Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre Start
-
Parts ordered?
-
Plans printed?
-
Plans marked up?
-
Cabinet plans received?
-
Cabinet plans printed?
-
NBN delivery determined?
-
Antenna requirements determined?
-
Appliance spec received?
-
Walkthrough performed?
-
Revised quote approved?
-
On-site
-
Who is performing checklist?
- Tom Sawyer
- Jay Schuweiler
- Will Sutherland
- Beau Kennedy
- Rhylie Townsend
- Brock Will
-
Have floor plan and cabinet elevations been cross referenced?
-
Internal sub-board location determined?
-
Island bench marked out by builder?
-
Floor marked out with measurements ?
-
Patch panel location determined?
-
Manhole location determined?
-
Nail brackets installed?
-
All support noggins installed?
-
Noggins and top plates drilled out?
-
All dedicated circuits run?
-
All Power feeds run back to board?
-
All GPO’s run?
-
External GPO’s run?
-
Island bench power feed run?
-
Any lighting in island bench?
-
Check wet area clearances
-
Check GPO’s don’t fall on tile edge if not fully tiled walls
-
Check all above bench heights are 150mm AB taking into account FFH (unless otherwise noted)
-
Lighting feed ANE’s installed back to board?
-
Lighting circuit ANE’s looped?
-
All switch actives installed?
-
All LED cabling run?
-
All 2-way and 3-way wiring run? <br>
-
All pendants on a nail?
-
All ceiling fans on a nail?
-
Exhaust fans clearances checked?
-
Exhaust fan ducts run?
-
Range hood duct installed?
-
Are all smoke alarms run?
-
All data points run?
-
All TV points run? <br>
-
Antenna installed out of site from front of building?
-
Intercom cabling run?
-
All lighting tails labelled?
-
Plans checked off?
-
Plans marked up with measurements?
-
Photos of wet areas?
-
Worksite swept and rubbish in skip?