Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Superintendent

General

  • Discuss utility locations & inverts ( have surveyor verify if necessary)

  • Utility timing set by utility company or developer.

  • Have plans been submitted to utility companies?

SITE WORK

  • Add media

  • Review Change Orders

  • Review Change Order Requirements

  • Review Submittal Requirements

  • Are the latest drawings on site?

  • Make sure we have filed Notice of Intent (NOI)

  • Strom Water Pollution Prevention Plan

  • Review Schedule for Owner Furnished Items

  • Does City Require Fixtures Set Prior to CO

  • Review Project Schedule

  • Review Grades

  • Entrance drives (truck traffic radius)

  • Parking Bays/Handicap Parking & Fire Lane

  • Review Dumpster Enclosure layout if required

  • Grade - changes in reality vs. plans. Grade changes from building to walks. Drainage, handicap ramps.

  • Match adjacent grades at perimeter of site

  • Sidewalk layout, finishes and bollards - do civil and landscape prints match?

  • Building layout verified by surveyor

  • Review concrete expansion/control joint layout

  • Confirm entry and exit forms set up correctly

  • Signage - pylon, monument, banners, coming soon, permits required, power layout, controls, use of existing signage.

  • If developer is performing work on site meet subs to discuss coordination and schedule. Will it impact our turnover?

  • Review soils report, Is Rock going to be an issue?

  • Site lighting designed locations vs. existing conditions

  • Who controls site lighting?

  • Downspouts tied into storm vs. sheet drain

  • Verify if pump is required for truck dock

  • Discuss landscape sleeve location

  • Discuss hiring trailer and power locations

  • Review landlord stipulations; staging, etc.

  • Verify all permits, liquor license and have all permits been forwarded to owner?

SLAB INSPECTION

  • Add media

  • How many days from the start of construction?

  • Are we on schedule?

  • Job start check list complete two weeks from start of Job

  • Check plumbing drains and vents are in proper location.

  • Check to see that the drain are set at the proper elevation.

  • Check to see that the floor sinks are blocked out at proper location. (Floor sinks are to be set before tile).

  • Verify that drains and sinks are wrapped and protected properly.

  • Check elevation and proper placement of foundation on site. Did engineer set building corners/elevation?

  • Check hose bibs are in exterior walls.

  • Check to see that roof drains are installed in the slab when required.

  • Check electrical stub outs are in proper location.

  • Check electrical and plumbing has correct concrete coverage in slab and do not inhibit structural integrity

  • of slab or beams.

  • Verify all hold down clips and anchor bolts are in place.

  • Check rebar is on chairs.

  • Verify all rebar connections are properly lapped. Validate spacing from plans and specifications.

  • Check all grade beam steel is off the ground 2Ó on bottom and each side.

  • Check to make sure all forms are square and plumb and offsets are correct dimension.

  • Check form braces are adequate to hold forms in correct position.

  • Check brick ledges and door leave outs are proper dimensions.

  • Verify Superintendent understands proper floor finish.

  • Check to see the test lab is set up to take slump test and cylinder samples.

  • Verify that plumber and electrician will be at slab pour to protect work during pour.

  • Check to see submittal approved for concrete being used.

SITE INSPECTION

  • Add media

  • Insure compaction test have been taken on slab?

  • What is the status of primary electrical service?

  • What is the status of the secondary electrical service?

  • What is the status of electric to light poles?

  • When are the site lights going to be set?

  • Do light poles meet landlord's approval?

  • What is the status of electric to ownerÕs sign?

  • What is the status of the gas?

  • What is the status of water site lines?

  • What is the status of water connections?

  • What is the status of sewer site lines?

  • What is the status of sewer connections?

  • Are we using property other than owners to store dirt, access, install utilities, or set our trailer?

  • If yes, communicate to Real Estate Manager and gain permission immediately.

  • Confirm forms are set correctly at entry and exit doors

STRUCTURAL INSPECTION

  • Add media

  • One to two weeks after framing completion or prior to drywall.

  • Steel or Truss package installed according to plans and specifications

  • Are top baring trusses spaced properly with less than 1-1/4Ó gap between the vertical-connecting truss

  • to the baring toe to the wall it is baring on?

