Groundwater Spear Installation & Excavation
-
Physical fall prevention established?
-
Signage to be displayed a minimum two meters from the excavation
-
Current permits/ certificates in place for earthworks (e.g. Ground penetration)
-
As a minimum excavations are benched at sand (clean) 1.5 : 1
-
No Go Zone signage installed, along with hard barriers, at the ends of Kooringa Way and Webb Dock Drive to prevent from entering Howe parade.
-
Ingress, egress, deep excavation and authorised personnel only signs implemented
-
Toothed buckets to be used to dig either side of the pipes (no closer than 300mm to the pipelines).
General Observations
Excavation access/egress
-
45 degree access ramp installed at the end of excavation where the pipes are located
-
Crushed rock placed and maintained to ensure non-slip conditions are maintained at all times.
-
Access/ egress ramp free from obstructions
Traffic Management
-
All vehicles, plant and equipment are fitted with flashing rotating Amber beacons and audible reverse alarms are operational
-
Condition of internal roads maintained to acceptable standard
-
Are traffic management plans current?
-
Are internal road intersections clearly sign posted?
Coating Removal Works
-
Coating removed in small pieces by way of brass hammer
-
Removed coating pieces are captured in plastic and double bagged for off-site removal.
General
-
5m exclusion zone around each item of plant established
-
Any other hazard
Training
-
Personnel inducted onto site (BMD/ Shell / APA)
Action required?
-
Action
-
Action due
-
Allocated to
-
Signed PoMC Representative:
-
Signed Principal Contractor Representative (optional):