Title Page
-
Prepared by
-
Payzone Personnel on Location
-
Job Number
-
Asset Number
-
Customer
-
Lease Name:
-
<br>Lines are Straight and Not in a Bind<br>
-
Plugs or Valves in Tees
-
All Unions are Tight
-
Support for Lines
-
Tank Busters are Secure
-
Flowline Restraints in Place
-
Valve Handles are in Proper Position
-
Valves Operate Correctly
-
Whip Checks in Place
-
Hoses are Ran Neatly
-
Wind Socks in Place
-
Manifold is Level
-
Manifold Clamps are Tight
-
Hydraulic Fluid Level Checked
-
Diesel Level Generator/Closing Unit Air Compressor
-
Ground Rods in Place
-
Choke Indicators are Zeroed
-
Transducers Pumped Up and Zeroed
-
Pressure Gauges are Checked
-
Tank level Monitors Zeroed
-
Spare Choke Trim
-
Spare Seal Rings
-
Spare Positive Chokes
-
Spare Choke Trim
-
Spare Hydraulic Hoses
-
Spare Gauge Cables
-
Spare Tank Monitor Cables
-
Spare Pressure Gauges
-
Completion of inspection