Surveillance Report Information
OHS Worksite Surveillance Report
-
Job Number
-
Address / Reference Number
-
Client
-
Date
-
Inspected By:
-
Location
-
Team Name
-
Non Conformances that are (H = High Risk) must be acted on as soon as possible.
(M = Medium Risk) actions can be programmed for rectification.
OHS Controls
1. OHS Controls
-
1.1 Staff and Contractors have Work Cover Card and Drivers Licence- Rating High
-
Photo of Accreditations
-
1.2 Staff and Contractors have inducted to Site or signed into Building - Rating Medium
-
1.3 Visitor Log Book Signed. (Buildings) - Rating Medium
-
1.4 SWMA, SWMS and Safety Folder available on site - Rating High
-
Photo of SWMA
-
1.5 All Site Specific Hazards have been Identified and Controlled - Rating High
-
1.6 On Larger Projects are Toolbox Talks available - Rating Medium
-
1.7 On Larger Projects Site Specific OHS Management Plan Onsite - Rating Medium
-
1.8 Emergency Contacts Onsite -Rating Medium
-
Photo of Emergency Contacts
-
1.9 PPE available and being used -Rating High
-
1.10 First Aid Kit Class B for up to 25 Staff. See checklist in Safety Folder Section 8 - Rating High
-
Comment / Actions Taken and Date
-
1.11 Sharps Kit Contents Onsite -Rating High
-
1.12 Vehicle and Plant Hazard Lights On -Rating Medium
Traffic Controls
2. Traffic Controls
-
2.1 Traffic Plan is Available Onsite - Rating Medium
-
Photo of Traffic Plan
-
2.2 Traffic Plan Scenarios
-
Photo of NBN Scenario
-
2.3 Does Traffic Plan adequately control Pedestrians and Vehicles - Rating High
-
Photo of Site Set Up
-
2.4 Traffic Plan Evacuation Points - Rating High
-
Photo of Evacuation Plan
-
2.5 Traffic Controllers have Tickets Onsite -Rating Medium
-
Photo of Accreditations
-
2.6 Traffic Controllers wearing PPE - Rating Medium
-
2.7 Traffic Controllers using appropriate Signage -Rating Medium
-
2.8 Are Staff regularly inspecting traffic control setup - Rating Medium
Environmental Controls
3. Environmental Controls
-
3.1 CCTS Chemical Matrix Onsite -Rating Medium
-
3.2 Spill Kits Onsite (Heavy Vehicles and Plant) - Rating High
-
3.3 Erosion and Sediment Controls in place - Rating High
-
3.4 Dust Controls (Refer to Dust SWMS) -Rating Medium
-
3.5 Noise Controlled (Refer to Noise SWMS) -Rating Medium
-
3.6 Weekly Vehicle Checks Completed - Rating Medium
-
3.7 Daily Plant Checks Completed - Rating High
-
Photo of Plant Checks
-
3.8 Loads Covered to prevent spillage - Rating High
-
3.9 Site Clear of Waste, Rubbish and Debris - Rating High
-
3.10 Environmental Checklist Completed - Rating High
Work Standards
4. Work Standards
-
4.1 Materials and Tools used as specified - Rating Medium
-
4.2 Job Pack, Instructions Onsite - Rating Medium
-
4.3 Job As Built Information Accurate - Rating High
-
4.4 Construction to Specifications - Ratings High
Work Standards Technical
4. Work Standards -Technical
-
4.5 Site Log Book Signed -Rating Medium
-
4.6 Contractor ID Valid and on display - Rating Medium
-
4.7 Contractors Telstra Site Induction Certification Number available Onsite - Rating Medium
-
4.8 Contract Product Quality and OHS Plan Onsite -Rating Medium
-
4.9 Contract / Product Risk Assessment Plan Onsite - Rating High
-
4.10 Hard Copy of Detailed Design Onsite - Rating High
-
4.11 Work Instructions Available - Rating Medium
Others
5. Others
-
Others
-
Others
-
Rating
-
Conforms, Non Conforms, N/A
-
Comments / Action Taken and Date