Title Page
-
Conducted on
-
Prepared by
-
Location
-
To attend site to install power for Peak Till Podia. Electrical checks of Earth Continuity and Polarity must be carried out.
-
Store
-
Job Number
-
Time On Site
-
Time Off Site
-
Earth Continuity Reading (Ohms)
-
Has Correct Polarity been confirmed?
-
Have you had to used a Kettle lead supplied by ABM?
-
Any Pictures to be added
-
Any further information/notes to be made
-
Engineer
-
Store