Title Page
-
Site conducted
-
Equipment Number
-
Conducted on
-
Turn In Date
-
Prepared by
Survey
Tank Condition
-
Is there any visible staining present on tank (i.e. rust, paint, greases etc)?
-
Are there any areas of rust visible?
Pipework
-
Are dust caps installed and tethered?
-
Are drip trays secure and free of debris?
-
Condition of the drip trays?
-
Where installed is the vaporiser guard present?
-
Is any pipework damaged?
-
Are all relief valves installed?
-
Are valves handles present?
-
Has any pipework been subject to repair?
Container Inspections
-
Last dangerous goods inspection
-
Last date of visual
-
Last date of visual will be either V, VN or T
-
Last date of NDE
-
Last date of visual will be either VN or T
Sling Inspections
-
Last date of visual
-
Last date of visual will be either V, VN or T
-
Last date of NDE
-
Last date of visual will be either VN or T
Frame
-
Are the fork pockets damaged?
-
Is the framework damaged?
- No visible damage
- Corner post damaged
- Skid member damaged
- Top rails damaged
- Roof supports damage
- Side panels damaged
- Other members damaged
- Ladder rungs damaged
-
Are all roof plates present and bolted down?
-
Have any repairs been undertaken?
-
Is the grounding lug present?
-
Is there any visible rust on the frame member or roof supports?
Decals
-
Corner post decals present?
-
Are previous customers logos installed?
-
Dangerous goods signage present?
-
Are any previous customer decals present?
Gauges
-
Is pressure gauge present?
-
Is the differential pressure gauge present?
Thermo Couple
-
Is the thermo couple missing?
Relief Valves
-
PRV 1 Pressure
-
Serial Number
-
PRV 2 Pressure
-
Serial Number
-
PRV 3 Pressure
-
Serial Number
-
PRV 4 Pressure
-
Serial Number
-
PRV 5 Pressure
-
Serial Number
-
PRV 6 Pressure
-
Serial Number
-
PRV 7 Pressure
-
Serial Number
Sling
-
Is a ling set installed?
-
Sling Number
-
Shackle 1
-
Shackle 2
-
Shackle 3
-
Shackle 4