Information

  • Site Inspection Title:

  • Report Serial Number:

  • Subcontractor:

  • Principal Contractor:

  • Conducted On:

  • Report Prepared By:

  • Site Address:

SCOPE OF WORKS

  • The following works are currently in progress:

PREVIOUS SITE INSPECTION

  • Has the site received a previous site inspection?

  • Have all none compliances been rectified?

INCIDENTS

  • Is this relevant to the audit?

  • Does the subcontractor have an incident reporting procedure in place, and are management & operatives aware of it?

  • Is there an accident / incident log book available on site? If not, is there a digital system in place?

  • Have any incidents or near misses occured since the last site audit?

  • Has the PC been notified of the incident?

  • Has an incident investigation and report been carried out?

  • Has the subcontractor notified the HSE of RIDDOR (if applicable) ?

PRINCIPAL CONTRACTOR REQUIREMENTS

  • Is this relevant to the audit?

  • Is the appropriate documentation in place (F10, Site Rules, H&S Law Poster, First Aiders, Local Hospitals details, Employers Liability Insurance, etc)?

  • Are the welfare facilities suitable (Toilets, hot and cold water, canteen, heating food and water)

  • Has safe access & egress been provided to the point of works?

  • Have suitable arrangements been made for Fire & Emergencies?<br><br>- Are there adequate fire escape routes, and are they signed and kept clear?<br>- Is there an Emergency Evacuation Plan in place and on display, are operatives aware of it, does it take account of existing systems?<br>- Is there a suitable means of raising the alarm and is it audible in all parts of the site?<br>- Has an appropriate muster point been designated, clearly signed and are workers aware of it's location? <br>- Is emergency lighting provided, with battery back up, where required?<br>- Are appropriate and sufficient site fire extinguishers available?

  • Has the PC provided sufficient edge protection for all leading edges as per the Working at Height Regulations?

  • Are there sufficient controls in place for people and plant segregation?

MANAGEMENT, COMMUNICATION & INDUCTIONS

COMMUNICATION

  • Is this relevant to the audit?

  • Are tool box talks carried out on a weekly basis with evidence recorded?

  • Are daily safe start briefings carried out and recorded?

MANAGEMENT

  • Is this relevant to the audit?

  • Are work activities being coordinated and managed safely?

  • Is there sufficient management & supervision on site?

  • Do the managers & supervisors hold the relevant CSCS & SMSTS/SSSTS certificates?

  • Is there a qualified fire marshal?

  • Is there a qualified first aider?

  • Does the Site Manager/Supervisor hold Asbestos Awareness (if required)?

  • Has the manager carried out and documented site safety inspections, as per their H&S Policy / PC Requirements?

INDUCTIONS

  • Is this relevant to the audit?

  • Are inductions carried out, and is there evidence of completed inductions being recorded?

  • Are operatives certificates & CSCS cards checked and documented to ensure they are competent for their role?

  • Is the information, emergency procedures and risks delivered in the Induction specific to the project and recorded?

  • Are they approved and signed by the PC as per the PC's H&S Policy ?

LOGISTICS

HOUSEKEEPING

  • Is this relevant to the audit?<br>

  • Do operatives comply with designated storage areas for plant, materials, waste and flammable substances?

  • Are walkways and primary escape routes clear of stored and waste materials?

  • Have materials been stored securely to prevent objects from falling?

  • Are working areas left reasonably clean & tidy?

  • Is there good management of trailing cables? i.e hung at height, secured with sky hooks

WASTE

  • Is this relevant to the audit?

  • Do subcontractors comply with their responsibility to clear and remove waste from their work areas?

  • Are waste collections frequent enough to prevent a build up of waste materials?

METHOD STATEMENTS & RISK ASSESSMENTS

  • Is this relevant to the audit?

  • Is there an on-site method statement that is site specific, suitable and sufficient, and covers the subcontractor's full scope of works?

  • Are RAMS communicated to operatives and countersigned as confirmation of being understood?

  • Are the risk assessments current, suitable and sufficient?

  • Are they approved and signed by the PC as per the PC's H&S Policy ?

PERMITS TO WORK

  • Is this relevant to the audit?

  • Have activities requiring PTW been identified, signed off by the correct AP, and copies retained on site?

  • Have permits been obtained by operatives as per the procedure when carrying out the works?

HOT WORKS

  • Is this relevant to the audit?

  • Is a Hot Work Permit in place and is there evidence that it is being signed off and closed out as per site procedures?

  • Is there a minimum of x2 suitable fire extinguishers to hand where hot works are being carried out?

  • Is ignition of nearby combustible surfaces prevented?

OCCUPATIONAL HEALTH

COSHH

  • Is this relevant to the audit?

  • Is there a COSHH register, and have all harmful substances been identified on site?

  • Are hazardous substances stored as per their COSHH risk assessments?

  • Have the correct controls for safe use been adhered to by operatives as per their COSHH risk assessment?

  • Have sufficient COSHH Assessments been completed for all substances being used?

  • Are Material Safety Data Sheets available on site?

NOISE

  • Is this relevant to the audit?

  • Have noisy operations with a risk of exposure above 80dB been identified in a noise risk assessment?

  • Has the correct levels of hearing protection been provided to those exposed to noisy activities, and is this captured within the RA?

  • Are sufficient controls in place to eliminate or reduce the output of noisy works?

  • Are operatives adhering to the controls set out in their RAMS?

HAVS

  • Is this relevant to the audit?

  • Have operations involving hazardous levels of vibration been identified within a risk assessment?

  • Are appropriate control measures implemented where operatives are likely to exceed their daily EAV & EAL exposure limits?

  • If required, are operatives recording their daily exposure times?

