Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Drawings
-
Do you have a sealed drawing on site for this pour ?
Hi Load Scaffold
-
Are all frames, braces and spacing installed by the sealed drawing ?
-
Are all frames visually plumb ?
-
Are all X braces installed on shoring frames ?
-
Are all heads and baseplates attached to screw jack with hitch pins and rivets ?
-
Are screw jacks within allowable extension as shown on drawing ?
-
Are all shoring frames resting properly on a baseplate ?
-
Are baseplates on ramps in full contact with slab or have wedges installed ?
-
Is lateral bracing installed as shown on drawings ?
Beam Stringers & Joist
-
Are stringer sizes and lengths as shown on the sealed drawings ?
-
Are stringers secured in heads ?
-
Are the joist used on the beam bottoms the same as shown on the sealed drawing ?
-
Are the joist spacings and spans as shown on the sealed drawings ?
Engineered Trusses
-
Is the trust spacing correct by the sealed drawing ?
-
Have trusses been inspected for damage ? ( cracks and loose nail plates etc.)
-
Are all trusses supported in the correct location ? (Under the correct nail plate)
-
Are all additional shores installed ?(if required)
Reshoring
-
Are reshores installed on all levels required ?
-
Are reshores visual plumb ?
-
Do reshores have spring clips installed ?
-
Have reshores on lower floors been rechecked ?
-
Are all reshore pins completely inserted and is the reshore snug to slab ?
-
Have all floors below reached required strength to support slab load ?
-
Are all reshores at perimeter of the building secured to prevent tipping ?
Subgrade
-
Is slab on grade in place ?
-
If no slab on grade is in place is sub grade compaction sufficient to support leg load ?
-
Are mud sills centered under shore and in full contact with subgrade ?
-
Are mud sills installed by the sealed drawing ?
-