Mining Area Inspection Checklist
Prestart
-
Have all CMW's on shift attended pre start and signed attendance register?
-
Has OCE report, previous shift incidents, relevant safety information, known hazards and traffic management changes been communicated to CMW's?
-
Have clear task instructions been issued to all CMW's for relevant assigned tasks?
-
Are all active JA's communicated and read/signed as appropriate by involved team members?
-
Are geotechnical hazards communicated to CMW's
Crib hut/Facilities
-
Is housekeeping to standard?
-
Is the crib hut stocked for the next shift? (Water, coffee, milk, PPE, etc)
-
Are LV/MV park ups compliant?
General/HSEC
-
Review/Audit of 2x LV or equipment prestarts completed
-
Please provide details of equipment and findings:
Dig unit locations
-
Have all dig unit locations been inspected? Please photograph each location ad attach
-
Is high activity mining area signage in place where equipment can unintentionally enter 50m radius of excavator/loader?
-
If yes - Please list location(s)
-
Is pit edge and high wall standoff bunding adequate?
-
Is the work area being excavated to design (Eg floor RL/Batter design)?
-
Excavators- dig face less then cab height, dig bench safe height suitable for machine?
-
Are lighting plants in place, provide adequate lighting and are bunded/delineated in suitable location?
-
Is designated LV park up established and bunded/delineated in suitable location?
-
Open Edges- Have you checked that the required controls are in place and are effective above and below dig units
Hauling locations
-
All traffic signage in place and to standard (Also clean, visible)?
-
All traffic delineation in place and to standard (Also clean, visible)?
-
Are all haul roads compliant to standard (Eg road width, grade <10%, bunds)
-
Is adequate drainage in place for potential wet weather?
-
Are all intersections compliant to standard (Including visibility)?
-
Have new intersections been constructed during shift without checklist completed? (Action required to complete checklist and detail interim controls)
-
If yes - Has checklist been completed? (Attach photo)
Dumping locations
-
Have all dump locations been inspected? Please photograph each location and attach.
-
Where dump height exceeds 20m, is v drain installed and trucks tipping short?
-
Where hazardous body of water or mud exists at base of dump, is v drain installed and trucks tipping short?
-
Has slumping, cracking been observed on dump edges and not rectified/made safe?
-
Access to base of dump restricted (Bunded)?
-
Are all dump bunds to half largest tyre height?
-
Is dump plan in place and being followed (Eg material type, rejects, ratio, limits, RL)?
-
Are lighting plants in place, provide adequate lighting and are bunded/delineated in suitable location?
-
Is designated LV park up established and bunded/delineated in suitable location?
Water Truck Management
-
Are water trucks spot spraying as per procedure?
-
Where dusty conditions exist, is water cart utilisation being increased (Eg hot seating water truck)?
General
-
Are all access points to active mining areas bunded, with appropriate signage at entry points?
-
Are controls in place for any hazardous bodies of water to protect personnel from harm?
-
Have any open edges been left at end of shift without adequate bunding in place?
-
If yes - Has relevant persons/Supervision been notified & controls in place?
-
If any open edges not rectified before end of shift, have relevant persons/Supervision been informed?
-
If relocating within the next 24hrs, has the route been inspected and discussed with operator?
-
If relocating in the next 24hrs, has the area been inspected and made compliant?
-
Have all redundant work areas/locations been bunded off where possible?
AHS Specific Inspection
-
Are speed or traction zones in place to ensure safe operations when hazards or reduced traction exists?
-
Please list speed zones in place
-
Please list traction zones in place
-
Is AOZ signage and delineation in place and to standard?
-
Is AOZ area access control in place and effective (Eg gates)
-
Are manual haul trucks and AMT's working in the same areas?
-
If yes - What controls are in place to ensure safe operations?
Sign Off
-
Date/Time
-
Signature