Scope Requirements
-
Is the scope related to the PAH Store?
-
What works are to be carried out within the PAH Store?
-
Take existing photos of the existing
-
Is the Scope related to the Groomers?
-
What works are to be carried out?
-
Take existing photos of the existing
-
Is the scope related to the Vets?
-
What works will be carried out?
-
Take photos of the existing
External - Front and Signage
-
Is new signage required?
-
Is the main sign to be changed and are there any Totems to be changed?
-
Are Window Vinyls to be updated?
-
Are the external Poster Frames to be updated?
-
Does the Entrance shopfront require resprayed?
-
IS there any work required to the trolley bay?
-
Will the externals require Jet Washing?
-
Is there any other remedial works that will be required to the external areas and shopfront?
External - Rear and Signage
-
Is there any signage to the rear that will need to be changed?
-
Is there Paladin fencing in place? if so is repair or new fencing required
-
Is there existing AC set up externally?
-
Is there an existing soak away for the AC set up?
-
Can a new Soak away be added?
-
Is there Space for containers?
-
What are the issues with the rear yard space?
-
Are there any Bollards to be decorated?
-
Do the existing Fire Exit doors and or Warehouse doors need works carried out, Decorations? Repair? New Ironmongery etc?
-
Is there any works required to the existing Roller Shutter?
-
Is there any Signage required to be replaced on the side elevations of the building?
General Store Information
-
Are works required to the Flooring within Store?
-
What is the ceiling height within store?
-
Are there any AC units in store?
-
Will AC units need to be replaced?
-
Is there any destratification works to be carried out?
-
Is there any plumbing wastes required?
-
Is the existing drainage pumped or gravity fed?
-
Is there any CCTV works required to be carried out?
-
Is there any access control works to be carried out?
-
Where are the water mains shut of valve to the building?
-
Please take image of the Electrical distribution services
-
Is there any works required to skylights or soffits?
-
Are there any new wall linings required?
Internal - Front Elevation
-
Location of Alarm Panel / Fire Panel?
-
Location of any equipment /IT/Defibrillator adjacent to front doors?
-
Do the existing entrance doors need spraying internally?
-
Any works required to the entrance flooring?
Internal - Left Hand Elevation
-
Any decorations required
-
Are there any unusual column / details?
-
Any New Signage internally required?
-
Please take images of all the existing signage internally within this area?
Internal - Right Hand Elevation
-
Any decorations required?
-
Are there any unusual column / details?
-
Any New Signage required?
-
Please take images of all the existing signage internally within this area?
External - Rear Elevation
-
Any decorations required?
-
Are there any columns / unusual details?
-
Any new Signage required?
-
Please take images of the existing signage internally within this area?
-
Are there any works needed to the warehouse doors from off sales?
-
Is there a separate colleague entrance door off sales?
-
Any works required to this door?
-
Is there an existing fire curtain?
-
Any works required to the existing fire curtain?
Existing Mezzanine - Under Mezzanine
-
Is the lighting under the Mezzanine okay?
-
Do the lights need to be replaced in part or full?
-
Are the ceiling tiles under the mezzanine fire rated and in good condition?
-
Are there any AC works required under the Mezzanine?
-
What is the ceiling height from FFL to underside of the Mezzanine?
Existing Lift
-
Is there an existing lift?
-
Are any repair works, signage works required?
Existing Tills
-
Is the desk to be replaced or refurbished?
-
How many tills are there currently?
Existing Pet Village and Adoption
-
Is a new Pet Village required?
-
Is there any repair work needed to the existing Pet Village?
-
Is there existing Power and Data to the Pet Village?
-
Does the Pet Village require new signage?
-
Does the Adoption need to be replaced or refurbished?
-
Does the Adoption need new Signage?
Existing Aquatics
-
Is a new Aquatics unit required?
-
Does the existing Aquatics need refurbishing?
-
Any new Signage required?
-
Will need aquatics flooring be required?
Pets Office Space
-
Are works to be carried out within the office space?
-
Any new Units required?
-
Is new flooring required?
-
Is new lighting required?
-
Is the AC unit to be replaced?
-
Any unitary required?
-
Any modifications off data and Power required?
-
If new data cab required? is the wall it is to be fixed suitable to hold the cabinet?