  • Are all bolts in glue lams, pipe columns, and hold-downs? All connections bolted? All welds per plan?

  • Dry pack under columns complete?

  • Is all lateral bracing in bar joist or trusses installed properly? Straight

  • Verify all shear walls are installed properly with correct nailing pattern?

  • Wall to Steel connections per design? (Verify proper nailing pattern in plywood, proper grade of lumber being

  • used, decking has proper connections.)

  • Walls plumb and square?

  • Is blocking installed for toilet partitions, sinks, grab bars, tables, other owner provided equipment?

  • Structural framing, truss, glue lam inspection, layout baring, bolts, cat walks, shear walls.

  • E.I.F.S inspection, back wrapped at bottom of walls, penetrations and doubled wrapped at corners and edges

  • Plumbing rough inspection?

  • Fire sprinkler rough inspection? Pressure test?

  • Electrical rough inspection?

  • Fire alarm rough inspection?

BUILDING

  • Add media

  • Protect window and door glass from scratches through opening day.

  • Protect water lines and vents from inadvertent nail/screw punctures

  • Stucco inspection, back wrapped at bottom of walls, penetrations and doubled wrapped at corners and edges

  • Confirm that finish materials have been installed at returns at door frames.

  • Confirm expansion joints are installed vertically and horizontally.

  • Confirm that fire, alarm, HVAC controls are installed at locations shown on drawings. Review plans with electrician.

  • Hold all conduit against bottom of deck.

  • Review detail for handicap sign at restroom doors.

  • Confirm ADA checklist has been completed

  • Review hardware connections for security gates. Screws come loose at top hinge

MECHANICAL ROOM

  • Add media

  • Protect window and door glass from scratches through opening day.

  • Confirm FRP is installed

OFFICE

  • Confirm location of safe. Trim out with 1X4

  • Add media

PLUMBING

  • Protect water lines and vents from inadvertent nail/screw punctures

ELECTRICAL

  • Add media

  • Coordinate with security and fire protection.

  • Are pull strings in place for POS

  • Confirm that electronic sensors are being installed in lieu of light switches

Roof inspection one week in to trim work.

  • Add media

  • Mechanical fasteners properly installed?

  • Correct specification on roofing materials?

  • Curbs flashed properly? Parapet to wall flashed properly?

  • Flashing screwed down and flashed properly?

  • Trim package properly installed?

  • Miter cuts even and smooth?

  • Wood sanded properly prior to installation?

  • Proper selection of materials?

  • Safety Checklist completed?

Paint/Texture

  • Add media

  • Is the wall texture uniform? It should be a medium orange peel finish per plan.

Prior to receiving equipment

  • Add media

  • Exterior finishes installed properly? Stucco. sand finish colors per plans?

  • Brick, brick ties, plumb/level with no bellies, proper structural lintels, and vertical joints look vertical?

  • HVAC duct properly rapped and sealed? No Flex duct for long runs! (Used only last 6')

  • Correct hangers on plumbing, mechanical, and electrical?

  • Safety Checklist completed? Ceiling Closed?

Receiving Kitchen Equipment

  • Add media

  • Kitchen equipment inventory per list. (small wares forwarded to warehouse)

  • Marlin panels

  • POS, phone, security, & sound wiring.

  • Ceiling Tile installed

  • Caulk wall angle

  • Tile finished and cleaned

  • All FRP and Stainless Steel installed and cleaned

  • Caulk base tile

  • All electrical outlets trimmed

  • Walk-in boxes complete and clean.

  • All office furniture and shelving in place

  • Fire Sprinkler System Complete

Turnover

  • Finals

  • Electrical

  • Any paperwork submitted to agency

  • Plumbing

  • Any paperwork submitted to agency

  • HVAC

  • Any paperwork submitted to agency

  • Health

  • Any paperwork submitted to agency

  • Any paperwork submitted to agency

  • Any paperwork submitted to agency

  • Landscaping

  • Any paperwork submitted to agency

  • Utility

  • Any paperwork submitted to agency

  • Plan/Zoning

  • Any paperwork submitted to agency

  • Fire

  • Any paperwork submitted to agency

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.