Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Date
-
Job Number
Substrate Conditions and Prep
-
Relative Humidity of Air
-
Air Temperature
-
Substrate moisture reading
-
Estimated square feet of production today
-
Type of work being done today
- Prep
- Prime
- Application of product
-
Lot/Batch number for products being used
-
Measured CSP reading
Crew responsibilities
-
Mixer
-
Applicators
-
Back Rollers
Hours reporting
-
Total job hours
-
Total job hours remaining at the start of the Day
-
Total estimated hours going to be used today
-
Total hours remaining at the end of the day