PERSONAL PROTECTIVE EQUIPMENT

  • Is this relevant to the audit?

  • Are all site personnel compliant with the site required PPE?

  • Has suitable PPE been provided for activities being carried out? Is the PPE being worn fit for purpose?

  • Is PPE in good condition?

LOW LEVEL WORK AT HEIGHT EQUIPMENT/MOBILE TOWERS

  • Is this relevant to the audit?

  • Is low level access equipment inspected weekly (Hop ups, podiums, step ladders, ladders)?

  • Is the selected low level access equipment right for the task?

  • Are they in good condition?

  • Are mobile scaffold towers erected correctly and by a competent PASMA trained person?

POWERED ACCESS EQUIPMENT (MEWPS)

  • Is this relevant to the audit?

  • Are equipment operators trained and competent?

  • Is the equipment stable and on level ground

  • Does the MEWP have a valid LOLER 6 month certificate?

  • Does the MEWP have a copy of the manufacturers manual available on the machine?

  • Are operators recording pre-use inspection checks?

  • Has a risk assessment been completed for MEWPS, and considerations made for anti crush controls where necessary?

  • Is there a rescue plan in place, and are the operatives aware of it?

  • Are the emergency release controls free from obstruction whilst in use?

LIFTING OPERATIONS AND LIFTING EQUIPMENT

  • Is this relevant to the audit?

  • Is there an up to date LOLER register held on site and evidence of weekly inspections being recorded?

  • Is there a lift plan in place, and is it relevant to the current scope of works?

  • Are loads being slung / lifted as per their lift plan?

  • Are operators recording pre-use inspection checks?

  • Does the lifting equipment have current LOLER inspection / test certificates?

  • Are Crane Operators & Slingers competent?

PUWER

  • Is this relevant to the audit?

  • Do PUWER registers account for all plant and equipment on site, and is there evidence of inspection records?

  • Is plant and equipment being used safely?

  • Is there the appropriate test certification for hired and fixed plant and equipment held on site?

  • Are operators recording pre-use inspection checks?

SCAFFOLDING

  • Does the scaffolding fall under the responsibility of the PC?

  • Is scaffold inspected / tagged every 7 days, with written reports held on site?

  • Is there safe access?

  • Are standards upright and on a firm foundation?<br>Are standards / ledgers / braces / struts in correct position?

  • Are appropriate guard rails and toe boards in place? <br>If required, are brick guards / debris netting / debris fans installed and suitable?

  • Are scaffold design drawings provided where applicable

  • Are platforms clean and free from debris?<br>Are materials evenly distributed?

  • Are platforms fully boarded?

  • Does the scaffolding fall under the responsibility of the Subcontractor?

  • Is scaffold inspected / tagged every 7 days, with written reports held on site?

  • Is there safe access?

  • Are standards upright and on a firm foundation?<br>Are standards / ledgers / braces / struts in correct position?

  • Are appropriate guard rails and toe boards in place? <br>If required, are brick guards / debris netting / debris fans installed and suitable?

  • Are scaffold design drawings provided where applicable

  • Are platforms clean and free from debris?<br>Are materials evenly distributed?

  • Are platforms fully boarded?

ELECTRICAL SAFETY

  • Is this relevant to the audit?

  • Is there a Lock out Tag out or permit system in place?

  • Is the supply a maximum of 110V?

  • Are trip devices / RCDs used where mains voltage is used?

  • Are cables and leads in good condition?

  • Does electrical equipment on site have a current Portable Appliance Test in place?

TEMPORARY WORKS

  • Is this relevant to the audit?

  • Do the temporary works appear to be in a safe condition, public protected and unauthorised access prevented?

  • Is there an appointed and competent Temporary Works Coordinator?

  • Are structural engineer drawings available for all temporary works?

  • Is there a Temporary Works Register, and does it account for all temporary works on the project?

  • Have Temporary Works Inspections been carried out and recorded? i.e scaffolding, hoarding, acrow props.

  • Do all temporary access and protective coverings have safe working loads? i.e Access ramps, AOV coverings, riser coverings, temporary loading platforms.

EXCAVATIONS

  • Is this relevant to the audit?

  • Permit to dig is issued by the PC?

  • Utilities plans obtained and checked (issued within 90 days of permit)?

  • Is the location, type and status of services marked out on service plans?

  • Utility service providers have been contacted and made aware of the proposed works near any live services?

  • Live services made dead where possibl.?

  • Work area surveyed by a competent person, using CAT & genny and trail holes to confirm the exact location of underground services?

  • Location of services have been clearly identified using spray paint or markers?

  • Supervisor of the excavation is competent in the principles of safe digging and/or avoidance of underground services?

  • Excavation soil type, size, ground water table level and surrounding water features has been reviewed by an engineer to confirm Excavation Support temporary works design?

  • Sufficient edge protection and access into the excavation is in place before works commence?

  • Rescue and emergency procedures are in place? i.e Gas Monitors, rescue winch, breathing apparatus

  • Excavation inspections are carried out & recorded daily AND after extreme weather changes?

ASBESTOS MANAGEMENT

  • Is this relevant to the audit?

  • Is an asbestos survey report avaialble?

  • Is a management procedure in place?

  • Is this covered in the site induction?

  • Are all operatives at risk of exposure certified with Asbestos Awareness Training?

PERFORMANCE BEYOND COMPLIANCE

  • Are there any examples of best practice and good health and safety management?

Report Summary

Report Summary

  • Auditor Name

  • Auditor Additional Comments

  • Subcontractor's Site Representative

  • The Subcontractor's Site representative is responsible for resolving non-compliances identified in this report. To close out raised actions, they must provide and upload evidence using the automated links sent to their email via the Safety Culture reporting software.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.