Information
-
Location.
-
Client Name.
-
Contact Details.
-
Tenure.
- Owner occupier
- Local Authority
- Housing Association
- Privately Rented
- Eco measure
-
Scheme type.
- Owner occupier
- Local Authority
- Housing Association
- Privately Rented
- Eco measure
-
Survey conducted by.
-
Conducted on
-
Building & Heating Information:
-
Construction age of the building.
-
Property Type.
- Mid-Terrace
- End terrace
- Semi-detached
- Detached
- Ground Floor Flat
- Middle Floor Flat
- Top Floor Flat
- Masonette
- Bungalow
- House
- Commercial Building
-
Number of Bedrooms.
- 1
- 2
- 3
- 4
- 5+
- N/A Commercial
-
Floor Construction Type
- Solid
- Suspended
- Suspended not wood
- Other
-
Please take a photo of the front door
-
Please take a photo of the Electric and Gas meters where applicable.
-
Main Heating type
-
Photo of appliance name/make/model/rating plate.
-
Location of appliance ie Airing cupboard, Utility etc
-
Location of the flue, please take a photo.
-
Secondary heat source, please take a photo.
-
Secondary Heat source type.
- Gas Fire with Flue
- Gas Fire with chimney
- Gas Fire Flush Fitted
- Open Fire with internal chimney
- Open Fire with external chimney
- Wood Burner
- No other heating present
-
Please state appliance, fuel type, flue type, location of appliance, size of appliance and ventilation requirements
-
Location of Appliance ie Airing Cupboard, Utility Etc.
-
Location of Chimney if present. Make note of which room in notes
-
Location of Combustion vent if present. Make note of which rooms in notes
-
Will the CWI installation work result in the unsafe operation of a combustion appliance e.g. Flue, Chimney
-
Take Photos internally and externally of the vent
Cavity Survey Information
-
-
Total Area of property
-
Total area to be insulated.
-
What is the extent of the cavity to be fill?
-
Required material.
- Thermabead Carbon Saver
-
Average Cavity Depth.
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Total area to be omitted.
-
Photos of omitted areas.
-
Does the building have any air vents.
- Yes
- No
-
If yes please select.
- Underfloor vents
- Kitchen vents
- Bedroom vents
- Bathroom vents
- Combustion vent
- Extraction fan kitchen
- Extraction fan bathroom
- Pantry vents
- Window trickle vents
-
Do any of the air vents require sleeving or sealing up before installing the cavities.
-
Please select the type of ventilation present, including extraction ventilation and trickle vents.
-
Please take a photo of all background vents and extraction fans fitted within the property including at least two photos of window trickle vents.
- Underfloor vents
- Kitchen vents
- Bedroom vents
- Bathroom vents
- Combustion vent
- Extraction fan kitchen
- Extraction fan bathroom
- Pantry vents
- Window trickle vents
-
Adjoining properties insulated ?
-
Number of Cavity brushes required.
-
Core vent required.
-
Number of core vents and location.
Front Elevation
-
Do you wish to complete Front Elevation Measurements
-
Total Area (a)
-
Area to be omitted (b)
-
Area to be installed (a-b)
-
Photo of elevation
-
Please take a photo of all gutters or down pipes on this elevation.
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Take Photo showing tape in cavity showing depth
-
Photo of Borescope in wall
-
Borescope Photos.
-
Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope
-
Is Internal drilling required, if yes provide notes and photos of the area
-
Comments
Rear Elevation
-
Do you wish to complete Rear Elevation Measurements
-
Total Area (a)
-
Area to be omitted (b)
-
Area to be installed (a-b)
-
Photo of elevation
-
Please take a photo of all gutters or down pipes on this elevation.
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Take Photo showing tape in cavity showing depth
-
Photo of Borescope in wall
-
Borescope Photos.
-
Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope
-
Is Internal drilling required, if yes provide notes and photos of the area
-
Comments
Right Hand Elevation
-
Do you wish to complete Right Hand Elevation Measurements
-
Total Area (a)
-
Area to be omitted (b)
-
Area to be installed (a-b)
-
Photo of elevation
-
Please take a photo of all gutters or down pipes on this elevation.
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Take Photo showing tape in cavity showing depth
-
Photo of Borescope in wall
-
Borescope Photos.
