Information
-
Document No.
-
Audit Title
-
Client / Site (displayed on front page)
-
Conducted on
-
Prepared by
More than one auditor?
-
Additional auditors
-
Permit is authorised for the shift
-
Permit is valid and suitable for the activity being performed
-
Personnel trained in the Contractor permit to work program
-
Isolations in place and verified where relevent (electrical isolations, isolation point, lock out tag out)
-
Personal danger tags and isolation tags correctly filled out and fitted where applicable (isolation permits)
-
Permit requirments have been communicated for the task and understood be all
-
A copy of the original permit is located with the work group
-
Permit is accompanied by a SWMS / JSEA
-
Permits have been closed-out correctly and filed
-
Permit register is maintained
Action required?
-
Action
-
Action due
-
Allocated to
-
Signed PoMC Representative:
-
Signed Principal Contractor Representative (optional):