Information
-
Job Number
-
Contracts Manager
-
Auditor
-
Conducted on
-
Location
-
Personnel
-
Main Task
- Environmental clean
- Clean removal
- Encapsulation
- Ancillary
- Supervisory
- Waste Handling
-
Asbestos Material
- Sprayed Coating
- Insulation
- AIB
- Cement
- Textured Coating
- Floor Tiles
- Gasket & Rope
- Asbestos Debris
-
Asbestos Type
- Chrysotile
- Amosite
- Crocidolite
- Amosite/Chrysotile
- Actinolite
- Anthophylite
- Tremolite
-
Priority visit?
-
Job Notified?
SITE GENERAL
-
Is the site secure?
-
Are there adequate welfare facilities in place?
-
Are pedestrian route and walkways clear?
-
Are first aid and fire equipment available?
-
Is there adequate lighting?
PLANNING AND DOCUMENTATION
-
Has the POW been approved? (Minor/Compliance)
-
Have you checked the POW, ASB5 and Risk assessments?
-
Is the scope of work adequately described in the plan of work?
-
Is there a copy of the Asbestos licence and Waste carriers licence?
-
Is there a site information board on display?
-
Does the site layout agree with the drawings and photos and include the correct enclosure sizes and location?
-
Does the POW include the following - Air monitoring arrangements, 4 Stage clearance, smoke testing and witnessing, Type of RPE and the hours of work?
-
Has the supervisor completed the daily checks paper work?
REGULATORY RECORDS
-
Is all personnels training in date? (Asbestos Training - Medicals - Face Fits - Mask Cert)
SITE PREPARATION
-
Are any of the following activities or equipment being used? If so please comment if any non compliance.
-
Are any vibrating Tools being used on site and is the correct documentation being used?
-
Excavations, shafts, and tunnels raised flooring/tiles
-
General slab, edge and riser protection
-
Scaffolding
-
Ladders and steps
-
Cranes, hoists & lifting equipment
-
Services riser signage & control
-
Cable management
-
Temporary electrical supplies
-
Mobiles towers
-
Confined space
-
Abrasive wheels
-
COSHH & hazardous substances
-
Manual handling
-
Asbestos management
-
Comments<br>
-
During preparation /sheeting is the correct PPE & RPE being used?
-
Has the supervisor confirmed all ducts, hidden voids and pipes have been sealed?
-
Has all electrical plant been isolated or protected from water ingress?
AIRLOCK AND BAGLOCK
-
Has the airlock, baglock and enclosure have vision panels/CCTV fitted, can all areas be viewed?
-
Is the airlock, baglock and enclosure clean and free of debris?<br>Check flaps and signage?
-
Are the work areas/enclosures on carpet? If so has boarding been been used to overlay the carpet?
PPE
-
Are all operatives wearing and using the PPE correctly?
-
Have all masks been checked by a competent person? (Daily)
CONTROL MEASURES-DUST REDUCTION/WET STRIPPING
-
Are dust levels being reduced to the lowest practicable levels?
-
Has personal monitoring been carried out between 1-4 hours?
PLANT AND EQUIPMENT
-
Is the NPU and area clear of debris and in dry condition?
-
Is the NPU working correctly? Check air flow indicator
-
Is the NPU correctly sheeted to the enclosure?
-
Does the NPU vent to the outside atmosphere?
-
If venting inside is there regulars air monitoring taking place
-
Are DOP/Electrical certificates available and in date for the NPU's and HVAC's?
-
Has the roving head calculation been included in the POW?
-
Is work being carried out that exceeds the mandatory noise level for PPE 85db
WASTE HANDLING AND DISPOSAL
-
Is there a suitable waste route with signage? And does it follow the POW?
-
Have all waste bags been sufficiently soaked? Check for moisture content.
-
If waste is being temporally stored, is the area labelled and secure?
-
What condition is the skip? Is it lockable? Are suitable signs present?
-
Is there a waste note on site?
-
Oils & diesel fuels stored in bundled areas away from drains
-
If spill kits are required, are they being used?
-
COMMENTS
TRANSIT PROCEDURE
-
Is the transit procedure being followed correctly?
-
Is there signage to show transit route?
-
If site is occupied (other trades etc) is transite route barriered or personnel accompanied?
-
Are wheelie bins being used as stated in POW?
HYGIENE FACILITY/DECONTAMINATION UNIT
-
Is the DCU connected to the enclosure? If not is it stated why on the POW?
-
Are the following certification in place and in date? - Gas/Electrical/DOP and air clearance
-
Is the DCU compliant with HSG247? E.g legs down and earthed, warning signs on doors, adequate showering facility and supplies, vents, all areas free of dust?
-
Is there any damage to the outside unit and is it clean?
-
Is the gas detected fitted and working?
-
Is the waste water from the DCU filtered and discharging to foul sewer?
-
Are hooks available in the shower to hang RPE whilst showering?
-
Are all doors self closing?
-
Are there sufficient DCUs/showers for the number of personnel on site (1shower: 4persons)
-
Are all vents clear of dust and ingrained dirt?
VAN
-
Has it been air tested within the last two months?
-
Is the waste compartment airtight and in good condition?
-
Select date
-
Supervisor
-
Auditor