Title Page
-
When complete please email completed inspection to Kirsten. kvanden@scstechnologies.co.uk
-
Site conducted
-
Conducted on
-
Engineer Name
-
Location
-
Please Input SCS Job Number
-
Arrival Time on site
-
Have you completed Site induction?
-
How long did site induction take? (mins)
-
Name of Builder
-
is this an Install or De-Rig
-
Have SCS Hired a Scaffold Tower/Platform?
-
Have you used any cable?
-
Cable type
-
Internal or External grade?
-
Cable Length? (m)
-
Have you used more than 30 metres WF100?
-
How much cable have you used in total? (m)
-
Please input length of each cable type (m)
-
Have you used a mast?
-
Have you used any T&K's?
-
Size?
-
Have you used an NPR?
-
How many NPR bases have you used?
-
How many blocks have you used?
-
Have you used an NPR Pole/Jack Leg?
-
Have you used back to back clamps?
-
Have you used any trunking?
-
What size trunking have you used?
-
What length of trunking have you used (m)
-
Have you moved trunking off van stock on Tesseract?
-
Please upload internal photos including cabling and equipment
-
Please upload external photos
-
Any Equipment not installed?
-
What equipment wasn't installed and why?
-
Full name of site contact
-
Signature of Site Contact
-
Please input Onwave clear code.
-
Engineer Notes
-
Reason for any delays/extra time on site
-
Departure time from site (This answer will auto-complete, please do not adjust)
-
Total time on spent on site? (mins)
-
Please Send completed Audit To Kirsten Vanden
-
What kit have you derigged?
-
Where are you sending the Onwave Kit?
-
Full name site contact.
-
Signature of Site Contact
-
Please input Onwave clear code.
-
Engineer Notes
-
Full name of Site Contact
-
Signature of Site Contact
-
Onwave Clear Code