Title Page

  • Name of Project or Site

  • Location
  • Conducted on

  • Prepared by

  • Safety Management - Provide Evidence that Project is in compliance with each item

  • Project Safety Plan is posted and has been reviewed with team

  • Crisis Management Plan is posted and has been reviewed with Team

  • Safety PreCons for all sub-contractors have been completed

  • Orientations for all new hires/sub-contractors have been completed

  • Is a JSA completed for each work activity?

  • Quality of JSA

  • Project team can provide evidence of TOOLBOX TALKS

  • OSHA 300A is posted (Feb 1 - Apr 30)

  • Project Team can provide evidence of Employee Training

  • Silica Prevention Plan is up to date and has been reviewed with Team

  • SDS is readily available labels are correct on all chemicals containers

  • All Safe Work Permits are used and filled out correctly. (I.E. Confined Space Permit)

  • PPE - Provide Evidence that Project is in compliance with each item

  • Eye Protection (Goggles, Spoggles, Face Shield, Safety Glasses)

  • Head Protection (Class E Hard Hat & In compliance with manufactures recommendations of life)

  • Body Protection (Chemical suit, FR rated Clothing, Hi-Vis Clothing, Appropriate Clothing)

  • Foot Protection (Work Boot, Safety Toe, Metatarsal if task required, rubber or chemical boots, etc...)

  • Hand Protection (Correct Gloves used which include Cut, Impact, Welding, Cold Temp, etc..)

  • Respirator(s) including N95 Masks

  • Any Additional or Specialized PPE

  • WORKING AT HEIGHT - Provide Evidence that Project is in compliance with each item

  • Work At Heights Fall protection Hazards are eliminated or have reduced exposure

  • All Fall Hazards have been identified on PRE-TASK form(s) and reviewed with team

  • Anchor Point is in compliance and properly being used

  • Leading Edge Protection in place

  • Swing Radius has been identified and measures are in place

  • Fall Protection & Guarding is in compliance when using Scaffold, Scissor Lifts, Boom Lifts or any other means to work from height

  • Fall Rescue Plans is in Place and has been reviewed with team

  • Ladders & Stairs - Provide Evidence that Project is in compliance with each item

  • Is the Ladders Last Policy being implemented?

  • Appropriate Access Equipment in use and in good Condition

  • Step Ladder(s) are well maintained and in compliance with program

  • Extension Ladders are well maintained and in compliance with program

  • Work above 8' on a ladder has a ladder permit

  • Stairs Use and Conditions

  • All elevations of 19" has the correct proteciton in place

  • Electrical - Provide Evidence that Project is in compliance with each item

  • Pre-Energization Plan has been reviewed with project team

  • GFCI Testing Log validation

  • Temporary Panels are in use and in good condition

  • Extension Cords are in good condition and do not pose an electical hazard to others

  • Temporary Lighting is adequate and in good condition

  • Lockout / Tagout / Tryout

  • Excavations - Provide Evidence that Project is in compliance with each item

  • Competent Person is identified and on project site

  • Cave-In Protection and spoil piles are in compliance

  • Daily Dig Permit is filled out and accurate

  • Excel Spreadsheet for any open execavation over 5 feet

  • Utilities properly identified

  • Scaffold - Provide Evidence that Project is in compliance with each item

  • Competent Person is identified and on project site

  • Scaffold Erection is in good condition (Base, Cross Braces, Planks)

  • Scaffold has proper Guardrail system in place (toe board, mid rail, top rail)

  • Access is free and clear of any obstructions

  • Scaffold Tag is correct and has appropriate inspections marked.

  • General Conditions (Housekeeping, Nothing Hits The Floor) - Provide Evidence that Project is in compliance with each item

  • Cut Stations are are adequate for "NOTHING HITS THE FLOOR" policy

  • Waste Disposal recepticals are adequate for "NOTHING HITS THE FLOOR" policy

  • Elevated Cords/Hoses/Cabels are adequate for "NOTHING HITS THE FLOOR" policy

  • Storage of all Material is adequate for "NOTHING HITS THE FLOOR" policy

  • Loose Debris removal is adequate for "NOTHING HITS THE FLOOR" policy

  • Work Zone and Walk Paths - Provide Evidence that Project is in compliance with each item

  • Unauthorized access is prevented with the correct barricade

  • Walk paths are well maintained and free of obstructions to avoid slips/trips

  • Are areas beneath overhead work areas properly barricaded

  • Equipment - Provide Evidence that Project is in compliance with each item

  • Inspections have been completed

  • Back-up Alarms or similar protection plan in place for backing up equipment

  • Operator Training with Designated Operator Training List posted

  • Company Vehicles How's My Driving Sticker, Cargo Net

  • Hand & Power Tools - Provide Evidence that Project is in compliance with each item

  • Hand & Power Tools are in good Condition

  • Hand & Power Tools have appropriate guards and handles in the correct place

  • Hand / Power Tools when at height are practicing eliminating Falling Objects hazard

  • Correct use and selection of Hand / Power Tools for the job tasks

  • Fire & Hot Work Protection - Provide Evidence that Project is in compliance with each item

  • Flash Screens needed and in use

  • Welding Blankets and Spark Control

  • Combustibles Moved or Protected

  • Following Requirements of Hot Work Permit even if hot work is not in use

  • Extinguishers available and inspected

  • All Fuels are stored and used correctly

  • No quick connects on oxy, acetylene, or inert gas hoses

  • Team/Employees understand Fire Protection Plan, including what to do in the event of a fire?

  • Ergonomics & Lifting Techniques - Provide Evidence that Project is in compliance with each item

  • Are employees using good body mechanics

  • Are employees complying with 50 lb lifting limitation

  • Are employees performing morning and afternoon Stretch and Flex

  • Leading Indicator Management

  • Project/Site is completing BBS as required per Weitz Safety Manual

  • Site Leaders are reviewing BBS observations and communicating to employees

  • Site Leaders are completing Safety Inspections/iAudits

  • Safety Inspections/iAudits are of good quality (Comments, Pictures, Identified At Risks)

  • Review of previous Safety Managers Scored Audit (Validate site has previous report and has corrected concerns)

Audit Review and Comments

  • Comments / Suggestions

  • Project Team Leader Signature

  • Auditor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.