Title Page
-
Full Name:
-
Conducted on:
-
Prepared by:
-
Site Address:
-
INSTRUCTIONS
-------------------
1. Please answer "Pass," "Fail," or "N/A" on the questions below.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link
Other user details
-
Title
-
Email
-
Mobile
-
Manager
-
User Location
General Details
-
Job Reference Number:
-
Job Description:
Section 1: Worksite Hazard ID
-
Worksite Hazard ID completed
-
Hazards identified and controlled
-
Residual risk is rated C or below
-
SWMS in use
-
Evidence of Pre-start meeting undertaken
-
Subcontractors on site signed on and implementing controls
Section 2: Worksite Competencies
-
Drivers Licence current
-
Operating Licences are current
-
TC/STMS Card current
-
Employee ID Card(s) current
-
Competencies verified and current
Section 3: Personal Protective Equipment
-
Head Protection: Climbing Helmet/Hard Hat worn when required
-
Face Protection: Shield/Mask worn when required
-
Ear Protection: Ear Muffs worn when required
-
Eye Protection: Safety Glasses/Goggles worn when required
-
Safety Footwear
-
Hi-Viz Vest
-
Gloves worn when required
-
PPE being worn correctly
-
All PPE compliant with applicable AS/NZS standard
Section 4: Authority/Permits to Work
-
Authority Holder has correct ATW for high risk activity been performed
-
Power - Close Approach Consents on site
-
Corridor Access Request (CAR) on site
-
Notifiable work - Work Safe contacted
-
Permit to Work in place when required
-
Gas - Close Approach Consent on site
-
Outside MAD Close Approach Consent
-
Approved Permit Issuer and or Receiver on site if permitted work been undertaken
-
Work Authority Permit (WAP) on site
-
Confined Spaces Entry Permit Issued
Section 5: Emergency Management
-
Emergency assembly point established
-
First aid kit present current
-
Workers questioned and understand correct emergency procedures for their site
Section 6: Work Site Setup
-
Vehicles parked safely
-
Equipment positioned safely
-
Van locked when out of site
-
Approved Traffic Management Plan and site setup as per TMP
-
General Site Housekeeping
-
Work Area/Plant Isolated From Staff and Other Parties
-
Site security in place and when unattended
-
Site Set Out According To Job Start
Section 7: Environment
-
Relevant permissions/consents in place
-
Spill kits present where required
-
Sediment controls in place
-
Environmental risks managed as detailed in SWMS
Section 8: Underground/Overhead Services
-
Service plans are current and maintained on site
-
Approved tools in use
-
Correct colour coding has being used by locator
-
Services have been potholed
-
Spotters used where required
-
MAD Maintained
Section 9: Hazardous Materials
-
Hazardous Materials on Site labelled, sealed, stored and used correctly
-
Safety Data Sheets on Site
Section 10: Vehicles and Plant
-
Pre-start complete for relevant plant/equipment
-
Vehicles/plant in good condition
-
Fire extinguisher tested and tagged
-
Mobile Plant or Scaffolding Earthed
-
Trucks and trailers chocked on obvious sloped ground
-
Vehicles/plant suitable for tasks undertaken
-
Equipment calibration current
-
Vehicles/plant have current RUC, CoF, WoF,Rego
-
Spill kit available on truck
-
Electrical test and tag
SECTION 11: Audit Sign Off
-
Overall rating if this site
-
Auditor's Name & Signature:
-
Auditee's Name & Signature: