Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Site Inspection
-
Has this site's previous inspection been reviewed?
-
Is the job site easily accessible?
Job Posting & Information
-
Federal and state labor law postings hung in common areas?
-
Emergency contact information posted in common areas?
-
Utility numbers posted for both public and private utilities?
-
OSHA 300 posted in common area when applicable?<br>
-
Job site safety manual on site?
-
MSDS or SDS sheets available upon request for every chemical on site?
Job Hazard Assessment
-
Job Hazard Assessment completed and signed by all employees on jobsite?
-
Job Hazard Assessment addresses and mitigates hazards?
First Aid & Fire Protection
-
Emergency signs posted with numbers and project address?
-
Driving directions posted from project to nearest clinic and emergency room?
-
Trained personnel on site?
-
First aid kits/cabinets clearly labeled?
-
Employees aware of location of first aid kit/cabinet?
-
Is there easy access to the first aid kit/cabinet?
-
First aid kits available per number of employees and working levels of project?
-
First aid kits and contents clean and orderly?
-
No contents past their expiry date?
-
Evacuation plan displayed or understood by all employees?
-
Evacuation procedure discussed regularly? (3-4 times a year)
-
Extinguishers clear of obstructions and easily accessible?
-
Extinguishers in place and clearly marked for type of fire?
-
Extinguisher recently serviced? (Checked 6 month punch mark on tag)
-
Extinguisher is full with pin in place?
-
Exit doors clear of obstructions?
-
Exit doors easily opened from the inside?
-
Adequate direction notices for fire exits?
Personal Protective Equipment (PPE)
-
Appropriate clothing worn? (Shirt with sleeves & long pants)
-
Hard hat?
-
Safety glasses with side shields?
-
Gloves?
-
Safety toed shoes?
-
Metatarsal guards where applicable.
-
Hi visibility where applicable.
-
Other job site specific PPE?
-
Hearing protection worn where applicable?
-
Respiratory equipment used where applicable?
Traffic Control
-
Appropriate signage in place to inform drivers?
-
Barricades provided and used?
-
High visibility vest or coats in use?
-
Vehicles running flashers or strobes while in, entering, and/or leaving construction zone?
Electrical
-
Proper lighting provided in work areas?
-
GFCI protection provided on temporary outlets and wet locations?
-
GFCI temporary outlet weekly inspections completed?
-
GFCI on all drop cords?
-
Electrical cords are for "hard" or " extra hard" use?
-
Electrical cords and tools free from damage?
-
No strained electrical cords? (Stretched or pinched)
-
No broken plugs, sockets, or switches?
-
No overloaded circuits or outlets?
-
Temporary power panels with romex wire are guarded up to 8 foot?
-
Energized electrical panels are guarded?
-
Electrical panels and rooms secured?
-
Monthly electrical outlet checks performed on all panels and documented?
-
Assured grounding checks performed quarterly?
-
Lights hung properly?
-
Light bulbs protected from breakage?
Arc Flash Kit
-
Rubber insulated gloves opened?
-
Correct size, cal rating, & in good condition?
-
Within test date?
-
Leather protectors correct size and in good condition?
-
Hard hat, face shield, & chin cup intact and in good condition?
-
Balaclava in good condition?
-
Smock correct size, cal rating, and in good condition?
-
Ear plugs available in AFK?
-
Additional garments in bag (FR hi vis vest & 100% cotton undergarment)?
Lockout Tagout
-
All machines at a zero energy state while being worked on?
-
Appropriate PPE (Level 2 or Level 4 arc flash gear) worn if working on live equipment?
-
All locks on devices accompanied by tags with name and number to contact employee?
-
All employees working on locked and tagged equipment have personal locks on the job lock box?
Tools (hand, power, torching, welding, specialty)
-
Proper training documented for employees working with power, powder, and pneumatic tools?<br>
-
Damaged tools tagged and removed from service?
-
Tools with calibration dates not expired?
-
Double insulated tools properly checked?
-
All guards in place and in working order?
-
Air & hydronic lines properly secured with whip checks?
-
Fire extinguishers are in hot work areas?
-
Fire watch provided at hot work areas until 30 minutes after work has been completed?
-
Cylinders stored in upright, capped, and secured in place?
-
Welding screens in place at work station?
-
Welding leads, torch handles, gauges, hoses, flash back arrester in working order?
General Job Site Fall Protection
-
All working levels, 6-feet or greater are protected by OSHA approved guard rails?
-
Appropriate warning lines are placed on roofs and/or other leading edge work?
-
Holes properly covered, secured, and marked?
-
Toe-boards in use in areas where material could become displaced or fall?
-
Ladder ways protected by gates or offsets?
Personal Fall Protection
-
Fall protection daily inspection completed?
-
Employee wearing harness correctly?
-
Fall protection systems in place where needed?
-
Employees tied off when required?<br>
Ladders and Scaffolding
-
Extension ladder extending 36 inches past landing point?
-
Ladders set up at proper angle, 4:1 ratio?<br>
-
Top two steps of ladder not occupied or being worked off of?<br>
-
Ladder bases have slip resistant feet attached?<br>
-
Ladders fully opened and/ or secured to prevent tipping?<br>
-
Damaged equipment tagged and removed from service?
-
Scaffolded tagged and inspected daily by competent person?<br>
-
Proper access provided to avoid climbing of scaffold frames?<br>
-
Working surfaces and areas at access points are clear of debris?
-
Working levels are secured from falls including toe-boards?
-
Scaffold is plumb, level, and square with completely decked working surfaces?
Aerial Lifts
-
Employees operating lifts have been trained?
-
Annual inspections completed?
-
Shift inspections completed
-
All aerial lifts on sight are in good working order or have been tagged out for service?
Fork Lifts
-
Employees operating fork lifts have been properly trained?
-
Shift inspections completed?
-
Fork lifts are in good working order or have been tagged out for service?
Other Equipment
-
Employees operating other equipment on job site have been properly trained on the equipment?
-
Equipment has all required insections?
-
Equipment is in good working order or has been tagged out for service?
Material Storage/Removal and Housekeeping
-
LP gas stored outside?<br>
-
LP gas cylinders secured upright?<br>
-
Fire extinguishers available in flammable areas?
-
Flammable storage areas labeled "no smoking"?
-
Flammables stored in approved cabinets?
-
Proper lifting techniques used by employees?<br>
-
Chutes used or material removal area properly barricaded.
-
Items stored based of fire characteristics?<br>
-
Hazardous accumulation sites available?
-
Appropriate number of restroom facilities per number of employees?
-
Water/slip hazards marked, barricaded, or cleaned up?
-
Spills cleaned up?<br>
-
Material neatly stacked and stored?<br>
-
Storage areas, isles, and walkways clear?<br>
-
No trash receptacles are not overflowing and in need of being removed from building?
Post Site Inspection
-
Foreman or employee in charge notified of site deficiencies?
-
No outstanding safety issues from previous inspections?
-
All imminent dangers corrected while still on site and noted?
-
General notified on any unsafe job site conditions?
Post Inspection Review & Sign Off
-
Sight foreman/supervisor
-
Person completing the audit