Pets Colleague Space
-
Are works to be carried out within the Colleague Space area?
-
Is a full new refurbishment required?
-
New Flooring?
-
New Lighting?
-
New AC?
-
Any Furniture required?
-
Any other Works?
Pets QI Room
-
Any works required within the QI Room?
-
New Flooring required?
-
New Plinths and Shelving required?
-
New Lighting required?
-
New Heater or AC required?
-
New Ceiling tiles required? Full or part?
-
Is any wall Cladding or Decorations required?
Isolation Room
-
Are any works required within the isolation room?
-
New flooring required?
-
New Plinths and Shelving Required?
-
New Lighting required?
-
New Heater or AC required?
-
New Ceiling tiles required? Full or Part?
-
Is any wall cladding or decorations required?
Food Preparation
-
Are any works required to this area?
-
New Unitary or shelves required?
-
New lighting required?
-
Is new Flooring required?
-
Is there any plumbing works required?
-
Will the ceiling tiles need to be replaced? full or part?
-
Will any wall cladding and or decorations be required?
Pets WC's (repeat as necessary)
-
Any works required to the WC?
-
Is there any wall cladding and or decorations required?
-
Is the new cladding just splashbacks or half height?
-
Is new lighting required?
-
Is new sanitary ware and or new grab handles required?
-
If Sanitary ware required, what plumbing works are necessary? is the existing waste gravity or pump fed?
Warehouse
-
Are works to the warehouse required?
-
Is the Yellow lining to be refreshed?
-
Is the existing cleaners sink ok and in good order?
-
Any MDF wall protection to exposed areas required?
-
Is new racking or racking moves required?
-
Is there any works required to the ceilings? Full or Part?
-
Is a cleaners cage required?
-
Is the existing floor slab in need of repair?
-
Are the Warehouse doors requiring decorations and new Ironmongery?
Existing Pets Distribution Boards, DP and Data Cab
-
Where are these located?
Groomers - External
-
Any works required to the external of the Groomers?
-
Are new decorations required?
-
Are new signage or Vinyl's required?
Groomers - Internally
-
Are any works required within the Groomers salon?
-
Is this a full or part refurbishment?
-
Is new decorations and wall cladding required?
-
Is new flooring required?
-
Is new Lighting and Power required?
-
Is new AC required?
-
How many groomers tables are there currently
Groomers BOH
-
Any works required to this area?
-
Is a full refurbishment required?
-
Does the area require wall cladding and decorations?
-
Is new flooring required?
-
Does the ceilings require new ceiling tiles- Full or Part?
-
Is new lighting required?
-
Are new doors and ironmongery required?
-
Are new Baths / Showers required?
-
Water cylinder? need replacing or is a new one required?
-
How many existing cages are there?
-
Any other equipment needed?
-
Is AC required new or replacement?
Groomers Counter
-
Any works required to the groomers counter?
-
Is this to be a new counter?
-
What works will be required to the existing counter?
-
Where is the existing Data Cabinet for the Groomers located?
Vets
-
is there a Vets, either existing or planned?
undefined
-
Vets Reception
-
Any works required to the Vets reception
-
Is the branding up to date? will this be a new brand?
-
Is flooring required?
-
Are new decorations required?
-
Is there to be cladding to the walls, full or half height?
-
Is there to be cladding applied to the reception doors?
-
Is there cladding currently to the doors?
-
Is new lighting required?
-
Is there to be work carried out on the ceilings?
-
Is new AC required?
-
How many Cats waiting chairs/seats are there?
-
Are these to be new? what type required?
-
How many dog waiting seats are there?
-
Are these to be new? what type required?
-
Is a new desk required?
-
What type of desk is required?
-
What is the ceiling height?
Consult Room
-
Number of Consult Room? (add rooms as required)
-
Is there any works required to this room?
-
New Flooring required?
-
New Decorations or wall cladding required?
-
New lighting required?
-
Works on ceilings required? full or Part?
-
New AC required?
-
New Unitary required?
-
New Doors and or Ironmongery needed?
-
Existing ceiling Height?
Pharmacy
-
Any works required to the pharmacy?
-
Is new flooring required?
-
Are decorations required?
-
Is Wall cladding required or splashbacks?
