Title Page

  • Permit Number

  • Contracing Company

  • Location
  • Conducted on

  • Prepared by

  • Scope of Works

  • Permit valid from

  • Permit valid to

Isolation/Lock Out/Tagout

  • Are the following equipment/materials isolated or locked out before any maintenance or installation work:

  • Electricity

  • Point of Isolation

  • Gas

  • Point of Isolation

  • Water

  • Point of Isolation

  • Air

  • Point of Isolation

  • Fire Alarm System

  • Point of Isolation

  • Fire Sprinkler System

  • Point of Isolation

Precautions

  • Click + to list precautions

  • Precaution
  • Enter details here

Tools and Equipment

  • Click + to list tools and equipment to be used

  • Tool
  • Enter details here (e.g. Scaffold, PPE, Welding sets, 110V Tools etc.)

Completion

  • Full Name and Signature of Contractor Site Supervisor

  • Full Name and Signature of Client Authorizing Person

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.