Information

  • Job Number

  • Contracts Manager

  • Auditor

  • Conducted on

  • Location
  • Personnel

  • Main Task

  • Asbestos Material

  • Asbestos Type

  • Priority visit?

  • Job Notified?

SITE GENERAL

  • Is the site secure?

  • Are there adequate welfare facilities in place?

  • Are pedestrian route and walkways clear?

  • Are first aid and fire equipment available?

  • Is there adequate lighting?

PLANNING AND DOCUMENTATION

  • Has the POW been approved? (Minor/Compliance)

  • Have you checked the POW, ASB5 and Risk assessments?

  • Is the scope of work adequately described in the plan of work?

  • Is there a copy of the Asbestos licence and Waste carriers licence?

  • Is there a site information board on display?

  • Does the site layout agree with the drawings and photos and include the correct enclosure sizes and location?

  • Does the POW include the following - Air monitoring arrangements, 4 Stage clearance, smoke testing and witnessing, Type of RPE and the hours of work?

  • Has the supervisor completed the daily checks paper work?

REGULATORY RECORDS

  • Is all personnels training in date? (Asbestos Training - Medicals - Face Fits - Mask Cert)

SITE PREPARATION

  • Are any of the following activities or equipment being used? If so please comment if any non compliance.

  • Are any vibrating Tools being used on site and is the correct documentation being used?

  • Excavations, shafts, and tunnels raised flooring/tiles

  • General slab, edge and riser protection

  • Scaffolding

  • Ladders and steps

  • Cranes, hoists & lifting equipment

  • Services riser signage & control

  • Cable management

  • Temporary electrical supplies

  • Mobiles towers

  • Confined space

  • Abrasive wheels

  • COSHH & hazardous substances

  • Manual handling

  • Asbestos management

  • Comments<br>

  • During preparation /sheeting is the correct PPE & RPE being used?

  • Has the supervisor confirmed all ducts, hidden voids and pipes have been sealed?

  • Has all electrical plant been isolated or protected from water ingress?

AIRLOCK AND BAGLOCK

  • Has the airlock, baglock and enclosure have vision panels/CCTV fitted, can all areas be viewed?

  • Is the airlock, baglock and enclosure clean and free of debris?<br>Check flaps and signage?

  • Are the work areas/enclosures on carpet? If so has boarding been been used to overlay the carpet?

PPE

  • Are all operatives wearing and using the PPE correctly?

  • Have all masks been checked by a competent person? (Daily)

CONTROL MEASURES-DUST REDUCTION/WET STRIPPING

  • Are dust levels being reduced to the lowest practicable levels?

  • Has personal monitoring been carried out between 1-4 hours?

PLANT AND EQUIPMENT

  • Is the NPU and area clear of debris and in dry condition?

  • Is the NPU working correctly? Check air flow indicator

  • Is the NPU correctly sheeted to the enclosure?

  • Does the NPU vent to the outside atmosphere?

  • If venting inside is there regulars air monitoring taking place

  • Are DOP/Electrical certificates available and in date for the NPU's and HVAC's?

  • Has the roving head calculation been included in the POW?

  • Is work being carried out that exceeds the mandatory noise level for PPE 85db

WASTE HANDLING AND DISPOSAL

  • Is there a suitable waste route with signage? And does it follow the POW?

  • Have all waste bags been sufficiently soaked? Check for moisture content.

  • If waste is being temporally stored, is the area labelled and secure?

  • What condition is the skip? Is it lockable? Are suitable signs present?

  • Is there a waste note on site?

  • Oils & diesel fuels stored in bundled areas away from drains

  • If spill kits are required, are they being used?

  • COMMENTS

TRANSIT PROCEDURE

  • Is the transit procedure being followed correctly?

  • Is there signage to show transit route?

  • If site is occupied (other trades etc) is transite route barriered or personnel accompanied?

  • Are wheelie bins being used as stated in POW?

HYGIENE FACILITY/DECONTAMINATION UNIT

  • Is the DCU connected to the enclosure? If not is it stated why on the POW?

  • Are the following certification in place and in date? - Gas/Electrical/DOP and air clearance

  • Is the DCU compliant with HSG247? E.g legs down and earthed, warning signs on doors, adequate showering facility and supplies, vents, all areas free of dust?

  • Is there any damage to the outside unit and is it clean?

  • Is the gas detected fitted and working?

  • Is the waste water from the DCU filtered and discharging to foul sewer?

  • Are hooks available in the shower to hang RPE whilst showering?

  • Are all doors self closing?

  • Are there sufficient DCUs/showers for the number of personnel on site (1shower: 4persons)

  • Are all vents clear of dust and ingrained dirt?

VAN

  • Has it been air tested within the last two months?

  • Is the waste compartment airtight and in good condition?

  • Select from range

  • Select date

  • Supervisor

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.