Information

  • Document No.

  • Audit Title

  • Client / Site (displayed on front page)

  • Conducted on

  • Prepared by

More than one auditor?

  • Additional auditors

  • Permit is authorised for the shift

  • Permit is valid and suitable for the activity being performed

  • Personnel trained in the Contractor permit to work program

  • Isolations in place and verified where relevent (electrical isolations, isolation point, lock out tag out)

  • Personal danger tags and isolation tags correctly filled out and fitted where applicable (isolation permits)

  • Permit requirments have been communicated for the task and understood be all

  • A copy of the original permit is located with the work group

  • Permit is accompanied by a SWMS / JSEA

  • Permits have been closed-out correctly and filed

  • Permit register is maintained

  • Action required?
  • Action

  • Action due

  • Allocated to

  • Signed PoMC Representative:

  • Signed Principal Contractor Representative (optional):

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.