-
Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope
-
Is Internal drilling required, if yes provide notes and photos of the area
-
Comments
Left hand elevation
-
Do you wish to complete Left Hand Elevation Measurements
-
Total Area (a)
-
Area to be omitted (b)
-
Area to be installed (a-b)
-
Photo of elevation
-
Please take a photo of all gutters or down pipes on this elevation.
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Take Photo showing tape in cavity showing depth
-
Photo of Borescope in wall
-
Borescope Photos.
-
Please take a photo of the DPC, if not visible from outside take an internal photo using Borescope
-
Is Internal drilling required, if yes provide notes and photos of the area
-
Comments
Building extensions
-
Do you wish to complete Extension Measurements
-
Total area (a)
-
Area to be omitted (b)
-
Area to be installed (a-b)
-
Photo of elevation
-
Please take a photo of all gutters or down pipes on this elevation.
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Take Photo showing tape in cavity showing depth
-
Boroscope Photos.
-
Please take a photo of the DPC externally, if covered and not visible take an internal photo using Borescope
-
Is Internal drilling required, if yes provide notes and photos of the area
-
Comments
Construction details and Condition:
-
Building Finish plus photos of all the elevations of the property.
-
Type & Condition of the Building structure suitable for the work to commence? (If Ventilation required then choose NO)
-
External Condition of the building.
- Very good
- Good
- Poor
- Very poor
-
Is the property suitable to receive the insulation type specified?(Construction type, Exposer, Condition of Structure)
-
Please take photo’s of plants or Ivy attached to property, please note these will need to be removed if they are attached to the building.
-
Have you informed the client that the plants or Ivy will need to be removed.
-
Have you done an internal inspection of the building? If yes please take photos of your findings.
-
If you have answered yes please select the best description of your findings.
- Low level damp near the skirting boards
- Black mould in the corners of the rooms
- Black mould on the ceiling and the walls
- Condensation on the windows and external walls
- No internal issues that I can see.
-
Safety monitors present.
- Smoke Alarm
- Fire Alarm
- CO2 Alarm
-
Protected species or rodents present in building.
-
Special Instructions.
Access
-
On site parking.
-
Client Instructions.
-
Will the site layout or condition impair the execution of the work?
-
Access Equipment Required.
- None
- Ladders
- Scaffold Board for Flat Roof
- Scaffolding
- Conservatory Ladder
- Roof Ladder
-
If scaffolding required will it be supplied by the customer?
-
Cavity Wall Insulation
Additional Photos
-
Loft Hatch
-
Left Gable Wall from inside loft
-
Right Gable Wall From inside Loft
-
Party Wall from inside Loft
-
Photo of wall being measured windows (show both ends of tape) Must be able to see measurement clearly
-
Close up brick pattern & mortar joints
PAS Questions
-
Will the CWI installation work result in non compliance with building regulations e.g. Workmanship, Materials
-
Will the CWI installation work result in compromise to the functionality of the existing ventilation ducts/systems
-
Will the CWI installation work result in compromise to the functionality and/or safety of the existing services
-
Will the CWI installation work result in the installation that is Non-compliant materials suppliers requirements
-
Property drilled to establish clear cavity width
-
All areas NOT to be insulated are agreed with the customer
-
Any areas to be insulated vie the internal leaf agreed with the customer
-
Is there any potential for moisture build upas a result of the installation?
-
Will the functionality and/or safety of installed services (gas,electricity,water, telecommunications etc.) be affected in any way as a result of the installation?
-
Is there any potential risk in relation to the ongoing performance of the installed services?
-
From the findings of the survey, is the installation able to be carried out in line with the full design specification
-
From the finding of the survey, is the method statement suitable and complete?
-
Does the customer understand the nature and extent of the work?
-
Have they been made aware of any disruption that may be caused (for example rubbish disposal and the siting of skips)
Dynamic Risk Assessment for Cavity Wall Insulation
-
Use of a ladder/step ladder.
-
Noise.
-
Vibration.
-
Manual Handing.
-
Hand Tools/Power Tools
-
Compressed air.
-
Electricity/Generator
-
House keeping/site tidiness.
-
Working with with wet cement,concrete or mortar.
-
Overhead cables.
-
Reversing a vehicle.
-
Asbestos.
-
Use of a Mobile tower/MEWP
-
Lone Worker.
-
Signature
-
Surveyor Please Sign Here