Page 1: Initial questions

  • Conducted on

  • Prepared by

  • Location
  • PN

Page 2: Main checklist

  • Are the ducts laid with correct depth of cover

  • Are ducts laid on compacted 50mm bed of sand

  • Is there a minimum of 75mm sand covering the duct with marker tape on top

  • Are the correct number of ducts in the trench as per design

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.