Title Page
-
Project title
-
Earthworks reference number
-
Location of work
-
Type of earthwork
-
Date
-
I hereby submit this form for clearance prior to proceeding to dig or borehole / trial pit
-
To attach photo on the the daily checklist
Daily SHE compliances
Daily pre-start prior to SHE requirements
Monday
-
Date
-
Type of activites
- Hacking / Road cutting
- Trial trench
- Manual trial pit
- Manual hand auger
- Soil drilling
- Standard penetrations test
- Thin wall
- Mazier sampling
- Rock coring
- In situ test
- Grouting
- Instrument installation
- Cone penetrations test
- General housekeeping
-
Conduct daily JSA / toolbox meeting? (photo of the TBM form)
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest? (photo of workers in full PPE)
-
Working area fitted with rigid barricades & warning signs? (photo of barricaded work area)
-
All personnel are competent / qualified in the work activity (photo of CSOC, BCSS, RES & Operator certificate)
-
Method of statement, risk assessment & safe work procedure available on site (photo of documents)
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks? (photo of mechanical equipment used)
-
Equipment inspected & maintained (daily / periodic / 3rd party)? (photo of LM cert, LG cert, Monthly maintenance report & Daily checklist by operator)
-
Ground inspections made after every rainstorm or other hazard-increasing<br>occurrence. (photo of equipment & excavated area)
-
Notification of other affected parties undertaken? (photo of letter/email approval)
-
Person In-charge
-
Verified by SHE personnel
Tuesday
-
Date
-
Type of activites
- Hacking / Road cutting
- Trial trench
- Manual trial pit
- Manual hand auger
- Soil drilling
- Standard penetrations test
- Thin wall
- Mazier sampling
- Rock coring
- In situ test
- Grouting
- Instrument installation
- Cone penetrations test
- General housekeeping
-
Conduct daily JSA / toolbox meeting? (photo of the TBM form)
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest? (photo of workers in full PPE)
-
Working area fitted with rigid barricades & warning signs? (photo of barricaded work area)
-
All personnel are competent / qualified in the work activity (photo of CSOC, BCSS, RES & Operator certificate)
-
Method of statement, risk assessment & safe work procedure available on site (photo of documents)
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks? (photo of mechanical equipment used)
-
Equipment inspected & maintained (daily / periodic / 3rd party)? (photo of LM cert, LG cert, Monthly maintenance report & Daily checklist by operator)
-
Ground inspections made after every rainstorm or other hazard-increasing<br>occurrence. (photo of equipment & excavated area)
-
Notification of other affected parties undertaken? (photo of letter/email approval)
-
Person In-charge
-
Verified by SHE personnel
Wednesday
-
Date
-
Type of activites
- Hacking / Road cutting
- Trial trench
- Manual trial pit
- Manual hand auger
- Soil drilling
- Standard penetrations test
- Thin wall
- Mazier sampling
- Rock coring
- In situ test
- Grouting
- Instrument installation
- Cone penetrations test
- General housekeeping
-
Conduct daily JSA / toolbox meeting? (photo of the TBM form)
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest? (photo of workers in full PPE)
-
Working area fitted with rigid barricades & warning signs? (photo of barricaded work area)
-
All personnel are competent / qualified in the work activity (photo of CSOC, BCSS, RES & Operator certificate)
-
Method of statement, risk assessment & safe work procedure available on site (photo of documents)
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks? (photo of mechanical equipment used)
-
Equipment inspected & maintained (daily / periodic / 3rd party)? (photo of LM cert, LG cert, Monthly maintenance report & Daily checklist by operator)
-
Ground inspections made after every rainstorm or other hazard-increasing<br>occurrence. (photo of equipment & excavated area)
-
Notification of other affected parties undertaken? (photo of letter/email approval)
-
Person In-charge
-
Verified by SHE personnel
Thursday
-
Date
-
Type of activites
- Hacking / Road cutting
- Trial trench
- Manual trial pit
- Manual hand auger
- Soil drilling
- Standard penetrations test
- Thin wall
- Mazier sampling
- Rock coring
- In situ test
