Information

  • Peak Downs Mine Drill Supervisor Shift Log

  • Supervisor

  • Crew

  • Start Time

Supervisor Shift Log

Shift Attributes - People & Manning

  • Total Employees on Shift Roster:

  • Total Employees on Annual Leave:

  • Total Employees on Long Service Leave:

  • Total Employees on Carers/Sick Leave:

  • Total Employees on Un-authorised Leave:

  • Were there any crew / HR related issues dealt with this shift?

  • Detail:

  • Were there any Just Culture processes followed this shift?

  • Detail:

  • Was training conducted this shift?

  • Details of training conducted:

  • Planning for Manning/Crew Movement Comments:

  • undefined

Shift Log Checklist Items

  • REMINDERS: Ensure drill consumables are stocked, SWI & MSDS folders are up to date & all 1SAP notifications are entered.

Safety Obligations

  • Prestart meeting subjects covered:

  • Were there any incidents on shift?

  • Has investigation commenced, been entered into 1SAP, and one-pager Event Report been emailed out?

  • Pos comms: Observed being used correctly?

  • Location and Details of 2 LVs for Seat belt check & 4WD engaged in operational areas:

Exposed Edge Confirmation

  • Has the removal of a bund occurred on shift?

  • Has the removal of a bund been confirmed by an operator? (Must be via pos comms to supervisor / OCE)

  • Time & Location:

  • Has the reinstalled bund been confirmed by the operator? (Must be via pos comms to supervisor / OCE)

  • Has the supervisor / OCE checked the reinstalled bund for compliance?

  • If the bund has not been reinstalled before the end of shift, has the action been passed to the oncoming supervisor?

Critical Control Verification Tasks - Operational

  • Operational Separation: Is 50m separation distance between travelling vehicles adhered to? (Except when overtaking where permitted)

  • AMA Compliance: Are positive communications observed prior to LV/MV or Service Trucks entering an AMA?

  • Minesite Traffic Control: Is Minesite traffic signage and driving to conditions being adhered to?

Critical Controls for Design & Maintenance

  • Berms: Comprised of competent material to stop the largest vehicle on circuit?

  • Access: Are the drill pattern accesses appropriate?

  • Access: Do completed patterns have restricted access?

Light Vehicle Comments

  • DRILL 1:

  • DRILL 2:

  • DRILL 3:

  • DRILL 4:

  • DRILL 5:

  • DRILL MOBILE:

  • 11-30:

All Drills - General

All Drills

  • Current design files uploaded to Fleet Management System?

  • Operators have a paper copy of the current plan?

  • Is there enough drilling for the next 48 hrs?

  • Detail next area

  • Has bench been cleared of rubbish?

Drill Prep & Bench Handover

  • Were drill benches handed over this shift?

  • Location:

  • By Department:

Shift Handover Notes to Next Supervisor

EDD75

EDD75 Inspection

  • Was EDD75 inspected?

  • Location:

  • SHIFT ISSUES:

  • Are the following items compliant:

  • Call Up Signs In Place

  • LV Park Up set up correctly?

  • Adequate Drainage in Place

  • Has every hole been tagged?

  • Hole ID checked for touch coal:

  • Hole ID dipped for quality control (3 minimum):

  • Additional Hazards Identified/Rectified:

EDD97

EDD97 Inspection

  • Was EDD97 inspected?

  • Location:

  • SHIFT ISSUES:

  • Are the following items compliant:

  • Call Up Signs In Place

  • LV Park Up set up correctly?

  • Adequate Drainage in Place

  • Has every hole been tagged?

  • Hole ID checked for touch coal:

  • Hole ID dipped for quality control (3 minimum):

  • Additional Hazards Identified/Rectified:

EDD98

EDD98 Inspection

  • Was EDD98 inspected?

  • Location:

  • SHIFT ISSUES:

  • Are the following items compliant:

  • Call Up Signs In Place

  • LV Park Up set up correctly?

  • Adequate Drainage in Place

  • Has every hole been tagged?

  • Hole ID checked for touch coal:

  • Hole ID dipped for quality control (3 minimum):

  • Additional Hazards Identified/Rectified:

EDD100

EDD100 Inspection

  • Was EDD100 inspected?

  • Location:

  • SHIFT ISSUES:

  • Are the following items compliant:

  • Call Up Signs In Place

  • LV Park Up set up correctly?

  • Adequate Drainage in Place

  • Has every hole been tagged?

  • Hole ID checked for touch coal:

  • Hole ID dipped for quality control (3 minimum):

  • Additional Hazards Identified/Rectified:

DR166

DR166 Inspection

  • Was DR166 inspected?

  • Location:

  • SHIFT ISSUES:

  • Are the following items compliant:

  • Call Up Signs In Place

  • LV Park Up set up correctly?

  • Adequate Drainage in Place

  • Has every hole been tagged?

  • Hole ID checked for touch coal:

  • Hole ID dipped for quality control (3 minimum):

  • Additional Hazards Identified/Rectified:

DR168

DR168 Inspection

  • Was DR168 inspected?

  • Location:

  • SHIFT ISSUES:

  • Are the following items compliant:

  • Call Up Signs In Place

  • LV Park Up set up correctly?

  • Adequate Drainage in Place

  • Has every hole been tagged?

  • Hole ID checked for touch coal:

  • Hole ID dipped for quality control (3 minimum):

  • Additional Hazards Identified/Rectified:

Sign Off

  • Signed Off:

  • Finish Time:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.