Information

  • Location.
  • Client Name.

  • Contact Details.

  • Tenure.

  • Scheme type.

  • Survey conducted by.

  • Conducted on

Building & Heating Information:

  • Construction age of the building.

  • Property Type.

  • Number of Bedrooms.

  • Floor Construction Type

  • Please take a photo of the front door

  • Please take a photo of the Electric and Gas meters where applicable.

  • Main Heating type

  • Photo of appliance name/make/model/rating plate.

  • Location of appliance ie Airing cupboard, Utility etc

  • Location of the flue, please take a photo.

  • Secondary heat source, please take a photo.

  • Secondary Heat source type.

  • Please state appliance, fuel type, flue type, location of appliance, size of appliance and ventilation requirements

  • Location of Appliance ie Airing Cupboard, Utility Etc.

  • Location of Chimney if present. Make note of which room in notes

  • Location of Combustion vent if present. Make note of which rooms in notes

  • Will the CWI installation work result in the unsafe operation of a combustion appliance e.g. Flue, Chimney

  • Take Photos internally and externally of the vent

Cavity Survey Information

  • Total Area of property

  • Total area to be insulated.

  • What is the extent of the cavity to be fill?

  • Required material.

  • Average Cavity Depth.

  • Total area to be omitted.

  • Photos of omitted areas.

  • Does the building have any air vents.

  • If yes please select.

  • Do any of the air vents require sleeving or sealing up before installing the cavities.

  • Please select the type of ventilation present, including extraction ventilation and trickle vents.

  • Please take a photo of all background vents and extraction fans fitted within the property including at least two photos of window trickle vents.

  • Adjoining properties insulated ?

  • Number of Cavity brushes required.

  • Core vent required.

  • Number of core vents and location.

Front Elevation

  • Do you wish to complete Front Elevation Measurements

  • Total Area (a)

  • Area to be omitted (b)

  • Area to be installed (a-b)

  • Photo of elevation

  • Please take a photo of all gutters or down pipes on this elevation.

  • Cavity Depth

  • Take Photo showing tape in cavity showing depth

  • Photo of Borescope in wall

  • Borescope Photos.

  • Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope

  • Is Internal drilling required, if yes provide notes and photos of the area

  • Comments

Rear Elevation

  • Do you wish to complete Rear Elevation Measurements

  • Total Area (a)

  • Area to be omitted (b)

  • Area to be installed (a-b)

  • Photo of elevation

  • Please take a photo of all gutters or down pipes on this elevation.

  • Cavity Depth

  • Take Photo showing tape in cavity showing depth

  • Photo of Borescope in wall

  • Borescope Photos.

  • Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope

  • Is Internal drilling required, if yes provide notes and photos of the area

  • Comments

Right Hand Elevation

  • Do you wish to complete Right Hand Elevation Measurements

  • Total Area (a)

  • Area to be omitted (b)

  • Area to be installed (a-b)

  • Photo of elevation

  • Please take a photo of all gutters or down pipes on this elevation.

  • Cavity Depth

  • Take Photo showing tape in cavity showing depth

  • Photo of Borescope in wall

  • Borescope Photos.

  • Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope

  • Is Internal drilling required, if yes provide notes and photos of the area

  • Comments

Left hand elevation

  • Do you wish to complete Left Hand Elevation Measurements

  • Total Area (a)

  • Area to be omitted (b)

  • Area to be installed (a-b)

  • Photo of elevation

  • Please take a photo of all gutters or down pipes on this elevation.

  • Cavity Depth

  • Take Photo showing tape in cavity showing depth

  • Photo of Borescope in wall

  • Borescope Photos.

  • Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope

  • Is Internal drilling required, if yes provide notes and photos of the area

  • Comments

Building extensions

  • Do you wish to complete Extension Measurements

  • Total area (a)

  • Area to be omitted (b)

  • Area to be installed (a-b)

  • Photo of elevation

  • Please take a photo of all gutters or down pipes on this elevation.

  • Cavity Depth

  • Take Photo showing tape in cavity showing depth

  • Boroscope Photos.

  • Please take a photo of the DPC externally, if covered and not visible take an internal photo using Borescope

  • Is Internal drilling required, if yes provide notes and photos of the area

  • Comments

Construction details and Condition:

  • Building Finish plus photos of all the elevations of the property.

  • Type & Condition of the Building structure suitable for the work to commence? (If Ventilation required then choose NO)

  • External Condition of the building.

  • Is the property suitable to receive the insulation type specified?(Construction type, Exposer, Condition of Structure)

  • Please take photo’s of plants or Ivy attached to property, please note these will need to be removed if they are attached to the building.

  • Have you informed the client that the plants or Ivy will need to be removed.

  • Have you done an internal inspection of the building? If yes please take photos of your findings.

  • If you have answered yes please select the best description of your findings.

  • Safety monitors present.

  • Protected species or rodents present in building.

  • Special Instructions.

Access

  • On site parking.

  • Client Instructions.

  • Will the site layout or condition impair the execution of the work?

  • Access Equipment Required.

  • If scaffolding required will it be supplied by the customer?

Cavity Wall Insulation

Additional Photos

  • Loft Hatch

  • Left Gable Wall from inside loft

  • Right Gable Wall From inside Loft

  • Party Wall from inside Loft

  • Photo of wall being measured windows (show both ends of tape) Must be able to see measurement clearly

  • Close up brick pattern & mortar joints

PAS Questions

  • Will the CWI installation work result in non compliance with building regulations e.g. Workmanship, Materials

  • Will the CWI installation work result in compromise to the functionality of the existing ventilation ducts/systems

  • Will the CWI installation work result in compromise to the functionality and/or safety of the existing services

  • Will the CWI installation work result in the installation that is Non-compliant materials suppliers requirements

  • Property drilled to establish clear cavity width

  • All areas NOT to be insulated are agreed with the customer

  • Any areas to be insulated vie the internal leaf agreed with the customer

  • Is there any potential for moisture build upas a result of the installation?

  • Will the functionality and/or safety of installed services (gas,electricity,water, telecommunications etc.) be affected in any way as a result of the installation?

  • Is there any potential risk in relation to the ongoing performance of the installed services?

  • From the findings of the survey, is the installation able to be carried out in line with the full design specification

  • From the finding of the survey, is the method statement suitable and complete?

  • Does the customer understand the nature and extent of the work?

  • Have they been made aware of any disruption that may be caused (for example rubbish disposal and the siting of skips)

Dynamic Risk Assessment for Cavity Wall Insulation

  • Use of a ladder/step ladder.

  • Noise.

  • Vibration.

  • Manual Handing.

  • Hand Tools/Power Tools

  • Compressed air.

  • Electricity/Generator

  • House keeping/site tidiness.

  • Working with with wet cement,concrete or mortar.

  • Overhead cables.

  • Reversing a vehicle.

  • Asbestos.

  • Use of a Mobile tower/MEWP

  • Lone Worker.

Signature

  • Surveyor Please Sign Here

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.