Peak Downs Mine Drill Supervisor Shift Log
-
Supervisor
-
Crew
-
-
Start Time
Supervisor Shift Log
Shift Attributes - People & Manning
-
Total Employees on Shift Roster:
-
Total Employees on Annual Leave:
-
Total Employees on Long Service Leave:
-
Total Employees on Carers/Sick Leave:
-
Total Employees on Un-authorised Leave:
-
Were there any crew / HR related issues dealt with this shift?
-
Detail:
-
Were there any Just Culture processes followed this shift?
-
Detail:
-
Was training conducted this shift?
-
Details of training conducted:
-
Planning for Manning/Crew Movement Comments:
Shift Log Checklist Items
-
REMINDERS: Ensure drill consumables are stocked, SWI & MSDS folders are up to date & all 1SAP notifications are entered.
Safety Obligations
-
Prestart meeting subjects covered:
-
Were there any incidents on shift?
-
Has investigation commenced, been entered into 1SAP, and one-pager Event Report been emailed out?
-
Pos comms: Observed being used correctly?
-
Location and Details of 2 LVs for Seat belt check & 4WD engaged in operational areas:
Exposed Edge Confirmation
-
Has the removal of a bund occurred on shift?
-
Has the removal of a bund been confirmed by an operator? (Must be via pos comms to supervisor / OCE)
-
Time & Location:
-
Has the reinstalled bund been confirmed by the operator? (Must be via pos comms to supervisor / OCE)
-
Has the supervisor / OCE checked the reinstalled bund for compliance?
-
If the bund has not been reinstalled before the end of shift, has the action been passed to the oncoming supervisor?
Critical Control Verification Tasks - Operational
-
Operational Separation: Is 50m separation distance between travelling vehicles adhered to? (Except when overtaking where permitted)
-
AMA Compliance: Are positive communications observed prior to LV/MV or Service Trucks entering an AMA?
-
Minesite Traffic Control: Is Minesite traffic signage and driving to conditions being adhered to?
Critical Controls for Design & Maintenance
-
Berms: Comprised of competent material to stop the largest vehicle on circuit?
-
Access: Are the drill pattern accesses appropriate?
-
Access: Do completed patterns have restricted access?
Light Vehicle Comments
-
DRILL 1:
-
DRILL 2:
-
DRILL 3:
-
DRILL 4:
-
DRILL 5:
-
DRILL MOBILE:
-
11-30:
All Drills - General
All Drills
-
Current design files uploaded to Fleet Management System?
-
Operators have a paper copy of the current plan?
-
Is there enough drilling for the next 48 hrs?
-
Detail next area
-
Has bench been cleared of rubbish?
Drill Prep & Bench Handover
-
Were drill benches handed over this shift?
-
Location:
-
By Department:
Shift Handover Notes to Next Supervisor
EDD75
EDD75 Inspection
-
Was EDD75 inspected?
-
Location:
-
SHIFT ISSUES:
-
Are the following items compliant:
-
Call Up Signs In Place
-
LV Park Up set up correctly?
-
Adequate Drainage in Place
-
Has every hole been tagged?
-
Hole ID checked for touch coal:
-
Hole ID dipped for quality control (3 minimum):
-
Additional Hazards Identified/Rectified:
EDD97
EDD97 Inspection
-
Was EDD97 inspected?
-
Location:
-
SHIFT ISSUES:
-
Are the following items compliant:
-
Call Up Signs In Place
-
LV Park Up set up correctly?
-
Adequate Drainage in Place
-
Has every hole been tagged?
-
Hole ID checked for touch coal:
-
Hole ID dipped for quality control (3 minimum):
-
Additional Hazards Identified/Rectified:
EDD98
EDD98 Inspection
-
Was EDD98 inspected?
-
Location:
-
SHIFT ISSUES:
-
Are the following items compliant:
-
Call Up Signs In Place
-
LV Park Up set up correctly?
-
Adequate Drainage in Place
-
Has every hole been tagged?
-
Hole ID checked for touch coal:
-
Hole ID dipped for quality control (3 minimum):
-
Additional Hazards Identified/Rectified:
EDD100
EDD100 Inspection
-
Was EDD100 inspected?
-
Location:
-
SHIFT ISSUES:
-
Are the following items compliant:
-
Call Up Signs In Place
-
LV Park Up set up correctly?
-
Adequate Drainage in Place
-
Has every hole been tagged?
-
Hole ID checked for touch coal:
-
Hole ID dipped for quality control (3 minimum):
-
Additional Hazards Identified/Rectified:
DR166
DR166 Inspection
-
Was DR166 inspected?
-
Location:
-
SHIFT ISSUES:
-
Are the following items compliant:
-
Call Up Signs In Place
-
LV Park Up set up correctly?
-
Adequate Drainage in Place
-
Has every hole been tagged?
-
Hole ID checked for touch coal:
-
Hole ID dipped for quality control (3 minimum):
-
Additional Hazards Identified/Rectified:
DR168
DR168 Inspection
-
Was DR168 inspected?
-
Location:
-
SHIFT ISSUES:
-
Are the following items compliant:
-
Call Up Signs In Place
-
LV Park Up set up correctly?
-
Adequate Drainage in Place
-
Has every hole been tagged?
-
Hole ID checked for touch coal:
-
Hole ID dipped for quality control (3 minimum):
-
Additional Hazards Identified/Rectified:
Sign Off
-
Signed Off:
-
Finish Time: