Information

PROJECT INFORMATION

  • Project Name: One Union Station

  • Project Contractor: Kiewit Building Group

  • Document No.

  • Location
  • Erosion Control Supervisor/SWMP Administrator: Tyler Walter

  • Inspector Name, Title

  • CDOT Project Number: EC-2012-076

  • Date of Inspection

  • Current Weather Condition

REASON FOR INSPECTION / EXCLUSION

  • Type of Inspection

  • Amount of precipitation, duration

CURRENT CONSTRUCTION ACTIVITIES

  • Site Activities

  • Estimate of disturbed area at the time of inspection: 1.1 Acres

CONSTRUCTION SITE ASSESSMENT

  • Is there evidence of discharge of sediment or other pollutants from the site?

  • Has sediment or other pollutants discharging from the site reached state waters?

INSPECTION CERTIFICATION

  • I certify this inspection is accurate and completed as required per the permit.

COMPLIANCE CERTIFICATION

  • Corrective actions have been taken, or where a report does not identify any incidents requiring corrective action, the report shall contain a signed statement indicating the site is in compliance with the permit to the best of the signers knowledge and belief.

Inspection Checklist

SWMP MANAGEMENT

  • Is the SWMP notebook located on site?

  • Are changes to the SWMP documents noted and approved?

  • Are the inspection reports retained in the SWMP notebook?

  • Are corrective actions from the last inspection completed?

  • Is a Spill Prevention Control and Countermeasure Plan retained at the project site?

  • Is a list of potential pollutants retained at the site?

BMP's ON SITE AT TIME OF INSPECTION

  • Erosion Control BMP's On Site

  • Seeding

  • Mulching/Mulch Tackifier

  • Soil Binder

  • Soil Retention Blankets

  • Embankment Protector

  • Grading Techniques

  • Berm/Diversion

  • Check Dams

  • Outlet Protection

  • Other

  • Sediment Control BMP'S On Site

  • Stabilized Const. Entrance

  • Sediment Trap

  • Inlet Protection

  • Sediment Basin

  • Perimeter Control

  • Other

  • BMP's For Special Construction

  • Dewatering Structure

  • Temp. Stream Crossing

  • Clear Water Diversion

  • Sensitive Area Fencing

  • Other

  • Materials Handling, Spill Prevention, Waste Management and General Pollution Prevention

  • Stockpile Management

  • Materials Management

  • Concrete Waste Management

  • Saw Water Management

  • Solid Waste/Trash Management

  • Street Sweeping

  • Sanitary Facility

  • Vehicle and Equip. Management

  • Other

VTC 1 (16th Street)

  • Tracking pad in good condition meeting all specs and requirements?

  • Actions Taken, Date, Initials

VTC 2 (@ Triangle Parcel)

  • Tracking pad in good condition meeting all specs and requirements?

  • Actions Taken, Date, Initials

IP 1 (Wynkoop)

  • Is inlet protection working correctly and free of debris or damage?

  • Actions Taken, Date, Initials

IP 2 (16th street south end)

  • Is inlet protection working correctly and free of debris or damage?

  • Actions Taken, Date, Initials

IP 3 (16th street middle)

  • Is inlet protection working correctly and free of debris or damage?

  • Actions Taken, Date, Initials

IP 6 (Triangle Parcel-Wewatta)

  • Are rock socks working properly and free of debris and damage?

  • Actions Taken, Date, Initials

IP 7 (Triangle Parcel-Wewatta)

  • Are rock socks working properly and free of debris and damage?

  • Actions Taken, Date, Initials

RS (Rock Sock @ Wynkoop)

  • Are rock socks working properly and free of debris and damage?

  • Actions Taken, Date, Initials

Eco Pans

  • Are eco pans being maintained properly?

  • Actions Taken, Date, Initials

TGD (Topographic Gradient Differential)

  • Are all gradient slopes working properly and meeting specifications?

  • Actions Taken, Date, Initials

CGD (Curb Grading Differential)

  • Are all curb differentials working properly and meeting specifications?

  • Actions Taken, Date, Initials

SF (Silt Fence @ Triangle Site (inside site))

  • Is perimeter fence working properly and free of damage?

  • Actions Taken, Date, Initials

SF 2 (Silt Fence @ Triangle Site by VTC 2)

  • Is perimeter fence working properly and free of damage?

  • Actions Taken, Date, Initials

Other

  • Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)

  • Actions Taken, Date, Initials

Other

  • Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)

  • Actions Taken, Date, Initials

Other

  • Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)

  • Actions Taken, Date, Initials

Other

  • Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)

  • Actions Taken, Date, Initials

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.