Title Page
-
Site name
-
Site post code
-
Conducted on
-
Prepared by
Signal Levels
Levels before works is carried out at receiver location
-
Take readings on mux 12418 V
-
What is the power level
-
What is the Link margin level
-
What is the Carrier noise level
-
Picture of the meter screen
Levels at dish, after LNB has been replaced and dish peaked
-
Take readings on mux 12418 V
-
What is the power level
-
What is the Link margin level
-
What is the Carrier noise level
-
Picture of the meter screen
-
Picture of the dish and it's surrounding
-
Picture of Line of site
Levels at receiver after works has been completed
-
Take readings on mux 12418 V
-
What is the power level
-
What is the Link margin level
-
What is the Carrier noise level
-
Picture of the meter screen
Receiver and installation information
-
Describe access to dish location
-
Overall dish condition, including LNB holder
-
What remedial works are required
-
Confirm cable type
-
Confirm F connections are in good condition
-
What remedial works are required
-
Confirm Receiver location
-
Confirm monitor was installed
-
Tune receiver to 12418 V 28000 7/8
-
Picture showing receiver and monitor displaying sky news
Testing on projector
-
Has the receiver been tested on a projector
-
Which screen number was this tested on
-
Picture of receiver working on screen
Additional information/ sign off
Additional information
-
Any additional comments/ remedial works
-
Any additional photos
Sign off
Client
-
Client/Site Contact Name
-
Client/Site Contact Position
-
Client/Site Contact Signature
Engineer
-
Engineer Name
-
Engineer signature