Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
1. Building Cooling Load
-
Chiller Load (kWh)➗Chiller Rating (kWh/ton-hr) = __________ Cooling Load (ton-hr)
-
2. Required Storage Capacity
-
Cooling Load (ton-hr)✖️13.1✖️Reserve Capacity Factor = __________ Storage Capacity (gal)