- Grouting
- Instrument installation
- Cone penetrations test
- General housekeeping
-
Conduct daily JSA / toolbox meeting? (photo of the TBM form)
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest? (photo of workers in full PPE)
-
Working area fitted with rigid barricades & warning signs? (photo of barricaded work area)
-
All personnel are competent / qualified in the work activity (photo of CSOC, BCSS, RES & Operator certificate)
-
Method of statement, risk assessment & safe work procedure available on site (photo of documents)
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks? (photo of mechanical equipment used)
-
Equipment inspected & maintained (daily / periodic / 3rd party)? (photo of LM cert, LG cert, Monthly maintenance report & Daily checklist by operator)
-
Ground inspections made after every rainstorm or other hazard-increasing<br>occurrence. (photo of equipment & excavated area)
-
Notification of other affected parties undertaken? (photo of letter/email approval)
-
Person In-charge
-
Verified by SHE personnel
Friday
-
Date
-
Type of activites
- Hacking / Road cutting
- Trial trench
- Manual trial pit
- Manual hand auger
- Soil drilling
- Standard penetrations test
- Thin wall
- Mazier sampling
- Rock coring
- In situ test
- Grouting
- Instrument installation
- Cone penetrations test
- General housekeeping
-
Conduct daily JSA / toolbox meeting? (photo of the TBM form)
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest? (photo of workers in full PPE)
-
Working area fitted with rigid barricades & warning signs? (photo of barricaded work area)
-
All personnel are competent / qualified in the work activity (photo of CSOC, BCSS, RES & Operator certificate)
-
Method of statement, risk assessment & safe work procedure available on site (photo of documents)
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks? (photo of mechanical equipment used)
-
Equipment inspected & maintained (daily / periodic / 3rd party)? (photo of LM cert, LG cert, Monthly maintenance report & Daily checklist by operator)
-
Ground inspections made after every rainstorm or other hazard-increasing<br>occurrence. (photo of equipment & excavated area)
-
Notification of other affected parties undertaken? (photo of letter/email approval)
-
Person In-charge
-
Verified by SHE personnel
Saturday
-
Date
-
Type of activities
- Hacking / Road cutting
- Trial trench
- Manual trial pit
- Manual hand auger
- Soil drilling
- Standard penetrations test
- Thin wall
- Mazier sampling
- Rock coring
- In situ test
- Grouting
- Instrument installation
- Cone penetrations test
- General housekeeping
-
Conduct daily JSA / toolbox meeting? (photo of the TBM form)
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest? (photo of workers in full PPE)
-
Working area fitted with rigid barricades & warning signs? (photo of barricaded work area)
-
All personnel are competent / qualified in the work activity (photo of CSOC, BCSS, RES & Operator certificate)
-
Method of statement, risk assessment & safe work procedure available on site (photo of documents)
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks? (photo of mechanical equipment used)
-
Equipment inspected & maintained (daily / periodic / 3rd party)? (photo of LM cert, LG cert, Monthly maintenance report & Daily checklist by operator)
-
Ground inspections made after every rainstorm or other hazard-increasing<br>occurrence. (photo of equipment & excavated area)
-
Notification of other affected parties undertaken? (photo of letter/email approval)
-
Person In-charge
-
Verified by SHE personnel
Sunday
-
Date
-
Type of activites
- Hacking / Road cutting
- Trial trench
- Manual trial pit
- Manual hand auger
- Soil drilling
- Standard penetrations test
- Thin wall
- Mazier sampling
- Rock coring
- In situ test
- Grouting
- Instrument installation
- Cone penetrations test
- General housekeeping
-
Conduct daily JSA / toolbox meeting? (photo of the TBM form)
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest? (photo of workers in full PPE)
-
Working area fitted with rigid barricades & warning signs? (photo of barricaded work area)
-
All personnel are competent / qualified in the work activity (photo of CSOC, BCSS, RES & Operator certificate)
-
Method of statement, risk assessment & safe work procedure available on site (photo of documents)
