Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Information
-
Supervisors Name
-
Contract Managers Name
-
Operatives On Site
-
Brief Description Of Works
-
ASB5 Notifiable
-
Start Date
-
Finish Date
1.0 Scope Of Works
-
1.1 Is there at least one certificated asbestos supervisor as a minimum and as named on the P.O.W and ASB5
-
1.2 Is the ASB5 correct in detailing of asbestos and quantity as stated in the P.O.W
-
1.3 Is the total number of persons on site less than or equal to that is stated on the ASB5
-
1.4 Is the scope of works correctly described in the P.O.W
2.0 Plan Of Works And Documentation
-
2.1 Does the P.O.W detail the client for the works
-
2.2 Can you confirm that the wording in the plan of works is clear and concise
-
2.3 If any changes have been made to the P.O.W, are the correct amendments in place, and have they been agreed with the contracts manager and signed
-
2.4 Is there a copy of Oracles S.O.P available on site
-
2.5 Has the supervisor and the operatives on site all signed the P.O.W (Question the operatives on the P.O.W)
-
2.6 Has the P.O.W been compiled by a competent person and signed off
-
2.7 Does the P.O.W stated the correct date, and is there an reasonable estimated finish date
-
2.8 Are the working hours in the P.O.W and ASB5 being worked to
-
2.9 Does the plan of works state the company providing analytical support and 4 stage clearance
-
2.10 Does the P.O.W accurately detail the type, condition and form of ACM's
-
2.11 Does the P.O.W detail the method of works accurately (ie) Removal, Encapsulation, Re-in statement
-
2.12 Is the correct type of respirator to be used including filters as stated in the P.O.W
-
2.13 Does the P.O.W detail the arrangement made for witnessing the smoke test
-
2.14 Does the sketch match the site set up...including DCU, Air/Bag locks, Viewing Panels, CCTV, Waste and Transit Routes
-
2.15 Are the enclosure dimensions correct and adhered to on site as detailed in the P.O.W
-
2.16 Does the P.O.W detail entry/exit or transit procedures to be followed during works
-
2.17 Have all hazards on site been identified with appropriate risk assessments for all to view
-
2.18 Have chemicals on site been identified and appropriate CoSHH assessments available for all to view
-
2.19 Where electrical isolations are required, is there suitable certification of isolation
-
2.20 Is the contractors site diary available for inspection and up to date
-
2.21 Is there a current medical certificate on site for each supervisor and operative (2 yearly)
-
2.22 Are the R.P.E check lists filled out prior to use
-
2.23 Is there a current in date face fit (both masks) available for each supervisor and operative (6 monthly)
-
2.24 Are supervisors daily checks up to date
-
2.25 Are the analysts documents up to date and on site
-
2.26 Has all supervisors and operatives personal paper work been verified and stamped
3.0 Site Set Up And Plant Use
-
3.1 Have viewing panels and CCTV been set up to view works inside the enclosure as detailed in the P.O.W
-
3.2 Have adequate warning signs been displayed
-
3.3 Is the supervisors board clearly on display and showing all current documentation
-
3.4 Is the works vehicle parked Ina suitable location so as not to inconvenience the public or others on site
-
3.5 Is there adequate first aid and fire fighting equipment present on site
-
3.6 Are there at least two H-Type vacuums on site
-
3.7 Are current copies of DOP's available on site for all individual plant on site, and in date (6 monthly)
-
3.8 Are all other electrical plant on site PAT (3 monthly) tested and in date
-
3.9 Does the number of NPU's correspond with that stated in the P.O.W
-
3.10 Is there sufficient negative pressure within the enclosure
-
3.11 Is the enclosure getting the adequate air changes stated in the P.O.W
-
3.12 Is there a H-Type vacuum just inside the enclosure and at least one more within the work area, and does they all work
4.0 RPE and PPE
-
4.1 Is the RPE in use as stated in the P.O.W
-
4.2 Are all asbestos supervisors and operatives on site clean shaven
