Page 1: Initial questions

  • Conducted on

  • Prepared by

  • Location
  • Weather Conditions

Page 2: Site Office Checklist

  • Site Induction Records

  • Health & Safety Documentation on site (H&S Policy, RAMS)

  • Health & Safety Poster and Information on display

  • Company Quality Policy on site?

  • Company Environmental Policy on site?

  • CDM notice and F10 Displayed on site?

  • Construction Phase Plan on site and up to date?

  • Daily Sign in sheets up to date?

  • Permit to work sheets on site and up to date?

  • First aid kit accessible and fully stocked and conform to BS85:99?

  • Is the first aider identifiable on the notice board?

  • Are first aid kits regularly checked?

  • Burns Kits accessible and fully stocked

  • Accident reporting documentation available

  • Toolbox Talks - have they been conducted? Take image of recent talks.

  • Disciplinary actions - have any disciplinary actions been made?

  • PPE Register up to date?

  • Daily/Weekly plant inspection records up to date?

  • Excavations records up to date?

  • Scaffolding records up to date?

Page 3: Fire Safety Audit

  • Are there adequate fire fighting equipment in place?

  • Is there an adequate means of raising the alarm in the event of a fire?

  • Are fire exits signed and free from obstructions

Page 4: Site Welfare

  • Are the toilet facilities clean and in adequate condition?

  • Do the toilet facilities have hot water?

  • Is the canteen area in an adequate condition?

  • Waste management - is it suitable?

  • Is there adequate first aid for staff in these areas?

  • Are there separate facilities for men and women, or a lockable single toilet?

  • Is there adequate rest rooms, changing facilities and appropriate storage for worker clothing.

  • Is there adequate supply of clean drinking water?

  • Are there adequate facilities in place for the provision of hot beverages e.g. kettle.

  • Are designated smoking areas in place with sufficient no-smoking signage around the site?

Page 5: COSHH and DSEAR Audit

  • Do all substances and chemicals in use on site have a COSHH risk assessment?

  • Do all substances and chemicals on site have a MSDA?

  • Are chemicals stored appropriately?

  • Cylinders stored appropriately?

  • Are flammable liquids kept separate from LPG gas?

  • Are gas cylinders stored a minimum of 3 meters away from the building?

Page 6: On site

  • PPE in use on site?

  • Safety signs in use on site?

  • Any unsafe issues?

  • Storage of materials on site - are they in a safe condition?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.