Title Page
-
Date & Time of inspection:
-
Location:
- 17TH
- London
- Orleans
- Other
-
Pump Truck Size:
-
Structure:
-
Concrete washouts for ready mix trucks and pump trucks in location?
-
Environmental measures in place for pump truck & washouts?
-
Ready mix trucks have room to back up to pump truck / washouts & turn around?
-
Plan B is in place if pump truck breaks down?
-
PUMP TRUCK COMPONENTS:
-
Safety pins are installed in all clamps?
-
Truck visually inspected for leaks (I.E Oil & Hydraulic)?
-
Safety lanyards are installed on all working connections?
-
Tremie hose is the correct size and type for pour (if in use)?
-
Boom inspected for damage, missing clamps,ice,dirt,concrete, and falling debris?
-
Outriggers are fully extended?
-
Outriggers welds inspected for cracks?
-
Outrigger pads are on firm level ground?
-
Coordination:
-
Pump operator have reviewed and signed JHA?
-
Pump operators are aware of the sup't & crew safety expectations?
-
Boom radius has been checked? No interference with nearby cranes or power lines?
-
Plan has been communicated with other crews in area?
-
Plan addresses the safety of the public and 3rd parties?
-
Pictures
-
Inspector