

  • Is all site signage visible and clearly displayed?

Health Surveillance

  • Are blank forms available to correctly document health issues at the induction stage?

Closeout

Closeout

  • Additional information/auditors comments:

  • Site Manager:

  • Auditor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.