Contractor Quality Report Form
-
Date:
-
Contract No. FA8903-08-D-8772-0031
-
Title and Location: IMFH Phase 11, Kadena Air Base, Okinawa, Japan
-
Report No.
-
Contractor: Oneida Total Integrated Enterprises (OTIE)
-
AM Weather:
-
PM Weather:
-
TCCOR
- TCCOR 4: Destructive winds of 50 knots or greater are possible within 72 hours.
- TCCOR 3: Destructive winds of 50 knots or greater are possible within 48 hours.
- TCCOR 2: Destructive winds of 50 knots or greater are anticipated within 24 hours.
- TCCOR 1: Destructive winds of 50 knots or greater are anticipated within 12 hours.
- TCCOR 1 Caution: Destructive winds of 50 knots or greater are anticipated within 12 hours. Actual winds are 34-49 knots.
- TCCOR 1 Emergency: Actual winds of 50 knots or greater.
- TCCOR 1 Recovery: Destructive winds of 50 knots are no longer occurring. Actual winds are 34-49 knots.
- Storm Watch: The typhoon is moving away but the base is still feeling some effects. Hazardous conditions may exist due to storm damage. In some cases the storm could return to Okinawa.
- All Clear: Hazardous conditions and winds are no longer present. Return to normal duties. All Clear is announced when all hazards have been cleared.
- None
-
Lightening Warning
Activity Report
-
Contractor: OBAYASHI Corporation
-
Sub Sequence
-
Exterior showing building number / kitchen showing location of sink / misc
-
Sub Sequence
-
Exterior showing building number / kitchen showing location of sink / misc
-
Sub Sequence
-
Exterior showing building number / kitchen showing location of sink / misc
-
Sub Sequence
-
Exterior showing building number / kitchen showing location of sink / misc
-
Contractors Site superintendent
-
Contractors SSHO
-
Utility Outage scheduled today?
- None
- Obayashi Power
- Obayashi Water
- Obayashi Chilled water
- By others Power
- By others Water
- By others Chilled Water
Todays Work
-
Was Trenching/Scaffold/Electric/High Work done?
-
List Safety actions taken today/Safety Inspections conducted
-
Were Safety Requirements met?
-
Equipment Material received today to be incorporated in job
-
Equipment on site today, include number of hours used today
-
Verbal Instructions Received: (List any instructions given by the Government personnel on construction deficiencies, retesting required, etc. with action to be taken)
-
Test Required by plans and/or specifications performed and results of tests
-
List the total number samples collected for the day
-
List the total number samples tested for the day
-
List the total amount of solid waste removed for the day
-
List the total amount of iquid waste removed for the day
Transportation/Disposal Information
-
Quantity
-
ID No.
-
Material
-
Manifest No.
-
Disposal Location
Last Remarks
-
List all Safety Violations observed and corrective actions taken
-
Submittal Actions
-
Remarks
-
Signature