Activity : Mowing (hand)
Unit: Acre
Average Time (hr): 8.0 -
Activity : Mowing (deck 60" or less)
Unit: Acre
Average Time (hr): 1.8 -
Activity : Mowing (deck greater than 60")
Unit: Acre
Average Time (hr): 0.8 -
Activity : Dethatching
Unit: Acre
Average Time (hr): 12.0 -
Activity : Edging Walkways
Unit: 100 ft
Average Time (hr): 0.1 -
Activity : Edging Beds
Unit: 100 ft
Average Time (hr): 0.1 -
Activity : Weeding Shrub Beds
Unit: 1,000 sq ft
Average Time (hr): 0.5 -
Activity : Weeding Flower Beds
Unit: 1,000 sq ft
Average Time (hr): 1.5 -
Activity : Prunning Shrubs
Unit: Acre
Average Time (hr): 15.0 -
Activity : Shearing Hedges
Unit: 100 ft
Average Time (hr): 0.5 -
Activity : Leaf Removal - Beds
Unit: Acre
Average Time (hr): 1.2