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks? (photo of mechanical equipment used)
-
Equipment inspected & maintained (daily / periodic / 3rd party)? (photo of LM cert, LG cert, Monthly maintenance report & Daily checklist by operator)
-
Ground inspections made after every rainstorm or other hazard-increasing<br>occurrence. (photo of equipment & excavated area)
-
Notification of other affected parties undertaken? (photo of letter/email approval)
-
Person In-charge
-
Verified by SHE personnel
Endorsement of PTW
SECTION 1: APPLICATION BY PERMIT APPLICANT
-
I will commit to be in line with the safety requirements mentioned in the checklist & will not deflect any of them
-
Name
-
Remarks
SECTION 2: EVALUATION BY PROJECT COORDINATOR
-
I have evaluated the hazards and risks associated with the nature of works carried out and all reasonably practicable measures have been taken to ensure the safety and health of the persons who will be carrying out works in the worksite
-
Name
-
Remarks
SECTION 3: APPROVAL BY PROJECT MANAGER / FIELD MANAGER / OPERATIONS MANAGER
-
I am fully satisfied that a thorough inspection and proper assessment of the above have been done by Applicant & Project Coordinator so that works can be carried out safely. I hereby approve the work to commence
-
Name
-
Remarks
SECTION 4: REVIEWED BY SHE DEPARTMENT
-
I am fully satisfied that safety measures are in place and according to procedure by the project team
-
Name
-
Remarks
SECTION 5: NOTIFICATION OF COMPLETION/REVOCATION OF PERMIT TO WORK
-
Permit status
-
Name
-
Reinstate the affected work area for the completion of this earthworks
-
Remarks
Utility services, temporary occupation license clearances & verifications
Compliance to requirements for utility service agencies & other bodies prior to the work activity
-
Project Title
-
Earthworks reference number
-
Photo of utilities drawing to attached for all affected services
NCD
-
NCD Date
Utilities Drawing
SPPG
SPPG High Pressure (gas)
-
Distant & direction of service
SPPG Medium Pressure (gas)
-
Distant & direction of service
SPPG Low Pressure (gas)
-
Distant & direction of service
SPPG Low Voltage (cable)
-
Distant & direction of service
SPPG High Voltage (cable)
-
Distant & direction of service
SPPG Extra High Voltage (cable)
-
Distant & direction of service
SPPG WIP(cable)
-
Distant & direction of service
NCE
-
Approval
PUB
Water line
-
Distant & direction of service
Sewwer line
-
Distant & direction of service
DTSS
-
Distant & direction of service
POWS
-
Approval
Telecommunication Services
Singtel
-
Distant & direction of service
-
NCE
Starhub
-
Distant & direction of service
-
NCE
M1
-
Distant & direction of service
-
NCE
SP Telecom
-
Distant & direction of service
-
NCE
Netlink
-
Distant & direction of service
-
NCE
TATA
-
Distant & direction of service
-
NCE
Reach
-
Distant & direction of service
-
NCE
Superloop
-
Distant & direction of service
-
NCE
Verizon
-
Distant & direction of service
-
NCE
Orange
-
Distant & direction of service
-
NCE
Telecom Italia Sparkle
-
Distant & direction of service
-
NCE
Angora
-
Distant & direction of service
-
NCE
Others
Others 01
-
Service name
-
Distant & direction of service
-
NCE
Others 02
-
Service name
-
Distant & direction of service
-
NCE
Others 03
-
Service name
-
Distant & direction of service
-
NCE
Clearances / Temporary Occupation License
-
LTA / DBC
-
SLA
-
N Parks
-
Town Council
-
HDB
-
URA
-
JTC
-
NEA
-
PUB
-
PSA
-
MPA
-
Others:
Verifications by project team
SECTION 1: SUBMITTED BY PERMIT APPLICANT
-
I confirm the following locations for earthworks have been studied & checked based on existing utility services drawings & cable detection report
-
Name
-
Remarks
SECTION 2: VERIFIED BY PROJECT COORDINATOR
-
I have verified & ensure all necessary precautions must be taken to safeguard & avoid any damages to utilities services
-
Name
-
Remarks
SECTION 3: REVIEWED BY PROJECT MANAGER / FIELD MANAGER / OPERATIONS MANAGER
-
I am fully satisfied that a thorough check had been done & all regulatory approvals for the earthworks are in place.
-
Name
-
Remarks
SECTION 4: REVIEWED BY SHE DEPARTMENT
-
I am fully satisfied, project teams are doing their duties with due diligence to avoid any damages to utilities & approval to relevant parties
-
Name
-
Remarks