Title Page
-
Project title
-
Location Of Work & Borehole Reference Number:
-
Type of earthwork
-
Date
-
I hereby submit this form for clearance prior to proceeding to dig or borehole / trial pit
Utility services, temporary occupation license clearances & SHE requirements
Compliance to requirements for utility service agencies & other bodies prior to the work activity
-
Project Title :
-
Location Of Work & Borehole Reference Number:
-
NCD Date:
-
Project Coordinator:
Utilities Drawing
SPPG
-
SPPG High Pressure (gas)
-
SPPG Medium Pressure (gas)
-
SPPG Low Pressure (gas)
-
SPPG Low Voltage (cable)
-
SPPG High Voltage (cable)
-
SPPG Extra High Voltage (cable)
-
SPPG WIP (cable)
PUB
-
Water line
-
Sewer line
-
DTSS
Telecommunication Services
-
Singtel
-
Star hub
-
M1
-
SP Telecom
-
Netlink
-
TATA
-
REACH
-
Superloop
-
Verizon
-
Orange
-
Telecom Italia Sparkle
-
Agora
-
Others
Clearances / Temporary Occupation License
-
LTA / DBC
-
SLA
-
N Parks
-
Town Council
-
HDB
-
URA
-
JTC
-
NEA
-
PUB
-
PSA
-
MPA
-
Others:
Daily pre-start prior to SHE requirements
Day 1
-
Date
-
Conduct daily JSA / toolbox meeting?
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest?
-
Working area fitted with rigid barricades & warning signs?
-
All personnel are competent / qualified in the work activity
-
Workers understand the sequence of work, safe work procedure & emergency procedures
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks?
-
Equipment inspected & maintained (daily / periodic / 3rd party)?
-
Relevant documents on site? (NCD, NCE, TOL)
-
Notification of other affected parties undertaken?
-
Person In-charge
Day 2
-
Date
-
Conduct daily JSA / toolbox meeting?
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest?
-
Working area fitted with rigid barricades & warning signs?
-
All personnel are competent / qualified in the work activity
-
Workers understand the sequence of work, safe work procedure & emergency procedures
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks?
-
Equipment inspected & maintained (daily / periodic / 3rd party)?
-
Relevant documents on site? (NCD, NCE, TOL)
-
Notification of other affected parties undertaken?
-
Person In-charge
Day 3
-
Date
-
Conduct daily JSA / toolbox meeting?
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest?
-
Working area fitted with rigid barricades & warning signs?
-
All personnel are competent / qualified in the work activity
-
Workers understand the sequence of work, safe work procedure & emergency procedures
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks?
-
Equipment inspected & maintained (daily / periodic / 3rd party)?
-
Relevant documents on site? (NCD, NCE, TOL)
-
Notification of other affected parties undertaken?
-
Person In-charge
Day 4
-
Date
-
Conduct daily JSA / toolbox meeting?
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest?
-
Working area fitted with rigid barricades & warning signs?
-
All personnel are competent / qualified in the work activity
-
Workers understand the sequence of work, safe work procedure & emergency procedures
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks?
-
Equipment inspected & maintained (daily / periodic / 3rd party)?
-
Relevant documents on site? (NCD, NCE, TOL)
-
Notification of other affected parties undertaken?
-
Person In-charge
Day 5
-
Date
-
Conduct daily JSA / toolbox meeting?
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest?
-
Working area fitted with rigid barricades & warning signs?
-
All personnel are competent / qualified in the work activity
-
Workers understand the sequence of work, safe work procedure & emergency procedures
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks?
-
Equipment inspected & maintained (daily / periodic / 3rd party)?
-
Relevant documents on site? (NCD, NCE, TOL)
-
Notification of other affected parties undertaken?
-
Person In-charge
Day 6
-
Date
-
Conduct daily JSA / toolbox meeting?
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest?
-
Working area fitted with rigid barricades & warning signs?
-
All personnel are competent / qualified in the work activity
-
Workers understand the sequence of work, safe work procedure & emergency procedures
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks?
-
Equipment inspected & maintained (daily / periodic / 3rd party)?
-
Relevant documents on site? (NCD, NCE, TOL)
-
Notification of other affected parties undertaken?
-
Person In-charge
Day 7
-
Date
-
Conduct daily JSA / toolbox meeting?
-
Worker in full PPE: Safety Shoes, Safety Helmet & Vest?
-
Working area fitted with rigid barricades & warning signs?
-
All personnel are competent / qualified in the work activity
-
Workers understand the sequence of work, safe work procedure & emergency procedures
-
Means of communication between drilling team established
-
Any mechanical equipment used for the earthworks?
-
Equipment inspected & maintained (daily / periodic / 3rd party)?
-
Relevant documents on site? (NCD, NCE, TOL)
-
Notification of other affected parties undertaken?
-
Person In-charge
Endorsement of PTW
SECTION 1: APPLICATION BY PERMIT APPLICANT
-
Following locations for digging / boring have been studied, based on existing utility services drawing(s) available, cable detection & area is safe to work
-
Name
-
Remarks
SECTION 2: EVALUATION BY PROJECT COORDINATOR
-
I have evaluated the hazards and risks associated with the nature of works carried out and all reasonably practicable measures have been taken to ensure the safety and health of the persons who will be carrying out works in the worksite
-
Name
-
Remarks
SECTION 3: APPROVAL BY PROJECT MANAGER / FIELD MANAGER / OPERATIONS MANAGER
-
I am fully satisfied that a thorough inspection and proper assessment of the above have been done by Applicant & Project Coordinator so that works can be carried out safely. I hereby approve the work to commence
-
Name
-
Remarks
SECTION 4: REVIEWED BY SHE DEPARTMENT
-
I am fully satisfied that safety measures are in place and according to procedure by the project team
-
Name
-
Remarks
SECTION 5: NOTIFICATION OF COMPLETION/REVOCATION OF PERMIT TO WORK
-
Permit
-
I have completed the permitted works and have make good the affected work area for the closure of this permit
-
Name
-
Remarks