-
4.3 Are spare filters available on site
-
4.4 Is the correct RPE being used by all operatives
-
4.5 DO all masks on site have individual ID tags or serial numbers
5.0 DCU
-
5.1 Is the DCU positioned as stated in the P.O.W with the transit route as short as possible
-
5.2 Is the DCU directly connected to the enclosure, if not is thee a valid reason
-
5.3 Does the power supply have a RCD fitted
-
5.4 Is there enough storage lockers
-
5.5 Is the heater working within the DCU
-
5.6 Are all internal doors self closing with a good seal
-
5.7 Is the DCU adequately earthed (Easy Plug)
-
5.8 Is the DCU clean internally and externally
-
5.9 Is the waste water filtered and being discharged to the closest foul drain
-
5.10 Date of last filters changed
-
5.11 Is there adequate hot water
-
5.12 Are there sufficient 13 amp plug sockets available to charge power packs
-
5.13 Are there adequate towels and shampoo
-
5.14 Is there nail brushes within the shower
-
5.15 Is there a current DOP got the NPU and in date (6monthly)
-
5.16 Is there a current gas safety certificate (12 monthly)
-
5.17 Is there a current (NIC) electrical installation certificate (12 monthly)
-
5.18 Are there sufficient shower heads to allow one per maximum of 4 operatives
-
5.19 Is the DCU in good condition and free of mould
-
5.20 Is there a clearance certificate from the last job
-
5.21 Do the clean and dirty end doors have correct signage
-
5.22 Does the DCU have a carbon monoxide detector inside the clean end
-
5.23 Is the dirty end door locked
6.0 Enclosure
-
6.1 Is the enclosure including air locks and bag locks of sound condition and robust enough to maintain integrity throughout the course of works
-
6.2 Are the bag locks fitted to the enclosure adequate for the size of ACM's leaving enclosure
-
6.3 Are the bag locks free from visible debris
-
6.4 Is the waste route free from visual debris and are all pourers areas adequately covered
-
6.5 Are the air locks clean and tidy and of correct size as states in P.O.W
-
6.6 Is there a vision panel to the inner stage of the airlock and bag lock minimum 600mm x 300mm
-
6.7 Is there sufficient overlap and weighting to flaps of air lock and bag lock to provide suitable potential seal
-
6.8 On visual inspection was there any holes or breaks in the seal of enclosure, air locks and bag locks
7.0 Observed Works
-
7.1 Is the dust fibre suppression in use the same as prescribed in the P.O.W, and will it achieve adequate suppression accordingly to the exposure assessment
-
7.2 Is the waste correctly bagged in enclosure
-
7.3 IS the waste being correctly double bagged with in the bag lock using suppression and a H-Type vacuum
-
7.4 Is there a skip on site, is it in good condition with correct signage and locked when not in use
-
7.5 If there is no skip on site, are there adequate waste consignment notes on site relating to the ACM's being removed
-
7.6 IS all general non asbestos PPE being worn as stated in the P.O.W
-
7.7 Is the pre filter the only part of the NPU exposed to the working area
-
7.8 Are all operatives within the asbestos enclosure wearing the RPE and PPE correctly
-
7.9 Is the general site well organized and tidy within reason
8.0 Personnel and Company Vehicle
-
8.1 Do all Oracle Solutions persons on site have ID cards
-
8.2 Are all Oracle Solutions personnel wearing Oracle branded uniform
-
8.3 Is behavior of staff or contractors to an acceptable level
-
8.4 Was the response of the supervisor positive and pro active
-
8.5 Did operatives respond positively to instruction and advice
-
8.6 Has the company vehicle check list been completed as required
-
8.7 Is the vehicle clean internally and externally
-
8.8 Has the vehicle had a reassurance air test carried out by a qualified analyst within the last 30 days
-
8.9 Is the waste stored on the van held in waste compartment and way from tools and equipment ect
9.0 Additional Information From Audit
-
Supervisors Signature
-
Auditors Signature
-
Date and Time of Audit Completed