Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pole Number

  • Add location

Working at Heights

  • Fall risk of 1.5m or more?

  • Is edge protected?

Plant and Equipment

  • Unsafe or damaged plant?

  • Incorrect plant / equipment for job?

  • Is flasing light operational?

  • Travel alarms working correctly?

  • Operators trained in safe operation of equipment?

  • Plant is greased and in good working order?

  • Daily pre start checklist is completed?

Hazardous Manual Tasks

  • Hazardous manual tasks are identified and assessed?

  • Are controls adequate?

  • Are operators trained in correct lifting techniques?

Hazardous Chemicals ( including fuel and oil )

  • Are MSDS accessible and current?

  • Are chemicals stored in safe manner?

  • Is the spill containment kit adequate?

  • Are operators trained in spill response?

  • Are fire extinguishers tagged and in date?

Emergency Response

  • Have workers completed Esitrain Energex training program?

  • Are emergency plans for site discussed in pre start?

  • Is the first aid kit fully stocked?

  • Is first aid accessible?

Traffic Management Plans

  • Is there a TMP in place?

  • Are the TMP controls adequate?

  • Are all on site, including visitors, aware of and trained in TMP?

  • Is truck parked in a safe area and barricaded for safety?

Personal Protective Equipment (PPE)

  • Is all PPE being worn or used?

  • Is PPE being used as designed?

  • Is PPE adequate for the task?

  • Are operators trained in the correct use of PPE.

Work Environment

  • Is there sufficient work lighting?

  • Is the work area clean and free of rubbish?

  • Do work tools create trip hazards?

  • Do pedestrians pose a hazard?

Electrical Hazards

  • Are there underground assets in work area?

  • Is there a risk of contact with underground assets?

  • Are there overhead electrical lines?

  • Is the a risk of contact with overhead wires?

  • Is there RCD protection on electrical equipment?

  • Are electrical leads placed on the ground or metal structures?

  • Is electrical equipment being used near water?

  • Is electrical equipment being used near flammables?

  • Are the LOTO procedures adequate?

Environmental Hazards

  • Is there an EMP ( environmental management plan )?

  • Is the adequate dust suppression?

  • Is water being re-used where possible?

Administrative Procedures

  • Does the work request have all required information?

  • Have all permits been obtained?

  • Are all on site inducted?

  • Is there adequate supervisory arrangements?

  • Are there adequate SWMS for the task?

  • Are there systems to review SWMS as required?

  • Is there adequate routine monitoring and auditing?

  • Is the safety portfolio up to date and current with WHS laws?

Quality Assurance

  • Is the correct pole being replaced?

  • Is the excavation completed within the required timeframe?

  • Are all safety procedures and barriers in place?

  • Is the excavation to the required dimensions?

  • Were the public notified about intention to excavate where required?

Corrective Actions

Corrective Action

SIGN OFF

  • P&E Francis Plant Hire

  • P&E Francis Plant Hire

  • P&E Francis Plant Hire

  • Traffic Control

  • Traffic Control

  • Auditors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.