Title Page
-
Name of Project or Site
-
Location
-
Conducted on
-
Prepared by
-
Safety Management - Provide Evidence that Project is in compliance with each item
-
Project Safety Plan is posted and has been reviewed with team
-
Crisis Management Plan is posted and has been reviewed with Team
-
Safety PreCons for all sub-contractors have been completed
-
Orientations for all new hires/sub-contractors have been completed
-
Is a JSA completed for each work activity?
-
Quality of JSA
-
Project team can provide evidence of TOOLBOX TALKS
-
OSHA 300A is posted (Feb 1 - Apr 30)
-
Project Team can provide evidence of Employee Training
-
Silica Prevention Plan is up to date and has been reviewed with Team
-
SDS is readily available labels are correct on all chemicals containers
-
All Safe Work Permits are used and filled out correctly. (I.E. Confined Space Permit)
-
PPE - Provide Evidence that Project is in compliance with each item
-
Eye Protection (Goggles, Spoggles, Face Shield, Safety Glasses)
-
Head Protection (Class E Hard Hat & In compliance with manufactures recommendations of life)
-
Body Protection (Chemical suit, FR rated Clothing, Hi-Vis Clothing, Appropriate Clothing)
-
Foot Protection (Work Boot, Safety Toe, Metatarsal if task required, rubber or chemical boots, etc...)
-
Hand Protection (Correct Gloves used which include Cut, Impact, Welding, Cold Temp, etc..)
-
Respirator(s) including N95 Masks
-
Any Additional or Specialized PPE
-
WORKING AT HEIGHT - Provide Evidence that Project is in compliance with each item
-
Work At Heights Fall protection Hazards are eliminated or have reduced exposure
-
All Fall Hazards have been identified on PRE-TASK form(s) and reviewed with team
-
Anchor Point is in compliance and properly being used
-
Leading Edge Protection in place
-
Swing Radius has been identified and measures are in place
-
Fall Protection & Guarding is in compliance when using Scaffold, Scissor Lifts, Boom Lifts or any other means to work from height
-
Fall Rescue Plans is in Place and has been reviewed with team
-
Ladders & Stairs - Provide Evidence that Project is in compliance with each item
-
Is the Ladders Last Policy being implemented?
-
Appropriate Access Equipment in use and in good Condition
-
Step Ladder(s) are well maintained and in compliance with program
-
Extension Ladders are well maintained and in compliance with program
-
Work above 8' on a ladder has a ladder permit
-
Stairs Use and Conditions
-
All elevations of 19" has the correct proteciton in place
-
Electrical - Provide Evidence that Project is in compliance with each item
-
Pre-Energization Plan has been reviewed with project team
-
GFCI Testing Log validation
-
Temporary Panels are in use and in good condition
-
Extension Cords are in good condition and do not pose an electical hazard to others
-
Temporary Lighting is adequate and in good condition
-
Lockout / Tagout / Tryout
-
Excavations - Provide Evidence that Project is in compliance with each item
-
Competent Person is identified and on project site
-
Cave-In Protection and spoil piles are in compliance
-
Daily Dig Permit is filled out and accurate
-
Excel Spreadsheet for any open execavation over 5 feet
-
Utilities properly identified
-
Scaffold - Provide Evidence that Project is in compliance with each item
-
Competent Person is identified and on project site
-
Scaffold Erection is in good condition (Base, Cross Braces, Planks)
-
Scaffold has proper Guardrail system in place (toe board, mid rail, top rail)
-
Access is free and clear of any obstructions
-
Scaffold Tag is correct and has appropriate inspections marked.
-
General Conditions (Housekeeping, Nothing Hits The Floor) - Provide Evidence that Project is in compliance with each item
-
Cut Stations are are adequate for "NOTHING HITS THE FLOOR" policy
-
Waste Disposal recepticals are adequate for "NOTHING HITS THE FLOOR" policy
-
Elevated Cords/Hoses/Cabels are adequate for "NOTHING HITS THE FLOOR" policy
-
Storage of all Material is adequate for "NOTHING HITS THE FLOOR" policy
-
Loose Debris removal is adequate for "NOTHING HITS THE FLOOR" policy
-
Work Zone and Walk Paths - Provide Evidence that Project is in compliance with each item
-
Unauthorized access is prevented with the correct barricade
-
Walk paths are well maintained and free of obstructions to avoid slips/trips
-
Are areas beneath overhead work areas properly barricaded
-
Equipment - Provide Evidence that Project is in compliance with each item
-
Inspections have been completed
-
Back-up Alarms or similar protection plan in place for backing up equipment
-
Operator Training with Designated Operator Training List posted
-
Company Vehicles How's My Driving Sticker, Cargo Net
-
Hand & Power Tools - Provide Evidence that Project is in compliance with each item
-
Hand & Power Tools are in good Condition
-
Hand & Power Tools have appropriate guards and handles in the correct place
-
Hand / Power Tools when at height are practicing eliminating Falling Objects hazard
-
Correct use and selection of Hand / Power Tools for the job tasks
-
Fire & Hot Work Protection - Provide Evidence that Project is in compliance with each item
-
Flash Screens needed and in use
-
Welding Blankets and Spark Control
-
Combustibles Moved or Protected
-
Following Requirements of Hot Work Permit even if hot work is not in use
-
Extinguishers available and inspected
-
All Fuels are stored and used correctly
-
No quick connects on oxy, acetylene, or inert gas hoses
-
Team/Employees understand Fire Protection Plan, including what to do in the event of a fire?
-
Ergonomics & Lifting Techniques - Provide Evidence that Project is in compliance with each item
-
Are employees using good body mechanics
-
Are employees complying with 50 lb lifting limitation
-
Are employees performing morning and afternoon Stretch and Flex
-
Leading Indicator Management
-
Project/Site is completing BBS as required per Weitz Safety Manual
-
Site Leaders are reviewing BBS observations and communicating to employees
-
Site Leaders are completing Safety Inspections/iAudits
-
Safety Inspections/iAudits are of good quality (Comments, Pictures, Identified At Risks)
-
Review of previous Safety Managers Scored Audit (Validate site has previous report and has corrected concerns)
Audit Review and Comments
-
Comments / Suggestions
-
Project Team Leader Signature
-
Auditor Signature