-
Is new lighting required?
-
Is there to be works on ceilings? new tiles etc?
-
Is new AC required?
-
Is new unitary and or worktops required?
-
Are new doors and or ironmongery required?
Prep and Lab Areas
-
Is any works in these areas required?
-
Is new flooring required?
-
Is cladding required to existing or exposed walls?
-
Is new lighting required?
-
Is there any works to the ceilings? full or part?
-
Are any works to the AC required?
-
Are any new units and or worktops required?
-
Is there sufficient drainage? Gravity or pump fed?
-
Any additional Oxygen points required?
Operations Theatre
-
Any works required to the operations theatre?
-
Is new flooring required?
-
Is any wall cladding required?
-
Is New Lighting required?
-
Any works required to the ceilings? full or part?
-
Any works required to the AC?
-
Will any unitary be required?
-
Will there be any works to doors and or ironmongery?
-
Is pass through needed?
-
Will the Operations theatre be full glazed? wall with window?
-
Any additional oxygen required?
Xray Room
-
Any works required to the Xray rooms?
-
Is new flooring required?
-
Are decorations required?
-
Will there be a requirement for cladding to the walls?
-
Is new lighting required?
-
Will there be any works on the ceilings? full or part?
-
Is new unitary or worktops/shelving required?
-
Will there be works to the doors and or ironmongery required?
-
Will Xray require relocating?
-
Will this be a new all existing Xray unit?
Dental Room
-
Will there be a requirement for works in the Dental room?
-
Is new flooring required?
-
Is new decorations required?
-
Will cladding be required to the walls?
-
Is new lighting required?
-
Will any works be required to the ceilings?
-
Will any new units or worktops/shelving be required?
-
Will there be any works to doors or ironmongery?
-
Is there existing plumbing drainage? gravity or pumped?
-
Is there a Dental Xray?
-
Will this be relocated, moved to allow wall finishes?
-
Is a new dental XRay required?
-
Will the room need to be brought up to specification?
Pet Wards
-
What is this ward Dog / Cat / ISO / Exotics or other? (add rooms as required)
-
Will any works be required within this ward?
-
Will new flooring be required?
-
Will decorations be required?
-
Will ward cladding be required?
-
Will there be any works to ceilings required?
-
Is new lighting required?
-
Will new AC be required?
-
Will new Unitary, worktops or shelving be required?
-
Are new doors / ironmongery required?
-
Any additional Oxygen supplies required?
-
Is a new sink required?
-
How many walk in kennels are there?
-
How many cages are there?
-
Is the plumbing gravity or pump fed?
Vets Office Space
-
Will works be required to create or refurbish an office space?
-
Is new flooring required?
-
Is new decorations required?
-
Is new lifghting required?
-
Will there be works to the ceilings?
-
Is new AC required?
-
Will any unitary or worktops / Shelving be required?
-
Any requirements to carryout works to doors and or ironmongery?
Vets Colleague Space
-
Is there a separate colleague space for Vets?
-
Will this become a new shared colleague space?
-
If separate will any works take place to the colleague space?
-
Will new flooring be required?
-
Will new decorations be required?
-
Will new lighting be required?
-
Will new AC be required?
-
Will new unitary / worktops or shelving be required?
-
Will there be any works to the doors and or ironmongery?
-
Is there existing plumbing? gravity or pump fed to the drainage?
Laundry Room
-
Will there be any works within the Laundry Room?
-
Will new flooring be required?
-
Will new lighting be required?
-
Will new decorations be required?
-
Will there be any works to the ceilings?
-
Will new unitary be required?
-
Any works on doors or ironmongery required?
-
Is the existing plumbing drainage gravity or pump fed?
WC (repeat as necessary)
-
Toilet type
-
Will there be any works to the WC?
-
Will decoration works be required?
-
Will new flooring be required?
-
Will new lighting be required?
-
Will works to ceilings be required?
-
Will new Sanitary Ware be required?
-
Will wall cladding or splashbacks be required?
Fire Escapes / Landing Areas
-
Any works required to the landing areas?
-
What works will need to be carried out?
Vets Services
-
Where is the existing Data Cabinet and Distribution Boards located?
Any other notes
-
Any other works that maybe required?
Media Overview
-
Any images you may feel important to share